ML20148B126

From kanterella
Jump to navigation Jump to search
Forwards Rev to Security Plan Dtd 780926.Revs Reflect Latest Changes to Proposed Security Sys & Procedures.Encl Withheld (Ref 10CFR2.790)
ML20148B126
Person / Time
Site: Browns Ferry, 05000290  
Issue date: 10/25/1978
From: Gilleland J
TENNESSEE VALLEY AUTHORITY
To: Ippolito T
Office of Nuclear Reactor Regulation
Shared Package
ML20148B129 List:
References
NUDOCS 7810310076
Download: ML20148B126 (79)


Text

"

t TENNESSEE VALLEY AUTHORITY CH ArTANCOGA. TENNESSEE 374ol s

830 Power Building l

OCT 251978 Director of Nuclear Reactor Regulation Attention:

Mr. Thomas A. Ippolito, Chief i

Branch No. 3 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear'Mr. Ippolito:

In the Matter of the

)

Docket Nos. 50-259 Tennessee Valley Authority

)

50-260 50-296' Enclosed are revisions to copies 6 through 10 of the Browns Ferry Physical Security Plan dated September 26, 1978. These revisions reflect the latest changes in the proposed security systems and procedures.

The enclosed revisions are marked PROPRIETARY and sheuld be withheld from public disclosure as provided for in 10 CFR Part 2. 790.

These revisions are the property of TVA and instructions for their handling are provided on the cover sheet of each revision.

Included is a receipt form for each revision which must be signed and dated by the responsible individual for each plan and returned to TVA with all superseded material removed from each plan as a result of this revision.

Very truly yours,

/Yet ph

/J. E. C111 eland Assistant Manager of Power Enclosures.

?S10310074 i

Ar 32 a C C, T r*.

l' iP C. 0 ; er

SECURITY PLAN DISTRIBUTION PURSridNT TO'SFCTION 73.55

~

' - ~

A

.NRCDOQM 195 U.s. aucLEAR QEQuLATCQY COMMISSION DOC %ETR' ER 50-25 260'296

G 78)

NRC DISTRIBUTION FOR PART 50 DOCKET MATERI AL w

ATs OP occuMENT ye M5sse Valley Authority 0:

10/25/78 Mr. Thomas A.

Ippolito Chattanooga, Tennesse 37401 DATE RECEl'!E D J. E. Gilleland 10/27/78 l, tNPUT PO RM NUMBER OF COPtES RECEIVED (LETTEQ O NOTO RIZE O PROP IORIOLNAL QusCLAssiPiEo XXXXXXXX 1 Signed OcOPY

~

CESCQlPTION ENCLOSURE LTR PURSUANT TO PART 73.55...

Consists of revisions to the Browns REQUESTING WITHHOLDING OF INFO FROM Ferry Physical Security Plan dated Sept 26, PUBLIC DISCLOSURE...TRANS THE FOLLOWING 1978, which reflects the latest' changes in PROPRIETARY INFO...

the proposed security systems and procedures...

PLANT NAME:

BROWNS FERRY UNITS 1, 2C3

]

f*DENOTESWITHOUTPROPRIr?ARYINFO

( LISTRIBUTION PER BILL ROSS )

NOTE: 5 ENCL'S REC'D f

t j

i i

FOR ACTION /INFORMdTION l

BR ANCH CHIEF

I PROJECT MANAGER *

'_l LQKNSING ASSISTANT

INTERNAL DISTRIBUTION

'I g

REG FTLES'- CY di J

I R.

A. CYHR~~D ESd 2 -5 l'

NMC PDR

  • L WN i

Wew i

reng.

  • ATHENS, AL i

vng.

  • CAT: B l

i

_i t

t l

1 I

~

l i

i

+

I I

! I i

EXTERN AL OlSTRIBUTION CONTROL NUMBER

~

i t,

i i

i I

i

}

h

~

f i

..