IR 05000259/1977026

From kanterella
(Redirected from ML20148B117)
Jump to navigation Jump to search
Insp Repts 50-259/77-26,50-260/77-26 & 50-296/77-26 on 771213-16.Noncompliance Noted:Vital Green Area Gate Unopened & Unattended.Details Withheld (Ref 10CFR2.790)
ML20148B117
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/03/1978
From: Alderson C, Bradford W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20148B078 List:
References
50-259-77-26, 50-260-77-26, 50-296-77-26, NUDOCS 7810310074
Download: ML20148B117 (5)


Text

ISTET.ifl U f

/J"

-

-

00! iia'.3 2.7G !.:.;_....M

-

-

'i

.

.

  1. "84 UNITED STATES (p(k

.p NUCLEAR REGULATORY COMMISSION

,

,

'o5 g

~

n REGION il

$

230 PE ACHTRE E STREET, N.W. SUITE 1217 3~ #

ATL ANTA, GEORGI A 30303 o,

%,

p$

.....

Report Nos.:

50-259/77-26, 50-260/77-26 and 50-296/77-26 Docket Nos.:

50-259, 50-260 and 50-296 License Nos.:

DPR-33, DPR-52 and DPR-68 Licensee: Tennessee Valley Authority 830 Power Building Chattanooga, Tennessee 37401 Facility Name:

Browns Ferry Units 1, 2 and 3 Inspection at:

Browns Ferry site, Athens, Alabama Inspection conducted:

December 13-16, 1977 Inspectors:

W. H. Bradford D

J.

urke m i

Reviewed by:

D_

PA b v-----

-

17 3.0 1]

C. E.

11erson, Acting Chief Dat Nuclear upport Section No. 2 Reactor Operations and Nuclear Support Branch Inspection Summary Inspection on December 13-16, 1977 (Report Nos. 50-259/77-21 50-260/77-26 and 50-296/77-26 Areas Inspected:

Routine, unannounced inspection of the plant fire prevention and protection systems and certain plant operations.

The inspection involved 54 inspector-hours on site by two inspectors.

Results:

In the three areas inspected, no items of noncompliance were t

found in two areas and one apparent item of noncompliance (infraction -

vital area gate open and unattended (77-26-01) - Details II) was identified in the other.

7810310o7Y

Wi. TEN!1ir'."C' *b ','m'a'r[g 00Hi?.! :'; 2fi. >. 1 '; ;:1 i

.

.

.

. _ _ _ _

______

._

. -. _ _ _

L......;........2---..'r-.. y

.

'

..

C L.. i.., -..

-

-

RII Rpt. Nos. 50-259/77-26, 50-260/77-26 and 50-296/77-26 I-1

!

DETAILS I Prepared by:

IC.

. A-l_ R ]3 D.J.jlurke, Reactor Inspector at'e k Nuclear Support Section No.

Reactor Operations and Nuclear Su port r<nch f

. _% u

-

A3s ]

.

W.H.radord,ReactorInspector Dat Nucleat Support Section No. 2 Reactor Operations and Nuclear Support Branch Dates of Insp e io D 'mber 13-16, 1977 - Reviewed by: QA4 tit----- ll.

O ] . C. E. Alderson, Acting Chief Late Nuclear Support Section No. 2 Reactor Operations and - Nuclear Support Branch 1.

Persons Contacted (TVA)

  • J. G. Dewease, Plant Superintendent
  • J. B. Studdard, Operations Supervisor R. Ilunkapiller, Assistant Operations Supervisor
  • G. Campbell, Outage Director D. Jent, Mechanical Engineer D. B. Thompson, Electrical Engineer R. E. Porterfield, Safety Engineer / Fire Marshall W. Kinsey, Mechanical Engineer, Results Section J. Teague, Assistant Maintenance Supervisor R. McGee, QA Engineering Aide Several Shift Engineers, Assistant Shift Engineers, and Unit Operators
  • Denotes those present at the exit interview.

' 2.

Licensee Action on Previous Inspection Findings Not inspected.

3.

Unresolved Items None identified during this inspection.

' ' ..g 7..-

i -- n l

,, COW <a- ." " d - .

g 7-1 -~ - * ' ,,, m.,,,.g Cb;ln..... .a . RII Rpt. Nos. 50-259/77-26, 50-260/77-26 and 50-296/77-26 1-2 4.

Exit Interview The inspectors met with licensee representatives (denoted in paragraph 1) at the conclusion of the inspection on December 16, 1977.

The ' inspectors summarized the scope and findings of the inspection, and specifically addressed the station fire prevention and protection program as described in Paragraph 5, Details I, and the item of noncompliance described in Details II.

5.

Fire Prevention and Protection The inspectors reviewed certain licensee actions and fire equipment installations which are described in the Browns Ferry Units 1 and 2 Safety Evaluation Report (SER) published in March, 1976, and Supplements, and in the Recovery Plan, Part X.

A facility inspection of the installed fire prevention and protection systems of Units 1, 2, and 3 was also conducted.

The fire protection program inspection included plant design features, personnel, equipment, and procedures.

The findings were compared to licensee commitments, Appendices A and B to 10 CFR 50, Regulatory Guides, including RG 1.120, " Fire Protection Guidelines for Nuclear Power Plants," and RC 1.39, " Housekeeping Requirements for Water-Cooled Nuclear Power Plants," and the facility Technical Specifications, Sections 3.11 and 4.11.

Within the areas inspected, no items of noncompliance or deviations were identified.

Fire Restoration Commitments - The inspectors reviewed TVA a.

commitments, made to the NRC, to have certain fire protection system (FPS) installed and operable prior to the end of the first refueling outage. Many of these FPS installations or modifications are described in the SER dated March, 1976, and its Supplements, as well as the BFNP Recovery Plan, Part X.

The inspectors verified that the plant modifications and work plans were properly documented and reviewed; at the time of the inspection, several FPS installations or modifications, including post-modification testing, were in progress.

The licensee stated that his commitments will be fulfilled prior to startup of Unit 1.

The inspectors also verified that certain fire stops and floor dams have been installed, that many additional heat and smoke detectors have been installed and tested, and that cable trays and Flamemastic coated cables (cocoons) have been inspected as described in the SER.

The inspectors had no further questions, b.

Fire Protection Systems (FPS) Technical Specifications - The inspectors verified that proper Surveillance Instructions (SI) or tests were performed over the past year to demonstrate operability of the FPS as required by Section 4.11 and Table 3.ll.A of the Browns Ferry Technical Specifications.

gg.1 -...... L.,..'. og CL.

__ _ _ _ - _ _ - ___ CJO'"I

p " - - +,' ',.e_,,,,,IU Co ' ~ ~~ ~<- - w..a..._....,,,q , RII Rpt. Nos. 50-259/77-26, 50-260/77-26 and 50-296/77-26 I-3 One question was identified with regard to Section 3.11.D of the Technical Specifications which states, "A roving fire watch will tour each area in which automatic fire suppression systems are to be installed (as described in the Recovery Plan, Part X) at intervals no greater than two hours." The i Unit 1 and 2 cabic spreading room (A) is to have an automatic C0 fire suppression system and a manually actuated pre-action

water sprinkler system as described in the Recovery Plan, Part X.

At the time of the inspection, the automatic initiation logic of the CO system was n t perable due to the potential

hazard of asphyxiation to personnel working on installations or modifications in the cable spreading rooms.

In addition, the manually actuated pre-action sprinkler system is still in the process of being installed.

Thus, according to TS 3.11.D, it appears that a roving fire watch should tour the cable spreading room (CSR) every two hours.

The licensee stated that the fire (heat and smoke) detectors in the CSR are operable and serve to monitor this area. When work is in progress in the CSR, a' fire watch is established.

In addition, a roving fire watch tours the area just outside the secured CSR every hour; however, entry into the CSR during these tours could not be verified by the inspectors.

The licensee stated that the roving fire watch will tour the CSR every two hours until the CSR fire suppression systems are installed. The inspectors stated that the fire watch tours will be re-examined during subsequent inspections, and had no further questions.

c.

General Tour of Fire Areas During a tour of the various plant areas, the inspectors observed the following with regard to fire protection and prevention: (1) Combustible polyurethane type foam material was found sealing spacings between structural members (I-beams and concrete walls) in the "A" cable spreading room (CSR).

The licensee also observed some polyurethane type foam in the metal ceiling of the CSR, and has generated a trouble report to remove and replace all combustible materials in these vital areas.

(2) Duct tape was found around certain cables and on certain cable trays in the cable spreading room (A).

Since this tape is combustible, the licensee stated that the tape would be removed from these areas.

EUII"1T." ~ D DlTH ~ P C0Jii m: :.. . E.j,1 ,, , .. _ _ _ _. __

- - - - - - - - - - - - '. ..... ' - ' = - - . . . - U/,C'"'- ' - ,,f.... [N [ 0 0.1...... t,

. a RII Rpt. Nos. 50-259/77-26, 50-260/77-26 and 50-296/77-26 I-4 (3) The Unit 1 and 2 emergency diesel / generator building upper level has pipe or conduit sleeves in the floor which are not sealed. The inspectors noted that about i half of the several floor sleeves observed were sealed with RTV compound.

Since these upper levels are protec-ted by CO fir suppression systems, the licensee stated

that the open floor sleeves or penetrations would be scaled to prevent loss of CO through the sleeves if the sys, tem were to be activated.2 6.

Plant Operations The inspectors toured the reactor control rooms and observed general plant operations.

Certain nuclear and process instru-mentation indications were reviewed, and the inspectors continued the followup on the shoe cover which was lost into the Unit 1 reactor vessel during the outage.

No items of noncompliance or deviations were identified. Other Region II inspectors are continuing to follow licensee actions with regard to the lost shoe cover.

,,,. 3,,... -. *- -.. 1- - e. g C d.. l i .. __ _ _ _ - _ _ _ _ _ }}