Forwards Inspec Rept 99900293/78-01 on 780925-26 During Which No Items of Noncompliance Were Noted
ML20148A816
Person / Time
Issue date: 11/06/1978
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Capron L
GULF & WESTERN INDUSTRIES, INC.
Shared Package
ML20148A819 List:
References
REF-QA-99900293 NUDOCS 7812290263
Download: ML20148A816 (2)


Text

. - -,

,Q pn asc UMITED STATi a, f

{o NUCLEAR REGULATORY L.

slON A

REoion iv -

3t

.3 611 RYAN PLAZA DRIVE,SulTE 1000

  • [,

g AR LINGTCN. TEXAS 11 s., v. p -

g ticy

+....

Docket - No.- 99900292/7b 31 Energy. Products Group Gulf and Western Manufacturing Co.

ATTN: Mr. L. P. Capron QA Manager 235 Kilvert Street Warwick, Rhode Island 02886 Gentlemen:

This refers to the QA Program inspection conducted by Mr. J. W. Sutton of this office on September 25-26, 1978, of your Mlity at Warwick, Rhode Island, associated with the manufacture i tuelear valves and to the discussion of our findings with Dr. J. F. Wal?

.nd members of your staff ao the conclusion of the inspection.

This inspection was made to confirm that, in the areas inspected, your QA Program is being effectively implemented..The inspection effort is not designed to assure that unique quality requirements imposed by a customer are being implemented; nor to assure that a specific product, component or i

service provided by you to your customers, is of acceptable quality.

As you know, the NRC requires each of its licensees to assume full responsibil-ity fu 'he quality of specific products, components or services procured from otht:rs. You should therefore not conclude that the NRC's inspection exempts you from inspections'by an NRC l'.c asee or his agents nor from taking effective corrective action in res:xnse to their findings.

J Areas examined during the inspection and our findings are discussed in the j

enclosed report.

Within these areas, he inspection consisted of an examination af procedures and representative records, interviews with parsonnel, and observations by the inspector.

Within the scooe of this 'nspection, we found no instance where you failed to meet NRC requirement.c.

In accordance with Section 2.790 of the Commission's " Rules of Practice,"

Part 2, Title 10.. Code of Federal Regulations, a copy of this letter together with the enclosed inspection report will be placed in the Commission's Public Document Room.

If this report contains any information that you believe to be prop (30) days to this office to withhold such rietary, it is necessary that you make a written appl' cation within thirty information from public disclosure. Any such application must include a full statement of the reasons'on the basis of which it is claimea that the l-information is proprietary, and should be prepared so that proprietary information identified -in the applicatim.is contained in a separate part u

781229 oWb 1

J

Energy Products Group of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,O

,t x

_/

,1.(Cl4 3 d(Lfg(p 5

Uldis Potapovs, Chibf Vendor Inspection Branch

Enclosure:

Inspection Raport No. 99900293/78-01 e