ML20148A627

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Sequoyah Nuclear Plant Unit 1 Cycle 9, Colr
ML20148A627
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 05/02/1997
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20148A631 List:
References
NUDOCS 9705090104
Download: ML20148A627 (2)


Text

.

IUA Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37379-2000 l

May 2,1997 U.S. Nuclear Regulatory Commission j

ATTN: Document Control Desk Washington, D.C. 20655 Gentlemen:

i in the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

SEQUOYAH NUCLEAR PLANT (SQN)- UNIT 1 CORE OPERATING LIMITS REPORT (COLR) in accordance with the SON Unit 1 Technical Specifications 6.9.1.14.c, enclosed is the Unit 1 Cycle 9 COLR.

Please direct questions concerning this issue to Keith Weller at (423) 843-7527.

Sincerely, e

R. H. Shell Site Licensing and Industry Affairs Manager Enclosure cc: See page 2 9

i

\\

n.~

~

9705090104 970502 PDR ADOCK 05000327 P

PDR m

I.I. I.li ll I.ll.i llll Ill

U.S. Nuclear Regulatory Commission Page 2 May 2,1997 cc (Enclosure):

Mr. R. W. Hernan, Project Manager Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike 4

Rockville, Maryland 20852 2739 l

l NRC Resident inspector Sequoyah Nuclear Plant l

2600 Igou Ferry Road

' Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region 11 61 Forsythe St., SW, Suite 23T85

~ Atlanta, Georgia 30323-2711 i

l i

k t

i t