ML20148A355

From kanterella
Jump to navigation Jump to search
Forwards Draft of Best Estimate FRAP-T4 Analyses of Selected Pwr Reactor Transients & Acccidents. Notification of 790112 Meeting on Inel Fuel Damage
ML20148A355
Person / Time
Issue date: 12/19/1978
From: Tokar M
Office of Nuclear Reactor Regulation
To: Owsley G
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
Shared Package
ML20148A360 List:
References
NUDOCS 7812280324
Download: ML20148A355 (1)


Text

4 udgtra,p y .

j  % UNITEDSTATES 3 % .. k NUCLEAR REGULATORY COMMISslON j fI I*

j s

WASHINGTON, D. C. 20555 1

%, %.* ,/ l l

DEC 191978 Mr. G. F. Owsley, Manager l Reload Licensing l Exxon Nuclear Company, Inc. THIS DOCUMENT CONTAINS 2101 Horn Rapids Road POOR QUAUTY PAGES P. O. Box 130 ,

Richland, Washington 99352 l

Dear Gerry:

l Enclosed are some recent results, in the form of a draft report, on our Fuel Damage technical assistance subtask at Idaho Nuclear Engineering Laboratory (INEL). The results include best-estimate analyses of some postulated transients and accidents for which input data were provided by specified vendors to the FRAP-T fuel transient analysis code, which is under development at INEL.

We are planning to hold an information meeting on the INEL Fuel Damage work at 9:00 a.m. on January 12, 1979 in room P-114 of the Phillips Building. These results and possible future work will be discussed by D. R. Coleman of INEL. I urge you (or your designate) to attend the /

meeting and participate in the discussion. Please notify me of your plans in this regard. Any comments and suggestions you may have con-cerning this work will be appreciated.

Regards, f/

Michael Tokar l Reactor Fuels Section Core Performance Branch Division of Systems Safety <

Office of Nuclear Reactor Regulation

Enclosure:

Draft Report cc: R. Tedesco W. Johnston-G. Marino D.Coleman(INEL) '

J. Dearien (INEL)

C.Hann(PNL) l i

PDR

, 6") 78122803 %

i

..