ML20148A333

From kanterella
Jump to navigation Jump to search
Forwards Vols I,Ii & III to Umtrap Green River,Ut,Grn, Calculations,Final Design Review. Summary of Changes Incorporated Into Remedial Action Plan (RAP) & Comments on Draft Rap,On Preliminary Design & Final Designs Also Encl
Date released: 06/10/2020 Download: ML20148A333


Vol Ii,App D to Final UMTRAP-DOE/AL050510.GRN0, Remedial Action Plan Final Design for Stabilization of Inactive U Mill Tailings at Green River,Ut. W/Five Oversize Drawings
ML20148A447
Person / Time
Issue date: 02/29/1988
From: Arthur W
ENERGY, DEPT. OF
To:
References
REF-WM-68
Download: ML20148A447 (758)
Final Vol I of UMTRAP-DOE/AL050510.GRN0, Remedial Action Plan Final Design for Stabilization of Inactive U Mill Tailing at Green River,Ut:Text,Apps A,B & C.
ML20148A391
Person / Time
Issue date: 02/29/1988
From: Arthur W
MORRISON-KNUDSEN ENGINEERS, INC.
To:
References
REF-WM-68
Download: ML20148A391 (170)
Addendum 1 to Umtrap Green River,Ut,Grn Calculations - Final Design for Review.
ML20148A384
Person / Time
Issue date: 02/29/1988
From:
MORRISON-KNUDSEN ENGINEERS, INC.
To:
References
REF-WM-68
Download: ML20148A384 (265)
Vol I of Umtrap Green River,Ut,Grn,Info for Bidders: Demolition & Decontamination of Structures & Facilities.
ML20148A375
Person / Time
Issue date: 12/31/1987
From:
MORRISON-KNUDSEN ENGINEERS, INC.
To:
References
REF-WM-68
Download: ML20148A375 (120)
Final Vol Iii,App E of UMTRA-DOE/AL 050510.GRN0, Remedial Action Plan Final Design for Stabilization of Inactive U Mill Tailings at Green River,Ut.
ML20148A348
Person / Time
Issue date: 02/29/1988
From:
MORRISON-KNUDSEN ENGINEERS, INC.
To:
References
REF-WM-68
Download: ML20148A348 (215)
Vols II & III of Geotechnical Info of Umtrap Green River, Ut,Grn Info for Bidders.
ML20148A341
Person / Time
Issue date: 12/31/1987
From:
MORRISON-KNUDSEN ENGINEERS, INC.
To:
References
REF-WM-68
Download: ML20148A341 (514)
Vols I-III of Umtrap Green River,Ut,Grn,Calculations,Final Design Review.
ML20148A335
Person / Time
Issue date: 11/30/1987
From:
MORRISON-KNUDSEN ENGINEERS, INC.
To:
References
REF-WM-68
Download: ML20148A335 (801)
Forwards Vols I,Ii & III to Umtrap Green River,Ut,Grn, Calculations,Final Design Review. Summary of Changes Incorporated Into Remedial Action Plan (RAP) & Comments on Draft Rap,On Preliminary Design & Final Designs Also Encl
ML20148A327
Person / Time
Issue date: 03/03/1988
From: Arthur W
ENERGY, DEPT. OF
To: LOHAUS P
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
REF-WM-68
Download: ML20148A327 (3023)