Submits Notification of SG Tube Plugging During Unit 1 Cycle 8 Refueling Outage
ML20148A091
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 05/01/1997
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9705080073
Download: ML20148A091 (13)


Text

..

I

.c t

m 1

nn Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37379 2000 i

May 1,1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk i

Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket No. 50-327 Tennessee Valley Authority

)

SEQUOYAH NUCLEAR PLANT (SON)- UNIT 1 STEAM GENERATOR (SG) TUBE PLUGGING As required by SON Technical Specification (TS) 4.4.5.5.a, this submittal provides notification of SG tube plugging during the Unit 1 Cycle 8 refueling outage. The in-service inspection of the Unit 1 SG tubes was completed on April 26,1997. In accordance with SON TS 4.4.5.5.b, TVA will submit a special report of the results of this inspection on or before April 25,1998.

Enclosed is a summary of the tubes plugged during the Unit 1 Cycle 8 refueling outage.

Please direct questions concerning this issue to D. V.Goodin at (423) 843-7734.

Sincerely, R. H. Shell Site Licensing and Industry Affairs Manager D obD'I Enclosure cc: See page 2 9705080073 970501 PDR ADOCK 05000327 2

P PDR s

0?0059

I l

1 l

U.S. Nuclear Regulatory Commission Page 2 May 1,1997 cc (Enclosure):

Mr. R. W, Hernan, Project Manager Nuclear Regulatory. Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region 11 l

Atlanta Federal Center 61 Forsythe St., SW, Suite 23T85 Atlanta, Georgia 30323-2711 l

i l

i i

l i

l l

a-s-.

4 e

4, 4

ENCLOSURE SEQUOYAH NUCLEAR PLANT UNIT 1 CYCLE 8 REFUELING OUTAGE STEAM GENERATOR TUBE PLUGGING

SUMMARY

t I

e Steam Generator 15 Day Plugging Report Sequoyah Unit 1 Cycle 8 SG ROW COL INDICATION CHARACTERIZATION RESOLUTION Sample: 0 1

1 53 SAI PWSCC U-BEND PLUG 1

2 40 MAI PWSCC <2V HC PLUG

)

1 4

72 SAI PWSCC <2V HC PLUG 1

6 94 SAI PWSCC TSP PLUG 1

7 72 SAI PWSCC <2V HC PLUG 1

11 45 SAI PWSCC <2V HC PLUG l

1 11 54 SAI PWSCC HTS PLUG 1

12 50 SAI PWSCC TSP PLUG 1

12 57 MCI PWSCC HTS CIRC PLUG 1

12 66 SCI ODSCC TSP CIRC PLUG 1

13 54 SAI PWSCC HTS PLUG 1

1 13 57 SCI PWSCC HTS CIRC PLUG j

1 25 38 SCI PWSCC HTS CIRC PLUG 4

1 25 39 SCI PWSCC HTS CIRC PLUG I

25 41 SCI PWSCC HTS CIRC PLUG I

26 38 SCI PWSCC HTS CIRC PLUG I

30 42 SCI PWSCC HTS CIRC PLUG 1

30 83 SAI PWSCC TSP PLUG 1

32 57 SAI PWSCC HTS PLUG l

1 33 73 SAI PWSCC HTS PLUG 1

33 78 SAI ODSCC TSP PLUG 1

34 57 SAI PWSCC HTS PLUG 1

34 59 SAI PWSCC HTS PLUG 1

37 44 SCI PWSCC HTS CIRC PLUG 1

38 64 SCI PWSCC HTS CIRC PLUG 1

39 44 SAI PWSCC HTS PLUG 1

39 57 SAI PWSCC HTS PLUG 1

39 61 SAI PWSCC HTS PLUG I

40 33 SAI ODSCC HTS PLUG 1

40 58 SCI PWSCC HTS CIRC PLUG 1

41 32 SAI ODSCC HTS PLUG 1

1

)

Steam Generator 15 Day Plugging Report Sequoyah Unit 1 Cycle 8 SG ROW COL INDICATION CHARACTERIZATION RESOLUTION 1

42 42 SCI PWSCC HTS CIRC PLUG / STABILIZE 1

44 57 SAI PWSCCIITS PLUG 1

45 44 SCI PWSCC HTS CIRC PLUG / STABILIZE Total Number of Tubes Plugged This Generator 34 i

Sample: 0 2

1 69 SCI PWSCC U-BEND CIRC PLUG 2

3 34 SCI ODSCC TSP CIRC PLUG 2

4 32 SAI PWSCC TSP PLUG

]

2 6

10 SAI PWSCC <2V HC PLUG 2

11 12 SAI PWSCC <2V HC PLUG 2

11 37 SCI PWSCC HTS CIRC PLUG 2

12 25 SCI PWSCC HTS CIRC PLUG 2

16 22 NONE PREVENTIVE PLUG / STABILIZE 2

16 49 SCI PWSCC HTS CIRC PLUG 2

17 52 SCI PWSCC HTS CIRC PLUG 2

21 34 SCI PWSCC HTS CIRC PLUG 2

22 75 SAI PWSCC HTS PLUG 2

24 59 SAI PWSCC HTS PLUG 2

25 31 SCI PWSCC HTS CIRC PLUG 2

26 66 SCI PWSCC HTS CIRC PLUG / STABILIZE 2

  • 8 43 RRC PREVENTIVE PLUG 2

29 58 MCI PWSCC HTS CIRC PLUG 2

30 59 MCI PWSCC HTS CIRC PLUG 2

31 49 SCI PWSCC HTS CIRC PLUG 2

37 54 SAI PWSCC HTS PLUG 2

39 52 PLP POT. LOOSE PART PLUG 2

39 53 PLP POT. LOOSE PART PLUG Total Number of Tubes Plugged This Generator 22 2

Steam Generator 15 Day Plugging Report Sequoyah Unit 1 Cycle 8 SG ROW COL INDICATION CHARACTERIZATION RESOLUTION d

Sample: 0 3

1 36 SAI PWSCC U-BEND INSITU PLUG 3

1 61 SAI PWSCC <2V HC PLUG 3

1 87 SCI PWSCC U-BEND CIRC PLUG 3

2 52 SAI PWSCC TSP PLUG 3

2 59 SAI PWSCC TSP PLUG 3

2 64 SAI PWSCC TSP PLUG 3

2 88 SCI PWSCC TSP CIRC PLUG 3

3 10 SAI PWSCC <2V llc PLUG 3

3 48 SAI PWSCC HTS PLUG 3

3 92 SAI PWSCC TSP PLUG 3

3 94 SCI ODSCC TSP CIRC PLUG / STABILIZE 4

3 4

12 SAI PWSCC TSP PLUG 3

4 51 SAI ODSCC U-BEND PLUG 3

5 55 SAI PWSCC TSP PLUG 3

6 39 SAI PWSCC HTS PLUG 3

6 60 MCI PWSCC TSP CIRC PLUG 3

6 61 SAI PWSCC TSP PLUG 3

6 70 MAI PWSCC <2V HC PLUG 3

6 73 SAI PWSCC TSP PLUG 3

6 78 SAI PWSCC TSP PLUG 3

7 7

SAI PWSCC <2V HC PLUG 3

7 32 SAI PWSCC TSP PLUG 3

7 44 SAI PWSCC TSP PLUG 3

8 20 SCI PWSCC HTS CIRC PLUG 3

8 25 SAI PWSCC HTS PLUG 3

8 85 SAI PWSCC TSP PLUG 3

8 R8 SAI PWSCC TSP PLUG 3

9 15 SAI PWSCC TSP PLUG 3

9 18 SCI PWSCC HTS CIRC PLUG 3

9 29 SCI ODSCC TSP CIRC PLUG 3

9 45 SAI PWSCC TSP PLUG 3

Steam Generator 15 Day Plugging Report Sequoyah Unit 1 Cycle 8 SG ROW COL INDICATION CHARACTERIZATION RESOLUTION 3

9 46 SAI PWSCC TSP PLUG 3

9 66 SAI PWSCC TSP PLUG 3

9 78 SAI PWSCC TSP PLUG 3

9 91 SAI PWSCC <2V HC PLUG 3

10 3

SAI PWSCC <2V HC PLUG 3

10 47 SCI PWSCC TSP CIRC PLUG 3

10 50 SCI PWSCC TSP CIRC PLUG 3

10 79 SCI ODSCC TSP CIRC PLUG 3

10 84 SAI PWSCC TSP PLUG 3

10 86 SCI ODSCC TSP CIRC PLUG 3

11 59 SCI PWSCC TSP CIRC PLUG / STABILIZE 3

11 70 SAI PWSCC TSP PLUG 3

11 90 SAI PWSCC <2V HC PLUG 3

12 6

SAI PWSCC <2V IIC PLUG 3

12 57 SCI PWSCC TSP CIRC PLUG 3

12 60 SAI FWSCC TSP PLUG 3

12 85 SAI PWSCC TSP PLUG 3

13 84 SAI PWSCC TSP PLUG 3

14 65 SAI PWSCC TSP PLUG 3

14 73 SAI PWSCC TSP INSITU-PLUG 3

14 74 SAI PWSCC <2V HC PLUG 3

14 81 SAI PWSCC TSP PLUG 3

14 85 SCI PWSCC TSP CIRC PLUG 3

15 3

SAI PWSCC <2V HC PLUG 3

15 12 SAI PWSCC <2V HC PLUG 3

15 55 SAI PWSCC TSP PLUG 3

15 77 SAI PWSCC TSP PLUG 3

15 92 SAI PWSCC TSP PLUG 3

16 62 SAI PWSCC TSP PLUG 3

16 67 SCI PWSCC HTS CIRC INSITU-PLUG 3

16 83 SCI PWSCC TSP CIRC INSITU-PLUG 3

16 85 SA!

PWSCC TSP PLUG 4

.w Steam Generator 15 Day Plugging Report Sequoyah Unit 1 Cycle 8 SC ROW COL INDICATION CIIARACTERIZATION RESOLUTION 3

17 14 SAI PWSCC TSP PLUG 3

17 21 SAI PWSCCIITS PLUG 3

17 52 SCI PWSCC HTS CIRC PLUG 3

18 67 SAI PWSCC TSP PLUG 3

19 32 SAI PWSCC TSP PLUG 3

19 59 SAI ODSCC TSP PLUG (EXTRA) i-3 19 87 SAI PWSCC <2V HC PLUG 3

20 36 SAI PWSCC <2V HC PLUG 3

20 75 SCI PWSCC TSP CIRC PLUG 3

21 40 SCI PWSCC TSP CIRC PLU(1 3

21 47 MAI PWSCC <2V HC PLUG 3

22 36 SAI PWSCC TSP PLUG 3

23 67 SAI PWSCC TSP PLUG 3

23 81 SAI PWSCC TSP PLUG 4

3 24 60 SAI PWSCC TSP PLUG 3

24 70 SCI PWSCC HTS CIRC PLUG / STABILIZE 3

24 86 SAI PWSCC TSP PLUG 3

25 85 SAI PWSCC <2V HC PLUG 3

26 72 SAI PWSCC TSP PLUG 3

26 79 SAI PWSCC TSP PLUG 3

27 71 SAI PWSCC TSP PLUG 3

27 78 SAI PWSCC TSP PLUG 3

29 74 SCI ODSCC TSP CIRC PLUG 3

30 71 SAI PWSCC TSP INSITU-PLUG 3

31 67 SAI PWSCC TSP PLUG 3

31 70 SAI PWSCC TSP PLUG 3

31 78 MAI PWSCC <2V HC PLUG 3

32 63 MAI PWSCC TSP PLUG 3

32 65 SCI PWSCC TSP CIRC PLUG 3

32 76 SAI PWSCC <2V HC PLUG 3

35 60 SAI PWSCC TSP PLUG 3

36 74 SAI PWSCC TSP PLUG 5

Steam Generator 15 Day Plugging Report Eequoyah Unit 1 Cycle 8 SG ROW COL INDICATION CIIARACTERIZATION RESOLUTION j

3 44 43 SCI PWSCC TSP CIRL PLUG 3

44 44 SAI PWSCC TSP PLUG 3

44 56 SCI ODSCC TSP CIRC PLUG Total Number of Tubes Plugged This Generator 98 Sample: 0 4

1 21 SAI PWSCC TSP INSITU-PLUG 4

1 23 SAI PWSCC TSP PLUG 4

1 35 SCI ODSCC TSP CIRC PLUG 4

1 46 SAI PWSCC TSP PLUG 4

1 84 SAI PWSCC U-BEND INSITU-PLUG 4

2 7

SCI ODSCC TSP CIRC PLUG 4

2 28 SAI PWSCC TSP PLUG 4

2 55 SCI PWSCC TSP CIRC PLUG 4

3 9

SCI ODSCC TSP CIRC PLUG 4

3 18 SCI ODSCC TSP CIRC PLUG 4

3 25 SCI PWSCC TSP CIRC PLUG 4

3 36 SCI ODSCC TSP CIRC PLUG 4

3 37 SCI ODSCC TSP CIRC PLUG 4

3 39 SCI PWSCC TSP CIRC PLUG 4

3 45 GAI PWSCC TSP INSITU-PLUG 4

3 49 SAI PWSCC TSP PLUG 4

3 83 SAI PWSCC TSP PLUG 4

3 84 SAI PWSCC TSP PLUG 4

4 25 SAI PWSCC <2V HC PLUG 4

4 29 SAI PWSCC TSP PLUG 4

4 43 SCI PWSCC TSP CIRC PLUG 4

4 45 SCI ODSCC TSP CIRC PLUG 4

5 15 SCI ODSCC TSP CIRC PLUG 4

5 21 MCI ODSCC TSP CIRC PLUG 4

5 39 SAI PWSCC TSP PLUG 6

Steam Generator 15 Day Plugging Report Sequoyah Unit 1 Cycle 8 SG ROW COL INDICATION CHARACTERIZATION RESOLUTION 4

5 40 SAI PWSCC TSP PLUG 4

6 25 SAI PWSCC TSP PLUG 4

6 31 SCI PWSCC TSP CIRC INSITU PLUG / STABILIZE 4

6 57 SAI PWSCC TSP PLUG 4

6 61 SAI PWSCC HTS PLUG 4

7 4

SAI PWSCC <2V HC PLUG 4

7 11 SCI ODSCC TSP CIRC PLUG 4

7 34 SCI ODSCC TSP CIRC PLUG 4

7 60 sal PWSCC TSP PLUG 4

8 20 SCI ODSCC TSP CIRC PLUG 4

8 29 SCI ODSCC TSP CIRC PLUG 4

8 39 SAI PWSCC <2V HC PLUG 4

8 40 SCI ODSCC TSP CIRC PLUG 4

9 27 MAI PWSCC TSP PLUG 4

9 36 SCI PWSCC TSP CIRC PLUG 4

9 47 SAI PWSCC TSP PLUG 4

9 54 SAI PWSCC TSP PLUG 4

9 77 SAI PWSCC <2V HC PLUG 4

10 32 SAI PWSCC TSP PLUG 4

11 36 SCI PWSCC TSP CIRC PLUG 4

11 41 SAI PWSCC TSP PLUG 4

11 86 SAI PWSCC TSP PLUG 4

11 89 SCI PWSCC TSP CIRC PLUG 4

12 27 SCI PWSCC HTS CIRC INSITU-PLUG 4

12 32 SCI PWSCC HTS CIRC PLUG 4

12 38 SAI PWSCC TSP PLUG 4

12 43 SAI PWSCC TSP PLUG 4

12 48 SAI PWSCC TSP PLUG 4

13 29 SCI PWSCCllTS CIRC PLUG 4

13 35 SCI PWSCC TSP CIRC PLUG 4

13 36 SCI ODSCC TSP CIRC PLUG 4

13 49 SCI PWSCC HTS CIRC PLUG 7

Steam Generator 15 Day Plugging Report Sequoyah Unit 1 Cycle 8 SG ROW COL INDICATION CHARACTERIZATION RESOLUTION 4

13 91 SAI PWSCC TSP PLUG 4

14 28 SAI PWSCC TSP PLUG 4

14 29 SAI PWSCC <2V HC INSITU-PLUG 4

14 40 SCI PWSCCIITS CIRC PLUG 4

14 50 SAI PWSCC TSP PLUG 4

14 63 SAI PWSCC TSP INSITU-PLUG 4

16 33 SCI PWSCC HTS CIRC PLUG 4

16 53 SCI ODSCC TSP CIRC PLUG 4

17 44 SCI PWSCC TSP CIRC PLUG / STABILIZE 4

17 45 SAI PWSCC TSP PLUG 4

17 47 SAI PWSCC TSP PLUG 4

17 50 SAI PWSCC TSP PLUG 4

17 62 SCI PWSCC TSP CIRC PLUG 4

18 43 SAI PWSCC TSP PLUG 4

19 47 SCI PWSCC IITS CIRC PLUG 4

19 65 SCI PWSCC TSP CIRC PLUG 4

20 41 SAI PWSCC TSP PLUG 4

21 33 SCI PWSCC HTS CIRC PLUG 4

22 39 SCI ODSCC TSP CIRC PLUG 4

22 48 SCI ODSCC TSP CIRC PLUG 4

23 18 SCI ODSCC TSP CIRC PLUG 4

23 28 SAI PWSCC TSP PLUG 4

23 29 SAI PWSCC TSP PLUG 4

23 35 SAI PWSCC TSP PLUG 4

23 44 SAI PWSCC TSP PLUG 4

23 53 SCI ODSCC TSP CIRC PLUG 4

24 12 MAI PWSCC TSP PLUG 4

24 30 SAI PWSCC TSP PLUG 4

25 13 SAI PWSCC <2V HC PLUG 4

25 20 SAI PWSCC TSP PLUG 4

25 31 SAI PWSCC TSP PLUG 4

25 32 SAI PWSCC TSP PLUG 8

o s-Steam Generator 15 Day Plugging Report Sequoyah Unit 1 Cycle 8 SG ROW COL INDICATION CHARACTERIZATION RESOLUTION 4

26 11 SAI PWSCC TSP PLUG 4

26 15 SCI PWSCC TSP CIRC PLUG 4

26 24 SCI PWSCC TSP CIRC PLUG 4

27 17 SAI PWSCC TSP PLUG 4

27 18 SAI PWSCC TSP PLUG 4

27 25 SCI PWSCC TSP CIRC PLUG 4

27 41 SAI PWSCC TSP PLUG 4

28 30 SAI PWSCC HTS PLUG 4

29 16 SAI PWSCC TSP PLUG 4

29 30 SAI PWSCC TSP PLUG 4

30 18 SAI PWSCC <2V HC PLUG 4

30 30 SAI PWSCC TSP PLUG 4

31 17 SAI PWSCC TSP PLUG 4

33 21 SAI PWSCC TSP INSITU-PLUG 4

34 24 SAI PWSCC TSP PLUG 4

35 26 SAI PWSCC TSP PLUG 4

35 27 SAI PWSCC TSP PLUG 4

35 34 SCI PWSCC TSP CIRC PLUG 4

35 48 SAI PWSCC TSP PLUG 4

35 78 SAI PWSCC HTS PLUG 4

36 25 SAI PWSCC TSP PLUG 4

36 26 SAI PWSCC TSP PLUG 4

36 35 SAI PWSCC <2V HC PLUG 4

36 42 SAI PWSCC <2V HC INSITU-PLUG 4

36 45 SCI PWSCC TSP CIRC PLUG 4

36 48 SAI PWSCC TSP PLUG 4

37 28 SAI PWSCC <2V HC INSITU-PLUG l

4 37 38 SCI PWSCC TSP CIRC PLUG 4

37 39 SAI PWSCC TSP PLUG 4

37 44 SAI PWSCC TSP PLUG 1

4 38 23 SAI PWSCC TSP PLUG 4

38 28 SAI ODSCC TSP PLUG i

i

W J

Steam Generator 15 Day Plugging Report Sequoyah Unit 1 Cycle 8 SG ROW COL INDICATION CHARACTERIZATION RESOLUTION 4

38 33 SAI PWSCC TSP PLUG 4

38 43 SCI PWSCC TSP CIRC PLUG 4

38 53 SAI PWSCC TSP PLUG 4

38 54 40 AVB WEAR PLUG 4

39 56 SAI PWSCC TSP PLUG Total Number of Tubes j

Plugged This Generator 126 j

m i

t 1

J l

10