ML20147J393

From kanterella
Jump to navigation Jump to search
Forwards LER 97-019-00,describing Past Occurrences of Operating During Refueling Shutdowns W/Rhr Sys Potentially Bypassing Core in Violation of TS 15.3.1.A.3
Date released: 06/09/2020 Download: ML20147J393


:on 970404,RHR Not Aligned IAW TS Requirements. Caused by non-conservative Decision Making & Not Recognizing When TS Were Not Controlling Plant Operations.Pbnp Mgt Philosophy Re TS Interpretations Changed to Minimize Use
ML20147J395
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/02/1997
From: Weaver D
WISCONSIN ELECTRIC POWER CO.
To:
References
Download: ML20147J395 (4)
Forwards LER 97-019-00,describing Past Occurrences of Operating During Refueling Shutdowns W/Rhr Sys Potentially Bypassing Core in Violation of TS 15.3.1.A.3
ML20147J389
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/02/1997
From: Dante Johnson
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20147J389 (1)