ML20147J333

From kanterella
Jump to navigation Jump to search
Forwards Amend 47 to Appl for Extension of GESSAR-238 Nuc Island to Comply with Reg Guide 1.9
ML20147J333
Person / Time
Site: 05000447
Issue date: 12/21/1978
From: Sherwood G
GENERAL ELECTRIC CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20147J337 List:
References
NUDOCS 7812280099
Download: ML20147J333 (1)


Text

1

  • i G E N E R A L (h E LE CTRICNUCLEAR ENERGY PROJECTS DIVISION GENERAL ELECTRIC COMPANY,175 CURTNER AVE., SAN JOSE, CALIFORNIA 9s125 MC 682, (408) 925-5040 MFN 449-78 December 21, 1978 U. S. Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C. 20555 Attention: H. R. Denton, Director Gentlemen: I

SUBJECT:

IN THE MATTER OF EXTENSION OF PRELIMINARY DESIGN APPROVAL FOR THE GENERAL ELECTRIC STANDARD SAFETY ANALYSIS REPORT (GESSAR), DOCKET NO. STN 50-447.

Reference:

(1) Letter, to H. R. Denton from Glenn G. Sherwood, November 30, 1978, same subject This letter supplements the documentation forwarded to you for the PDA extension matters (reference 1) and provides assessments to specific items that were inadvertently evaluated to the wrong revision number, i It is our understanding that this addition will complete the PDA Extension Review Matters and qualify for the extension of the GESSAR PDA's.

Sincerely, j 1

/l }

H/ /\ N Glenn G. Sherwood, Manager Safety and Licensing Operation GGS:csc/29N l l

Enclosures 7812280DYt

  • '?f o b Cb . --_ .