Mt:o UNITED STATES y

u j

NUCLEAR REGULATORY COMMISSION t

t WASHINGTON, D.C. 20665-4001

...../

Wesley C. Patrick. President DIAR 2 5199/

Center for Nuclear Waste Regulatory Analyses

- 6220 Culebra Road P0 Drawer 28510 San Antonio, TX 78228 0510

Dear Mr. Patrick:

Subject:

Task Order No. 16(G) Entitled. " Seismic Reviews for Title II Sites." Under Contract NRC 02 96 004 In accordance with the task order procedures of the subject contract, this letter definitizes Task Order No.16(G). This effort shall be performed in accordance with the enclosed Statement of Work and tha Contractor's technical proposal dated November 12. 1996, and revised on January 30,1997 and March

14. 1997, which are hereby incorporated by reference and made a part of this task order. The effective date of this task order shall be Marc 131,1997.

Task Order No.16(G) shall be in effect from March 31, 1997 through September 26, 1997 with a cost ceiling of $26.219. The amount of $

represents the total estimated reimbursable costs, the amount of $'

represents the cost of facility capital, and the amount of $

represents the fixed fee for this task order.

The amount currently obligated is $26.219.

The obligated amount shall, at no time, exceed the task order ceiling. When and if the amount (s) paid and payable to the Contractor hereunder shall equal the obligated amount, the Contractor shall not be obligated to continue performance of the work unless and until the Contracting Officer shall increase the amount obligated with respect to this task order. Any work undertaken by the Contractor in excess of the obligated amount specified above is done so at the Contractor's sole risk.

Accounting Data for Task Order No. 16(G) is as follows:

B&R No.:

75015233000 i)

Job Code:

J5147 BOC:

252A Appn. No.:

31X0200 Obligated:

$26.219 Q y' 110002 Q1g 1ME5555555,5E

~'

9704110019 970403 7

i PDR CONTR NRC-02-96-OO4 PDR g

6

-Task Order No. 16(G)

Page 2 The following individuals are considered to be essential to the successful performance of the work hereunder: Dr. Asadul Chowdhury, Dr. Sui-Min Hsit.,,

and Dr. Pat LaPlante.

The Contractor agrees that such personnel shall not be removed from the effort under the task order without compliance with Contract Clause H.1 Key Personnel. Further, any consultants that the Contractor plans to utiliza under this task order must be appr..ved by the NRC Contracting Officer before that consultant may begin work unt. r this task order.

Your contacts during the course of this task order are:

Technical Matters:

Deborah DeMarco Project Officer (301) 415-7796 Contractual Matters:

Deborah Neff Contract Specialist (301) 415 8160 The issuance of Task Order No. 16(G) does not change any terms and conditions of the subject contract.

Please indicate your acceptance of Task Order No.16(G) by having an official authorized to bind your organization, execute three (3) copies of this document in.the space provided and return two (2) co)ies to the U.S. Nuclear Regulatory Commission, Attn: Ms. Deborah Neff, ADHDC/ TAB 1, Hail Stop T-712, Washington, DC 20555.

You should retain the third copy for your records.

If you have any questions regarding this matter, please contact Ms. Neff on (301) 415 8160.

Sincerely, 4

Mary. M' e. Contracti g Officer Tech icp Acquisition ranch No. 1 Division of Contracts Office of Administration

Enclosure:

As stated ACCEPTED:

NalT4 Robert E. chatten Director, Contracts April 3, 1997 Date

r.

i TASK ORDER'NO. 16(G) TITLE:

SEISMIC REVIEWS FOR-TITLE II SITES JOB CODE J5147 NRC ISSUING OFFICE NMSS

- NRC PROJECT MANAGER DEBORAH DEMARCO. 415-7796 NRC TECHNICAL MONITOR DANIEL ROM, 415-6704 DOCKET NUMBER VARIOUS TAC NUMBER L50072 FEE RECOVERABLE NO 1.0 Backaround Uranium Mill sites under license after November 8, 1978, are regulated under Title II of the Uranium Mill Tailings Radiation Control Act (UNTRCA), which amended the Atomic Energy Act. The reclamation (closure) plans for these sites should meet the requirements of 10 CFR 40 Appendix A which are, in part, that reclamation of Uranius mill tailings sites be conducted in accordance with a plan which provides reasonable assurance of long-term stability and Reclamation plans should provide does not rely on active maintenance.

stabilized embankments that maintain control of tailings under the effects of scismic forces which could reasonably be expected to occur.

Given recently

)

updated site-specific Peak Ground ar.celerations (PGA) for the Rio Algom Lisbon, Bear Creek, L-Sar, @i & % <rM UNC Church Rock sites, the stability

)

of tailings embankmants at those sites needs to be confirmed.

2.0 Ob.fectivo

)

l The ob.jective is to confirm the stability of the tailings embankments under updated seismic loading.

The contractor shall determine if enough information With has been provided by the licensee, and if not, request what is needed.

adequate information, the contractor shall do a detailed evaluation to datermine the stability of the tailings embankments.

The contractor shall pr vide a written final evaluation.

l 3.0 Technical Qualifications Recuired The contractor shall provide the services of a geotechnical engineer who has l

the capability to evaluate PGA affects on the uranium mill tailings embankment.

Familiarity with the NRC Standard Review Plan is required.

i 4.0 Level of Effort 2

The estimated effort for each of the five revie,. in th13 hou~ '

the geotechnical engineering staff.

This does not include time spent waiting for licensee responses or NRC and management reviews.

The total estimated i

level of effort for this review is approximately 161 hours0.00186 days <br />0.0447 hours <br />2.662037e-4 weeks <br />6.12605e-5 months <br />.

4 5.0 Period of Performance This task order will cow ence on March dl. 1997 and will expire on September 26.-1997.

4

6.0 $G9De of Work The contractor shall use the Final Standard Review Plan for the Review of Remedial Action of Inactive Mill Tailings Sites Under Title I of UMTRCA (June 1993), and other current design guidance in addition to discussions with NRC staff, to:

1.

Review and secome familiar with NRC's procedures for evaluating PGA and slope stability.

2.

Evaluate the licensee's submittal, including, as necessary:

a.

revised configuration (if any) b.

previously-approved reclamation plan relevant geotechnical data and construction specifications c.

3.

Prepare a draft report for the embankment stability verification (similar to a model report to be provided by NRC staff) presenting the contractor's findings for the design, includ'ng whether or not i

the design meets the standard, needs to be justified or redesigned, or needs supporting data (specify which data).

4.

Finalize the report following NRC's review.

The report should be provided as a hard copy and in diskette form compatible with the Wordperfect 5.1 processing system.

7.0 Heetino and Travel It is estimateJ that one, I day meeting for 1 person will be held at NRC's offices in Rockville, Maryland (if required), as directed by the NRC TM.

8.0 NBC-Furnished Materials Final Standard Review Plan for the Review of Remedial Action of Inactive Mill Tailings Sites Under Title I of UMTRCA, Revision 1 June 1993 Embankment stability section of a Technical Evaluation Report (Title II)

Erbankment stability evaluation of a Title II Reclamation Plan i

I 2

e

_______________.___j

.. w 9.0 Schedul_e The following schedule of the staf ' time required is based on estimates of time intervals to accomplish each phase of this task.

The time required to obtain responses from the licensee or management approval of various phases is estimated under the responso column.

C41endar Time To Accomplish Each of the Five Seismic Reviews Review the material and prepare a report with conclusions of acceptance or requests for information as required:

Site Due Date Rio Algom Due 4 weeks from effective date of task order Bear Creek Church Rock Quivira

~

Homestake Final report:

Site Due Date Rio Algom Due 8 weeks from effective date of task order Bear Creek Church Rock Quivira Homestake

)

i 10.0 Technical Direction Daniol Rom is the designated Technical ".anitor for this task.

Technical instructions may be issued from time to time during the duration of this task.

Tcchnical instructions shall not constitute new assignments of work or changes of such nature as to justify an adjustment in cost or period of performance.

Directions for changes in the scope of work, cost, or period of performance must be coordinated through the NMSS Project Officer and approved by the NRC Ccntracting Officer.

l 3