Text
'
y/ sung %-
UNITED STATES :
1 g-y NUCLEAR REGULATORY COMMISSION 2
WASHINGTON, D.C. 30eeH001
%g*****[
l April 7,1997 Mr. Neil S. Carns
~ Senior-Vice President and Chief Nuclear Officer i
Northeast Nuclear Energy. company c/o Mr. Richard T. Laudenat
' Director - Regulatory Affairs P.O.. Box 128 Waterford, CT 06385
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE MILLSTONE NUCLEAR POWER STATION, UNITS 1, 2, AND 3
Dear Mr. Carns:
By letter dated March 14, 1997, Northeast Nuclear Energy Company (NNECD) submitted a summary of its review of selected attributes of the Licensed Operator Initial Training (LOIT) and Licensed Operator Upgrade Training (LOUT) programs (matrices) and the process instruction " Nuclear Training LOIT/ LOUT Audit Review." NNECO identified the matrices and instruction document as containing personnel information, the disclosure of which would constitute an
+
unwarranted invasion of personal
)rivacy. Accordingly, NNECO requested that the personnel information be wittneld from public disclosure pursuant to 10 CFR 2.790(a)(6) as supported in its affidavit dated March 14, 1997.
NNECO also submitted letter dated March 31, 1997, in response to the NRC's Confirmatory Action Letter (1-97-010) dated March 7, 1997, confirming commitments by NNECO that it would ensure that weaknesses in the LOIT and LOUT pro 5 rams be corrected. NNECO's March 31 letter responded to those commitments.
The final results of the review and revised process instructions i
contain personnel information which would constitute an unwarranted invasion of personal privacy. Accordingly, NNECO requested that the personnel information be withheld from public disclosure pursuant to 10 CFR 2.790(a)(6) l as supported in its affidavit dated March 31, 1997.
l By both letters, March 14 and 31, 1997, NNECO submitted redacted versions for placement in the NRC's public document room.
We have reviewed NNECO'S requests based on the requirements and criteria of 10 CFR 2.790, and have determined that the submitted information sought to be [(
identified by NNEC0 will be withheld from public disclosure pursuant withheld contains privacy information. Therefore, the privacy information so 2.790(a)(6) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of
/
persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
I
.c 9704100097 970407 ADOCK0500g5 DP.
4 Neil S.-Carns' '
. April 7,1997 -
)
If the basis fce: withholding this information from public inspection should.
I change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.
You airo should understand that thelNRC may have cause to review this determination in the
' future, for example, if the scope of a, Freedom of Information Act raquest includes your information.
In'all review situations, if the NRC ma ses a determination adverse to the above, you will be notified in advance of any I
public disclosure.
~
Sincerely, Original signed by:
' ~ Phillip F. f McKee i
Deputy Director for. Licensing Special-Projects Office Office of Nuclear Reactor Regulation Docket Nos.
50-245, 50-336, and S0-443
- cc:
See next page DISTRIBUTION:
l OechetEFile?
p
_PUBLIC ^ ~ ~
"3
. SPD-L Plant WTravers PMcKee LBerry JAndersen SDembek DMcDonald MPSiemien, 0GC and (e-mail MPS)
JDurr,' RI
. (,f)l u, KI i
I DOCUMENT NAME: G':\\MCKEE\\MS123. WIT l
To escelve e copy of this documeset, hedosto les the boat *C* = Copy without ettschment/ enclosure
- E* = Copy with ettschmenyonclosure *N* = No copy,
L OFFICE SPO-L:PM
,l SPO-L:PM l<
SP0-L:PM l
SPO-L:LA W1 C/ SPO-gg7/ l NAME-JAndersen el SDembek /4thA DHcDonald cthh LBerry W PMcKe'e DATE 04/'1/97
'V 04/'/ /97 04/01/97 V
04/t//97' 7 04/q/97
~
-yg y.
l OFFICIAL RECORD COPY I
hp(Spl~r'l)
+ ff'J "#
4{1.J/L p
- dG.
I l
e g.
4 Neil S. Carns If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.
You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, Phillip
. McKee Deputy Director for Licensing Special Projects Office Office of Nuclear Reactor Regulation Docket Nos.
50-245, 50-336, and 50-443 cc:
See next page l
i I
i l
5 '
Northeast Nui: lear Energy Company Millstone Nuclear Power Station Units 1, 2, and 3 cc:
Lillian M. Cuoco, Esquire Mr.' Wayne D. Lanning Senior Nuclear Counsel-Deputy Director of Inspections Northeast Utilities Service Company Special Projects Office P. O. Box 270 475 Allendale Road Hartford, CT 06141-0270 King of Prussia, PA 19406-1415 Mr. Kevin T. A. McCarthy, Director Mr. F. C. Rothen Monitoring'and Radiation Division Vice President - Nuclear Work Services Department of Environmental Northeast Nuclear Energy Company Protection P.O. Box 128 79 Elm Street Waterford, CT 06385 Hartford, CT 06106-5127 Charles Brinkman, Manager Mr. Allan Johanson, Assistant Washington Nuclear Operations Director ABB Combustion Engineering Office of Policy and Management 12300 Twinbrook Pkwy, hite 330 Policy Development and Planning Rockville, MD 20852 Division 450 Capitol Avenue - MS 52ERN Mr. D. M. Goebel i
P. O. Box 341441 Vice President - Nuclear Oversight Hartford,.CT 06134-1441 Northeast Nuclear Energy Company P. O. Box 128 i
Regional Administrator, Region I Waterford, CT 06385 U.S. Nuclear Regulatory Commission 4
475 Allendale Road Mr. M. L. Bowling, Jr.
King of Prussia, PA 19406 Millstone Unit No. 2 Nuclear Recovery Officer First Selectmen Northeast Nuclear Energy Company l
Town of Waterford P. O. Box 128 Hall of Records Waterford, CT 06385 200 Boston Post Road Waterford, CT 06385 Senior Resident Inspector Millstone Nuclear Power Station Mr. J. P. McElwain c/o U.S. Nuclear Regulatory Commission-l Millstone Unit No. I Nuclear P. O. Box 513 Recovery Officer Niantic, CT 06357 Northeast Nuclear Energy Company P. O. Box 128 Mr. J. K. Thayer Waterford, CT 06385 Recovery Officer - Nuclear Engineering and Support Deborah Katz, President Northeast Nuclear Energy Company Citizens Awareness Network P. O. Box 128 P. O. Box 83 Waterfod, CT 06385 Sh'lburne Falls, MA 03170 e
4
I-
. 5 Northeast Nuclear Energy Company Millstone Nuclear Power Station Units 1, 2, and 3
.cc:-
Mr. M. H. Brothers Vice President - Millstone Unit 3 Northeast Nuclear Energy Company P. 0. Box 128 Waterford, CT 06385 Burlington Electric Department c/o Robert E. Fletcher, Esq.
271 South Union Street Burlington, VT 05402 Mr. M. R. Scully, Executive Director' Connecticut Municipal Electric Energy Cooperative 30 Stott Avenue Norwich, CT 06360 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P. O. Box 426 Ludlow, MA 01056 Ernest C. Hadley, Esq.
1040 B Main Street P. O. Box 549 West Wareham, MA 02576 Joseph R. Egan, Esq.
Egan & Associates, P.C.
L 2300 N Street, NW i
Washington D.C. 20037 i
Citizens Regulatory Commission ATTN: Ms. Susan Perry Luxton 180 Great Neck Road Waterford, Connecticut 06385 t
1
[
'n.
-l u-