Ack Receipt of Informing NRC of Steps Taken to Correct Deviations Noted in Inspec Rept 99900326/78-01. Requests Addl Info Detailing Corrective Measures
ML20147H989
Person / Time
Issue date: 08/21/1978
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Obrien D
D.G. O'BRIEN, INC.
Shared Package
ML20147H953 List:
References
REF-QA-99900326 NUDOCS 7810270169
Download: ML20147H989 (2)


Text

.#" "%

UNITE D STATES

/

o NUCLEAR REGULATORY COMMISSION g

o REGION IV E

011 RYAN PLAZA DRIVE, SUITE 1000

&[

AR LINGTON, TE X AS 76011 o,

%4 4...+

21 AUG 1978 Docket No. 99900326/78-01 D. G. O'Brien, Inc.

Attn:

Mr. D. G. O'Brien President & General Manager One Chase Park Seat, rook, NH 03874 Gentlemen:

Thank you for your letter of July 19, 1978 in response to our letter dated June 23, 1978.

As a result of our review, we find that addi-tional information is needed.

Specifically:

Notice of Deviation, Item A Provide a description of steps that have been or will be taken to correct non-distribution of Glass Scaling procedures to Quality Control.

Also, provide a description of steps that have been or will be taken to prevent recurrence.

Notice of Deviation, Item B Provide a description of steps that have been or will be taken to correct retention of obsolescent procedures in reference books along with a description of steps that have been or will be taken to prevent recurrence.

Notice of Deviation, Item I Provide' a description of steps that have been or will be taken to correct non-maintenance of employee owned gages under the calibration system.

Also, provide a description of steps that have been or will be taken to prevent recurrence.

Notice of Deviation, Item J Provide a description of steps that have been or will be taken to correct non-completion of Job Order Review forms.

q s \\c W 7p M

~

D. G. O' Brien, Inc.

2 flotice of Deviation, Item K Provide a description of steps that. have been or will be taken to correct non-insertion and review / acceptance f the Lot flumber on the Process Sheet.

Also, provide a descrip. son of steps that have been or will be taken to prevent recurrence.

Please provide this additional information within twenty (20) days in order that we may complete our review in a timely manner.

Sincerely, 1

i 6L GLgv2 Uldis Potapovs, Chiaf Vendor Inspection Branch O