ML20147H525

From kanterella
Jump to navigation Jump to search
Forwards LER 78-078/03L-0
Date released: 06/09/2020 Download: ML20147H525


/03L-0 on 781207:during Normal Oper & Performance of Procedure HNP-2-3307,HPCI Steam Line Flow Ft&C Switch 2E41-N004 Was at -217 in Water,Due to Instru Drift
ML20147H527
Person / Time
Site: Hatch 
Issue date: 12/20/1978
From: Nix R
GEORGIA POWER CO.
To:
References
Download: ML20147H527 (1)
Forwards LER 78-078/03L-0
ML20147H520
Person / Time
Site: Hatch 
Issue date: 12/20/1978
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20147H520 (1)