Discusses Evaluation of Design,Fabrication & Installation of Liner in Spent Fuel Canal of High Flux Beam Reactor at Brookhaven Natl Lab
ML20147H397
Person / Time
Issue date: 04/01/1997
From: Callan L
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Lash T
ENERGY, DEPT. OF
Shared Package
ML20147H402 List:
References
NUDOCS 9704030105
Download: ML20147H397 (6)


Text

v 1

L*

. / "'

UNITED STATES g

g j

NUCLEAR REGULATORY COMMISSION c

WASHINGTON, D.C. 20555-0001

%,g #

April 1, 1997 Dr. Terry R. Lash, Director Office of Nuclear Energy, Science and Technology Department of Energy Washington, D.C.

20585

SUBJECT:

EVALUATION OF THE DESIGN, FABRICATION, AND INSTALLATION OF A LINER IN THE SPENT FUEL CANAL (POOL) 0F THE HIGH FLUX BEAM REACTOR AT THE BROOKHAVEN NATIONAL LABORATORY

Dear Dr. Lash:

I am responding to the letter you sent me on March 11, 1997, seeking Nuclear Regulatory Commission (NRC) technical assistance on the requested evaluation.

The NRC staff met with the Department of Energy (DOE) and Brookhaven l

Associated Universities staff on March 19, 1997, to discuss this potential NRC effort. During the meeting, DOE staff presented a revised Scope of Work and a project schedule; both are enclosed.

The project schedule identifies three activities in which NRC involvement is specifically sought, and corresponds to Items 2, 3, and 5 of the revised Scope of Work.

Items 1, 4, and 6 of the Scope of Work will be conducted as needed to support the requested reviews.

With respect to Item 2, DOE and NRC agreed that upon receiving DOE's conceptual design report on April 7,1997, NRC will be prepared to discuss the report in a meeting to be held at NRC on April 14, 1997. We will proviae our comments orally by April 21, 1997, which will be followed up with written comments by April 28, 1997. We will review and comment on Items 3 and 5 in accordance with the schedules shown in the Scope of Work.

We estimate that the review effort will cost $150,000.

Please provide a

" Funds Out Interagency Agreement" for os to proceed with this review.

The NRC contact for this work is Mr. Theodore Michaels.

If you have any questions, feel free to contact me at (301) 415-1700 or Theodore Michaels at (301) 415-1102.

Sincerely,

/

030053 t.ocjephCaiian Execi,tive Director for Operations p

MShh l

Enclosures:

g 'j pd,,6cpgq p/u a3 1.

Scope of Work x

2.

Project Schedule 9704030105 970401 PDR ORG EUSDOE PDR q7_g }

.'.I RETURN TO REGULATORY CENT _RAL FILES

/

n A

7 i ;

I 3

Dr.TcrryR.Itash,'Disctsr April 1, 1997 l

Office of Nuclear Energy, Science and' Technology Department of Energy Washington,,D.C.

20585 l

SUBJECT:

EVALUATION OF'THE DESIGN, FABRICATION, AND INSTALLATION OF A LINER IN THE SPENT FUEL CANAL (P0OL) 0F THE HIGH FLUX BEAM REACTOR AT THE BROOKHAVEN NATIONAL LABORATORY

Dear Dr. Lash:

I am responding to the letter you sent me on March 11, 1997, seeking Nuclear Regulatory Commission (NRC) technical assistance on the requested evaluation.

The NRC staff met with the Department of Energy (DOE) and Brookhaven Associated Universities staff on March 19, 1997, to discuss this potential NRC effort. During the meeting, DOE staff presented a revised Scope of Work and a project schedule; both are enclosed. The project schedule identifies three activities in_which NRC involvement is specifically sought, and corresponds to Items 2, 3, and 5 of the revised Scope of Work.

Items 1, 4, and 6 of the Scope of Work will be conducted as needed to support the requested reviews.

With respect to Item 2, DOE and NRC agreed that upon receiving DOE's conceptual design report on April 7,1997, NRC will be prepared to discuss the report in a meeting to be held at NRC on April 14, 1997. We will provide our comments orally by April 21, 1997, which will be followed up with written comments by April 28, 1997. We will review and comment on Items 3 and 5 in accordance with the schedules shown in the Scope of Work.

We estimate that the review effort will cost $150,000. Please provide a

" Funds Out Interagency Agreement" for us to proceed with this review.

The NRC contact for this work is Mr. Theodore Michaels.

If you have any questions, feel free to contact me at (301) 415-1700 or Theodore Michaels at (301) 415-1102.

Origirt1/iigned by L.J. Callan L. Joseph Callan

~

Executive Director for Operations

Enclosures:

3 l.

Scope of Work 2.

Project Schedule.

~

DISTRIBUTION:

~

e Central File Ginea ino ! SBurns -

SWeiss BSweeney JDorfman PUBLIC'(w/ incoming)

,CPaperiello,

WTravers RRothman EDO #G970167' MMiller KBohrer (012G-18) JMa LCallan A

- -RScroggins

. TMichaels EHylton EJordan3<

r, Collins /FMiraglia PMilano PDND r/f HThompson.

AThadani OGC GHubbard PNorry

" RZimmerman OPA GBagchi JBlaha TMartin OCA ED0 r/f

  • EE PREVIOUS CONCURRENCE'-

TECH ED.*

DSSA*

ECGB*

)

D:PM:LA*

l l

0 chaels/EHylton--

RSanders.

GHubbard GBagchi i

J /Jf/97 3/21/97 3/20/97 3/21/97 3/21/97 E

PDND:D*

Fo-DRP r

SWeiss M5 Tharki1r ns Callan 3/21/97 3/M r 3 /25797 497-

// /97 0FFICIAL RECORD COPY,

DOCUMENT NAME:

G' Y\\ACTN_I MiGT970167

.a.o4 A',.e n 5.."+

+

b SCOPE OF WORK NUCLEAR REGULATORY COMMISSION TECHNICAL ASSISTANCE TO THE DEPARTMENT OF ENERGY REGARDING THE DESIGN, FABRICATION, AND INSTALLATION OF A LINER FOR THE HIGH FLUX BEAM REACTOR SPENT FUEL CANAL (POOL)

1. Meet with DOE /BNL personnel at the High Flux Beam Reactor. Review scope ofwork, tour facility, become familiar with current issues. Conduct initial meeting in March 1997. Conduct similar meetings in the fhture, as necessary.
2. Review and comment on the Liner and Leakage Detection System C= ;=8 Desip Report. Initiate review coincident with issuance of Draft C72_' Desip Report by BNL's consultant (Raytheon Engineers & Constructors) Anril 4 1997. Complete review and issue Safety Evaluation Report by May 16.

M (NR(* c.----

.:i on the (%- :- : d Deslan Renner wsuldde duo no lar** rh== Anvil 2B 1997 Thir

. will niinw Ravrhen the neriodkom Anril 2R to Mav 16 to - '!-w all;e.-:

- and k= the I

AnalMddocument )

3. Review and comment on the Liner and Leakage Detection System Final Desip Report. laitiate review coincident with the issuance of the draft Final Desip Report by Raytheon (August 15,1997). Complete review and issue Safety Evaluation Report by November 1,1997. (This w. r ds to two weeks after the issuance of the Final Desip Report by Raytheon.).
4. Perform on-site inspections and===mente, as necessary, durmg installation of the canal liner and leakage detection system. Installation is being' scheduled for November 1,1997 thmugh March 1,1998.
5. Review and comment on Liner and Leakage Detectiou System Turnover to Operations Report

+

(completed or closed-out modification package). Initiate review by March 1,1998. Complete review and issue Safety Evaluation Report by March 15,1998.

6. Provide additional assistance as mumally agreed upon, and as reflected in a revision to this Scope of Work.

Date: March 6,1997 Revision: 3 (pmposed by BNL Reactor Division)

Note: Changes to the Scope of Work recommended by the BNL Reactor Division, in order to have NRC activities integrate with the schedule being developed for the Canal Liner and Leakage Detection System project, since the proposed Revision 2 are shown in under/Ineditalles.

NRCSCOP3. DOC 1

March 6.1997 ENCI.OSURE

PROJECT SCHEDULE YEAR 1997 1998 BEYOND

=

ACTIVITY MONTH F M A M J

J A

S O N D J

F M A M MAY 1996 f

wsS i.i.i.i uNER uOoincATiON

!4ll CONCEPTUAL DESIGN REPORT DRAFT

" ")

llllllllll Illi CONCEPTUAL DESIGN REVIEW & FINAL REPORT lflllllll lll PRELIMINARY ENGINEERING lI OllIIII IIll FINAL ENGINEERING

" e>

11llllllll Illi PROCUREMENT llllljjjjAl l

MODIFICATION PACKAGE PREPARATION & APPROVAL II!!!!!!^ll llll FABRICATION, CONSTRUCTION & TESTING n

lillllllll Illi i

MODIFICATION PACKAGE COMPLETION & CLOSEOUT lllllllllj j j ne3 llllllllll Illi

(*) - ACTIVITIES WHICH REQUIRE NRC INVOLVEMENT I

i ENCLOSURE

x

,s 3

s Dr. Terry R. Lash, Director

- ^'

Office cf Nuclear Energy, Sch nca and Technology Depar nt of Energy Washin

, D.C.

20585

SUBJECT:

LUATION OF THE DESIGN, FABRICATION,'AND INSTALLATION OF A LINER IN E SPENT FUEL CANAL (POOL) 0F THE HIGH FLUX BEAM REACTOR AT THE BROO VEN NATIONAL LABORATORY

Dear Dr. Lash:

I am responding to e letter you sent me on March 11, 1997, seeking Nuclear Regulatory Commission NRC) technical assistance on the requested evaluation.

The NRC staff met with e Department of Energy (DOE) and Brookhaven Associated Universities taff on March 19, 1997, to discuss this potential NRC s

effort. During the meeting DOE staff 3 resented a revised Scope of Work and a project schedule; both are e losed. Tie project schedule identifies three activities in which NRC invol ment is specifically sought, and corresponds to items 2, 3, and 5 of the revise Scope of Work. Assistance on items 4 and 6 of the Scope of Work will be prov ded as needed.

With respect to item 2, DOE and NRC igreed that upon receiving DOE's conceptual design report on April 7, lQ97, NRC will provide comments by April 21, 1997.

Because such a short t ma is allotted for the review, we anticipate that, for the most part, our mments will be delivered orally.

We will cite issues that should be consid ed in the final design report. We will also discuss these comments at a meet g to be held at NRC on April 14, l

1997.

We estimate that the review of this effort wil cost $150,000.

Please provide a " Funds Out Interagency Agreement" for us to pr ceed with this review.

The NRC contact for this work is Mr. Theodore Mich 1s.

If you have any-questions, feel free to contact me at (301) 415-170 or Theodore Michaels at (301) 415-1102.

Sincerely, L. Joseph Callan Executive Director for Operations

Enclosures:

1.

Scope of Work 2.

Project Schedule DISTRIBUTION:

Central File wincomina)

SBurns SWeiss

, BSwee y,

JDorfman PUBLIC (w/ incoming)

CPaperiello

' WTravers RRothm ED0 #G970167 MMiller, RI :

'KBohrer (012G-18)~JMa '

LCallan RScroggins

.TMichaels EHylton h/i5 coming)

EJordan Collins /FMiraglia PMil ano~

PDND r/f HThompson AThadani

' ' OGC GHubbard PNorry RZinnerman OPA GBagchi-i JBlaha TMartin

';0CA -

EDO r/f

  • SEE PREVIOUS C NCURRENCE

/

e ECM i [.

DSSA. d,ffGHubbar g Ga ND:PM:LA TECH ED.*

4

\\

Michaels/E on RSanders J /,10/97

.i/97 3/20/97

> fyj/97/ % a)Al/97 dh DRPM:Dde DONRR-

. EDO Weiss TMartin SCollins JCallan 3/T/97

/ /97

/ /97

/ /97 0FE CIAL RECORD COPY DOCUMENT NAME: G:\\SECY\\ACTN_ITM\\GT970167

SM f%e'd 3/3 '17

,Y ACTION w, n C7S S EDO Principal Correspondence Control

$ 7 0s,/

FROM:

DUE: 04/02/97 EDO CONTROL: G970167 DOC DT: 03/11/97 FINAL REPLY:

T;rry R. Lash DOE TO:

EDO FOR SIGNATURE OF :

EDO DESC:

ROUTING:

REQUESTING TECHNICAL ASSISTANCE TO DOE REGARDING Callan THE DESIGN, FABRICATION, AND INSTALLATION OF A Jordan i

LINER FOR THE HIGH FLUX BEAM REACTOR SPENT FUEL Thompson CANAL Norry Blaha Burns DATE: 03/12/97 Paperiello,NMSS Miller, RI ASSIGNED TO:

CONTACT:

Scroggins, CFO NRR Collins SPECIAL INSTRUCTIONS OR REMARKS:

ACT!0i1 NRR RECEIVED:

MARCH 13,1997 NRR ACTION:

DSSF :' 0U"'" DE g:3J DUE TO NRil D;i;ECTOR'S Oh,,,_

i~

BY b M

i M

A THADANI j

ZIMMERMAN j

MARTIN TRAVERS B0HRER