ML20147G409

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept CP-85-36 Re Installation of non-safety Related Conduit on non-safety Related Dead Weight Supports.Initially Reported on 871105.Evaluation on Corrective Actions Continues.Next Rept Expected by 880920
ML20147G409
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/01/1988
From: Counsil W, John Marshall
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-85-36, TXX-88283, NUDOCS 8803080221
Download: ML20147G409 (1)


Text

a MEE Log # TXX-88283 File # 10110

=

=

903.9 Ref. #'10CFR50.55(e)

TUELECTRIC

% illiam G. Coundl becsarve Vwe trenJmt U. S. Nutlear Regulatory Comission Attn:

Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHEPEAKSTEAMELECTRICSTATION(CPSES)

DOCKET NOS 50-445 AND 50-446 TRAIN "C" CONDUli SUPPORTS 50AR: CP-85-36 (INTERIM REPORT)

Gentlemen:

On November 5,1987, we notified you by our letter logged TXX-6928 of a deficiency involving)the installation of non-safety related conduit (two-inch diameter and smaller on non-safety related dead weight supports in Category I areas which we deemed reportable under the provisions of 10CFR50.55(e). Our last interim report was logged TXX-6970, dated November 24, 1987.

We are continuing our evaluation of the corrective actions for Unit 2 and will submit our next report no later than September 20, 1988.

Very truly yours, W. (n. Cou s c: (

W. G. Counsil i

By:

J. S. Marshall Supervisor, Docket Licensing DAR/grr 1

c - Mr. R. D. Hartin, Region IV Resident inspectors, CPSES (3)

~8803080221 880301 DR ADOCK 0500 5

a nron owe sures taaI twlas, rew H.Mi

-