ML20147F922
| ML20147F922 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 03/03/1988 |
| From: | Vissing G Office of Nuclear Reactor Regulation |
| To: | Hartzman M, Lipinski R, Marcus B, Rajan J, Tomlinson E NRC |
| References | |
| TAC-67118, TAC-67119, TAC-67120, TAC-67121, TAC-67122, NUDOCS 8803080071 | |
| Download: ML20147F922 (3) | |
Text
March 3,1988 l
Docket No. 50 - 460 NOTE TO: Distribution (See attached)
FROM:
Guy S. Vissing, Project Manager Standardization and Non-Power i
Reactor Project Directorate e
Division of Reactor Projects III, !Y, Y and Special Projects
SUBJECT:
ASSIGNMENT OF TAC NOS. TO WNP-1 ISSUES t
We recently have taen required to assign TAC Nos. to work assignments of f
Washington Nuclear Plant 1 (WNP-1). Also, I would like to update the status and schedule for these issues. The following table provides the issue, TAC 4
No., reviewer, current schedule for completion.
LICENSING ACTIONS WASHINGTON NUCLEAR PLANTS 1 (WNP-1)
DOCKET NO. 50-460 TAC NO.
DESCRIPTION REVIEWER TR SER 67122 REG. GUIDE 1.97 REVIEW B. Marcus 08/15/87T 67121 CABLE TRAY DAMPING R. Lipinski
?
67120 EMERGENCY DIESEL GEN.
E. Tomlinson 12/30/87T 67119 NON-MECHANISTIC FAILURES M. Hartzman 02/28/88T IN FMIN STEAM AND FW ISOLATION AREA 67118 DECOUPLING OF SEISMIC J. Rajan 03/30/88T AND PIPE BREAK EVENT Please review the above in your area of interest and provide your latest
[
expected schedule for completion.
Please contract me at 21101, Work Station 11-H-2.
ortninnt sinned Br I
Guy S. Vissing, Project Manager Standardization and Non-Power 8803080071 000303 Reactor Project Directorate PDR ADOCK 050 0
Divisien of Reactor Projects III, IV, i
{
A V and Special Projects I
Office of Nuclear Reactor Regulation DISTRIBUTION:
CN NRC & Local PDRs PDSNP GYissing LRubenstein EHylton PDSMPh PD PDS [:Is EKyMon
)
LRubenstein(03/2/88 GV 03/ 2./88 03/2/88
/
,,f fo UNITED STATES
+
g g
NUCLEAR REGULATORY COMMISSION l
WASHINGTON, D. C. 20555 t
March 3,1988 Docket No. 50 - 460 NOTE TO: Distributton (See attached)
FROM:
Guy S. Vissing, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects
SUBJECT:
ASSIGNMENT OF TAC NOS. TO WNP-1 ISSUES We recently have been required to assign TAC Nos. to work assignments of Washington Nuclear Plant 1 (WNP-1). Also, I would like to update the status and schedule for these issues. The following table provides the issue. TAC No., reviewer, current schedule for completion.
LICENSING ACTIONS WASHINGTON NUCLEAR PLANTS 1 (WNP-1)
DOCKET NO. 50-460 TAC NO.
DESCRIPTION REVIEWER TR SER 67122 REG. GUIDE 1.97 REVIEW B. Marcus 08/15/87T 67121 CABLE TRAY DAMPING R. Lipinski
?
67120 EMERGENCY DIESEL GEN.
E. Tomlinson 12/30/87T 67119 NON-MECHANISTIC FAILURES M. Hartzman 02/28/88T IN MAIN STEAM AND FW ISOLATION AREA 67118 DECOUPLING OF SEISMIC J. Rajan 03/30/88T t
AND PIPE BREAX EVENT I
Please review the above in your area of interest and provide your latest expected schedule for completion.
Please contract me at 21101, Werk Station 11-H-2.
c Guy S. VisttFg, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects Office of Nuclear Reactor Regulation i
4 DISTRIBUTION B. Marcus R. Lipinski E. Tomlinson M. Hartzman J. Rajan
.I I
t 4
l i
t
-