gg-NUCLEAR REGULATORY COMMISSION CONSENT CALENDAR ITEM SECY-78-496

,Sectember 8, 1978 For: The Comissioners From: Robert B. Minogue, Director, Office of Standards Development Thru: Executive Director for Operations 60[

Subject:

10 CFR PART 21 APPLICABILITY TO NONLICENSEE SUPPLIERS OF COMMERCIAL GRADE ITEMS Purcose: 1. Inform the Commission of current impact of 10 CFR Part 211 as applied to nonlicensee suppliers of " commercial grade items"2 and

2. Obtain Comission approval of a notice of effective rule-making that would impose limits on the applicability of 10 CFR Part 21 to nonlicensee suppliers of such "comercial grade items."

Category: This paper covers #a major policy question requiring Comission ,.

approval.

Issue: Whether Section 206 of the Energy Reorganization Act of 1974, as amended, is properly and appropriately applied to nonlicensee sup-pliers of "comercial grade items."

Decisien Criteria: 1. Impact of implementation of 10 CFR Part 21 on matters affect-ing health and safety.

2. Compliance with the statutory provisions of Section 206 of the Energy Reorganization Act of 1974.

I 10 CFR Part 21, " Reporting of Defects and Noncompliance," was approved by the Commis-sion at Policy Session 77-20, March 3,1977 (SECY-77-73), was published effective June 6,1977' at 42 FR 28891 and became fully effective January. 7,1978.

2 The term "comercial grade item" is fully defined in the attached rule. An abridged definition is that the item is not' uniquely applied to nuclear' facilities and it is described in manufacturers' product description literature. For example, a "ccmercial grade item" does not include an item that is uniquely applied to nuclear facilities, e.g., an ASME Section III Class 2. valve, but would include the bar stock '

material procured and used to fa h eate the valve stem of such a valve.-

Contact:

~

W. E. Campbell, Jr.

443-5913

'7P/01oid/QT

, t - , - __ _

l

, 'S t

The Commissioners 2~ -

1 1

b

(" Al ternative's: 1. Mintaih the effective 10 CFR Part 21 as it relates to non-l eensee suppliers of " commercial grade items."

l

2. Amend.10 CFA Part 21 to' remove from its scope the nonlicensee -l suppliers of " commercial grade items" for any facility or i activity that is. licensed or otherwise regulated by _NRC. l I

Discussion: Background material:is contained in Enclosure 1.

Neither Section 206 of the En'ergy Reorganization Act of 1974, as amended, nor the legislative history provides a definition of a " basic component"' supplied to~ a facility or activity licensed or' regulated by NRC. This definition was left' to rulemaking by NRC. Enclosure 2 contains the definition, as used in 10 CFR i Part 21, of " basic component" and some other pertinent terms used in 10 CFR Part 21. _i i

Almo::t every item that is specifically designed for nuclear use l is composed of some commercial grade items, e.g., a valve stem l machined from ASTM specification material or a sealed bearing, i Nuclear licensees, and their agents, i.e., architect-engineer (AE)

J nuclear steam systems supplier (NSSS), are having difficulty in applying 10 CFR Part 21 to these items-that can be described as

" standard stock," "off-the-shelf," or " commercial grade." These difficulties include significant prices increases and refusal by suppliers to either submit a bid or accept orders.

These commercial grade items are usually produced to a set of specifications drafted either by the manufacturer or the industry in anticipation of an order, with no specific end use or applica-tion in mind and without traceability to a specific item in the production lot, batch, or heat.

These items may go directly frem the manufacturer to an organiza-tion that knows the items will be used in a safety-related application or they may go through a series of organizations ,

before the_ items are. received by an organization that has knowl-edge of the intended 'use of the items.- Many responsible suppliers j

- are refusing even to quote on such commercial grade items if 10 CFR Part 21 is . invoked in the procurement document. Addi-

- tionally, other organizations are refusing orders because they are unable to procure material and parts from which their com-mercial items are manufactured when they in turn invoke the same

<1 -

w = w=v- = +,e -+ww' e ver er * * * " + r

  • w-, e -t-=-iF t e -tv -

1 p- *I a- -W'1'

. r ..

The Commissioners 3

< . 10 CFR Part 21 requirements on their suppliers. Many organiza- .

.' tions have refused orders invoking 10 CFR Part 21. (See Attach-ment B to Enclosure 1.) There are widespread reports that numerous organizations that are currently suppliers to nuclear facilities have refused or may refuse orders which invoke 10 CFR Part 21.

(See Attachment C to Enclosure 1.)

The staff has been monitoring the implementation of 10 CFR Part 21 by those subject to the rule. Of particular concern were the reports from those subject to the rule that (1) 10 CFR Part 21 was ambiguous in regard to basic components, (2) the implementation in regard to basic components was impractical and not effective, and (3) the implementation was causing, or about to cause,. increased procurement costs without any identifiable improvement of safety. (See Attachment B to Enclosure 1.)

The staff in drafting the current 10 CFR Part 21 realized that all items, organizations, activities, and products involved in the design, construction, or operation of a nuclear facility or

! activity were not such that they could create a substantial safety hazard. The staff intended that the purchaser would pass the requirements of 10 CFR Part 21 to levels in the procurement -

chain only where it was applicable, i.e., where the procured i item could cause a substantial safety hazard. It was specifically not the intent of the staff to require, by 10 CFR Part 21, addi-tional control of purchased material and equipment beyond that already required, e.g., the implementation of 10 CFR Part 50, Appendix B. However it appears that cautious application of 10 CFR Part 21, by those subject to it, is having an effect opposite to that the staff intended. A possible reason is that the risk of the allowed civil penalty ($5000 per day) is causing suppliers to pass the 10 CFR Part 21 down another level rather than make the decision that the item being procured could not cre:te a substantial safety hazard.

The staff has been unable to determine if the requirements of 10 CFR Part 21 have been solely responsible for increased prices.

Portions of the nuclear industry believe that the currently effective 10 CFR Part 21, as it relates to suppliers of commercial grade items, remains ambiguous, ineffective, costly and impractical. Subtier suppliers' refusal to accept procurement documents invoking 10 CFR Part 21 appears to be based on one or more of the follow-ing reasons: (1)-the relatively small volume of commercial grade items' produced that ultimately are used in nuclear applications does not justify the potential risk of civil penalty and the requirement to comply with other features of 10 CFR Part 21 such as preparing implementing procedures, (2) the supplier considers

Tae Comissioners 4 that parts, which must be obtained from subsuppliers, will be -

. difficult or impossible to obtain because of subsuppliers refus-ing to accept procurement orders that invoke 10 CFR Part 21, and (3) in the distribution of commercial grade items the manufacturer /

distributor can provide traceability of the items only for a very limited period of time, that is, identification of where all items of a specific production run are.

Some segments of the staff and industry believe that new sup- l pliers of commercial grade items will attempt to enter the nuclear l market place as some of the present suppliers may depart. These new st.ppliers will probably be able to ask for and receive a high l price - high enough to cover their 10 CFR Part 21 liability as I they perceive it - because the item is needed for continued I power generation capability. To assure that the item from a new supplier meets the necessary requirements and to upgrade the new supplier, it will be necessary for the purchaser to allocate I significant additional resources. Even with the additional l resources required, there will likely be less assurance that the I item will satisfactorily perform its function when compared to the item produced by the original supplier. Such a condition may J be adverse to health and safety. '

Alternative 2 has been developed based on the perceived understand-inp of the intent of Congress and proposes to resolve the issue of applicability of 10 CFR Part 21 to suppliers of " commercial l grade items" by excluding such organizations from the scope of  !

10 CFR Part 21. This would, for example, remove the manufacturer /

distributor of commercial grade stainless steel bar stock from the l scope of 10 CFR Part 21 even though that bar stock was subsequently machined into a valve stem and incorporated into a safety-related valve. Such items would come within the scope of 10 CFR Part 21 at the time the item was dedicated to a n ulear application as a basic component. After the dedication, the organization accomplish-ing the dedication and all other organizations in the procurement chain including the licensee would be required to comply with the current provisions of 10 CFR Part 21, e.g., adopt procedures to evaluate deviations or inform the purchaser of the existence of the deviation, and notify NRC of defects. For example, the valve stem of an ASME Section III Class 2 valve may be identical to the valve stem in a valve being used in the petrochemical industry.

The valve manufacturer, who machines the stem from bar stock, would not have informed the bar stock supplier that 10 CFR Part 21 was applicable. At the time the valve stem is withdrawn from the shop stores and incorporated into the nuclear valve, 10 CFR -

Part 21 would then begin to apply since the bar stock has become a basic component. This alternative will allow the manufacturer of commercial grade items to process all orders for identical items in an identical manner.

1 1

1

t t

The Commissioners 5

, Alternative.1: Maintain the effective 10 CFR Part 21 as it relates to nonlicensee ,

y suppliers of " commercial grade items."

Pro: 1. This is the status quo and as such complies with Section 206 of the Energy Reorganization Act of 1974 as amended.

2. The problems that are being encountered in the i implementation of 10 CFR Part 21 may be considered i to be associated with the " learning" of a new regulation, i.e., industry may find a way to prop-erly and appropriately implement 10 CFR Part 21. l l

Con: ,1 . Application of 10 CFR Part 21 is causing an adverse '

effect on the ability to obtain needed items and may increase the costs of such items. l

2. Continued application may have an undesired i effect on the level of safety presently existing at nuclear facilities and activities because of either the inability to obtain required part's and equipment from the most qualified supplier or the -l uncertainty as to whether a new supplier who ,

professes to comply with 10 CFR Part 21 is com- l petent to provide the item. l

3. Continued application of 10 CFR Part 21 in its present form may cause required supplies to be unavailable and thereby reduce nuclear power plant availability. l Alternative 2: Amend 10 CFR Part 21 to remove from its scope the nonlicensee suppliers of commercial grade items for any facility or activity that is licensed or otherwise regulated by NRC.

Pro: 1. The revised rule will remove some impractical portions of 10 CFR Part 21 that are causing cost increases and outright inability to obtain needed supplies without any demonstrable improvement in safety.

2. The revised rule will comply with Section 206 of the Energy Reorganization Act of 1974 as amended.
3. The revised rule, in exempting the suppliers of ,

commercial grade items from the 10 CFR Part 21 regulation, will reduce the potential number of NRC inspections and result in less demand for currentl y l nonexistent NRC inspection resource:3.

l -

L

'4*

Tha' Commissioners 6 y . Con: 1. The revised rule will allow an organization, e.g.,

.' a licensee, to procure a " commercial grade item" without the imposition of the 10 CFR Part 21. require-ments until after receipt of the item even though the organization has knowledge.that the item will be used in a safety-related application,

i. 2. The revised rule will narrow the scope of the NRC inspection authority based on 10 CFR Part 21.

However, NRC will retain the authority to inspect suppliers of commercial grade items provided by Subsection 206(d) where reasonably necessary

'to aid in the. identification by the Commission

. of defects and noncompliances reportable by licensees and suppliers of basic components as provided in 10 CFR Part 21.

Effectivity: If alternative 2 is accepted by the Commission then a decision must be made with regard to when the rule will be effective. The two options described below are believed to be the most viable approaches to rulemaking in this matter.

Effective on publication in the Federal Register A.

and B. Publish in the Federal Register a proposal for comment. Following receipt of comments, accomplish comment resolution and publish an effective rule.

l Factors to be considered in making this decision involve (a) does the rule comport with the intent of the Commission when the initial rule was approved, (b) the urgency of need of the nuclear industry for this clarifying amendment, (c)  !

method of addressing further comment on this clarifying i amendment and (d) the effect upon NRC resources of each course of action. ,

The Staff believes, and-0PE agrees, (see Enclosure 3) that the amendment does comport with the perceived intent in Congress, the discussions between the Commission and the Staff during development of the currently effective 10 CFR Part 21 and the Commission action on the staff recommendations.

A number of licensees have requested exemptions (see Enclo-sure 4) and the Staff believes that a significant number of ~

exemptions have not been submitted. since the Staff has stated that it is proceeding on'an urgent basis'with a w -

. . o

l l

l The Commissioners 7 i

recommendation to the Commission for rulemaking relating to 'l the applicaaility of 10 CFR Part 21 to the non-licensees' I sub-tier suppliers. If the rule is published as a proposed l rule the Staff believes that these requests will be submitted. l Additional comments from the public or the industry on the l amended rule, if published in the effective form, will be l addressed as the Staff does all comments on an effective rule. l Enclosure 4 contains the status of the 10 CFR Part 21 exemptions that related to the sub-tier supplier problem as of August 1,1978. Pending an effective rule change l

NRC would continue to act en a case-by-case basis on each l exemption request in accordance with 10 CFR 121.7. It will l be at least 5 months after the Commission's decision on this paper until a rule change becomes effective in this matter.

NRR estimates that six man-weeks (0.12 man years) is required to process an exemption. If NRR is required to act on only 13 exemptions - a conservative number - in the 5 month period it will require 1.56 man-years. A repro-gramming of NRR resources would be necessary to accomplish this review of exemptions if option 28 is utilized. No -i reprogramming would be necessary in relation to the sub-tier supplier problem if option 2A is utilized.

Recommendation: That the Commission:

1. Aporove publication in the Federal Register in effective form of the amendments to Part 21 that are set forth in Enclosure 5. This would remove from the scope of 10 CFR Part 21 organizations that are nonlicensee suppliers of commercial grade items. This is alterna-tive 2.
2. Note:
a. The amendments of 10 CFR Part 21 as set forth in Enclosure 5 will be published in the Federal Register to be effective upon publication.

,su s*,e quee d 4 &

9.i The Comissioners 8 1

g' '

b. No environmental impact statement, negative 'l deciaration, or envirknental impact appraisc1 i need be prepared in cwection with the amendments I because.the. action taken by the amendments will not significantly affect.the-quality of the human environment.
c. A public announcement such as Enclosure 6, which was prepared by th'e Office of Public Affairs,  ;

will be issued when a notice of rulemaking is I filed with the Office of the Federal Register. l 4

d. The Subcommittee on. Energy and the Environment of the House Committee on Interior and Insular

- Affairs,.the Subcommittee on Ene.rgy and Power of.

the House Comittee on Interstate and Foreign ,

Commerce, and the Subcommittee on. Nuclear Regula-  !

i

~

tion of the Senate Committee on Environment and I Public Works will be informed by letter such as i Enclosure 7.

e. The proposed action will not require any addi- I

, tional Comission resources.

f. The proposed action will result in no additional reporting burden on the public or the NRC.
g. At this time a revision to NUREG 03023 will not be prepared but in order to give wide distribution to these amendments, a copy of the Federal Register notice (Enclosure 5) will be distributeo tnrough the Office of Administration to at least the following:

(1) Individuals or organizations identified by IE that received a copy of FUREG 0302 Rev.1 as a result of attendance at the public regional meetings on Part 21,- '

(2)- Individuals or organizations identified by SD -

that submitted a letter to NRC concerning the proposed or final rule, and 3

NUREG 0302 Revision 1, " Remarks Presented-(Questions / Answers) Discussed at the Public.

Regional Meetings. to Discuss Regulation (10 CFR Part 21) for Reporting Defects and Noncompliance."

4 -

L L

11

, . . a. a , -

'W

[t _

.?

The. Commissioners, .9 L(3) Past and future-purchasers of NUREG.0302.

j^ .

  • Coordi na tion: The Offices of IE,'NRR, and NMSS concur in the recommendation.

The Office of the ELD has -no legaliobjections. Coments of the- i Office of. PE . dated August 28,1978,.-are contained in Enclosure 3. ,

Coments of the GC ' dated August 24, 1978, are contained in Enclosure 8. Revisions-have been made in the paper, enclosure 4 '

- --. and 5, in response to the 0GC comments.

ScheduTing: Affirmation at an. open meeting.

J hd 6' % ' -

Robert B. Minogue, O rector.

Office of Standards Development

Enclosures:

1 - 1.

. Background with Three Attachments

2. Extract from 10 CFR Part 21 7 3. OPE comments of Aug 28,1978 Status of 10 CFR Part 21 Exemption 4.

requests.and' Exemption requests

- celated to'the Sub-tier supplier problem 5 '. Federal Register Notice

6. Oraft Public-Announcement
7. Draf t Co,ngressional Letter
3. OGC Memorandum of August 24, 1978 _

camissioners' comments or consent should be provided directly to the Office of the ecretary by c.o.b. Thursday, Sectember 21, 1978.

Ommission Staff'0ffice' comments, if any, should be submitted to the.Commissicners NLT ectember 15.1978, with an information copy to the Office of the Secretary. If the aper is of suen a nature' that it requires additional time' for analytical review and

.omment, the Commissioners and. the Secretariat should be apprised of when comments may e expected'.

his paper is tentatively -

fuled for consideration at an Open Meeting during the Week of c::amcer 25th.; Please refer :o the appropriate Weekly Commission Schedule, when published, ar.. a speci ff e date; and ' time.

V

'ISTRIBUTION

ccmissioners _

omis s ion' 5:a ff. 0ffices' .

. xec .? Di r.' for : 0pers . - -

egional; 0ffices scretaria:

J n

..,,,..a,.m... 4.._r, .,,,,,,m.- .,,-- ,

a

. y m.o - . . - , . .,p- -

_ y_

v l'

8ACKGROUND a' -10 CFR Part.21 was issued to l implement' Section 206 of 'the Energy Reorgan.i- 1 zation Act of 1974. Section 206 states:

"Sec.206.'($) Any individual director, or' responsible officer of a. firm constructing, owning, operating, Lor supplying the-components l

of any facility or activity which-is licensed or.otherwise regulated. '

pursuant to the; Atomic Energy' Act of 1954, as amended, or pursuantLto this Act, who obtains information reasonably-indicating that such facility or activity or basic-components supplied to such facility or activity--(1) Fails to comply with the Atomic Energy Act of 1954, as amended,'or any ~ applicable rule, regulation, order, or_ license 7

of the. Commission relating to substantial safety hazards, or (2) Contains a defect which could create a substantial safety hazard, as defined by regulations which the Commission shall promulgate, shall-immediately notify the Commission of su;h failure to comply, or of such defect, unless such person has actual knowledge that.the Commission has been adequately informed of such ' defect or failure to comply. j (b) Any person who knowingly and consciously fails to provide the -l

~

noticeLrequired by' subsection (a) of this section shall be subject to_a-civil penalty in an amount equal to the amount provided by '

section 234 of the Atomic. Energy Act of 1954, as amended.

(c)- The requirements of this section shall be prominently posted on the premises of dany facility licensed or otherwise' regulated pursuant to the Atomic Energy Act of 1954, as amended.

(d) The Commission is authorized to conduct such reasonable ins?ec-tions and other enforcement activities as needed to insure compliance with the provisions of this section."

Implementation.of Section 206 as it relates to nonlicensee suppliers was discussed with the Comaission on June 18, 1975, and was addressed in 1 Enc 1csure 1 e

/

4

- -i--, ,,,.w - ,..-.mm, -. , . , * - g- ~

  • SECY-76-82, and SECY-76-82A.1 10 CFR Part 21 was published as a proposed rule on March 3,1975, at 40 FR 8832 Approximately 140 letters of com-ment were received. Attachment A contains some of the pertinent comments received at the proposed rul,e stage relating to the suppliers of "commer- -
. cial grade items."

A major issue that the Staff presented to the Commission for their action was "How should the Commission define a " basic component"; i.e.,

how far down the tiers of suppliers should 10 CFR Part 21 be applied?".

Enclosure 2, an extract of definitions from 10 CFR Part 21, shows the resolution of this issue. To. facilitate implementation of 10 CFR Part 21 throughout the procurement chain (1) five public regional meetings were held in July 1977, (2) staff guidance relating to the implementation and enforcement of 10 CFR Part 21 was published as NUREG-0302 Revision 12 in October 1977, and (3) portions of 10 CFR Part 21 became effective in August 1977, and the remaining portions became effective in January 1978.

After 10 CFR Part 21 b'ecame fully effective there have been a significant number of letters, telephone conversations, and meetings concerning the applicability of 10 CFR Part 21 to nonlicensee suppliers of " commercial grade items." The organizations affected by the application of 10 CFR I

Part 21 have stated that, as presently applied to commercial grade items, (1) the implementation is not practical and effective, (2) compliance with 10 CFR Part 21 may result in a degradation of safety, (3) compliance may result in increased costs without an identifiable increase in safety, and _

because licensees are unable to procure supplies power plant availability may be reduced due to implementation of Part 21. Attachment B contains some pertinent comments frcm letters on this subject.

l l

l l

l l

l l

l l This issue is mentioned in the following locations of the SECY papers:

SECY-76-82 Encl. A, p. 9-11 in Issue 4, Encl. B, p. 5 in paragraph E3, Enci. F, p. 2 in Issue 4,. Encl. F, p. 4 of OGC memo in Issue 4; SECY-76-82A p. 3 in Issue 4, Encl. 3, p. 7-9 in Issue 4. l 2NUREG 0302 Revision 1, " Remarks Presented (Questions / Answers) Discussed at the Public Regional Meetings to Discuss Regulations (10 CFR Part 21) l fcr Reporting Defects and Nnncompliance."

2 Enclosure 1

~

o Extracts from letters of '

Comment on Proposed 10 CFR Part 21

  1. "The definition of 'a basic component in Section 21.3(a) is inconsistent l with the: Act and is too broad to be workable. ... The proposed defini-tion'could be. interpreted as meaning any portion of or item in a plant.  !

. . . It would be much simpler, without. losing the force of the Act, to simp',y keep the' definition at the. system level, where analyses are_ made regarding the safety implications of possible defects. ... We therefore ,

recommend that.the' regulation specifically limit the reporting obligation t

to responsible officers of applicants, licensees and suppliers contracting directly with an applicant or licensee. .."(1) ,

e "Our comment relates to the difficulty of the supplier of a 'constitutent part' differentiating between a part which he manufactures being used for non-nuclear construction, replacement or nuclear construction falling within the meaning of the Part 21. He may choose to withdraw items of his-manufacturer from the market for nuclear components as the alternate for providing more complete inspection programs."(2) .

1

...since many such, components would be quite inexpensive, many suppliers may not consider the risk'to be commensurate with the profit from the transaction and thus discontinue their participation in the nuclear ,

ousiness."(3)

"The definition of 'bssic components' gets undue breadth from the phrase ' system or consituent part.' There seems to be no warrant in the statute for 'constitutent par.t,' and if it is retained it certainly must be confined in some fashion to industrial products which are ' nuclear' in nature."(4)

(1) W. M. Vannoy, Group Vice President, Babcock & Wilcox, dated April 30,1975. Letter 33* p 3 & 4.

.(2) W. J. Shelley, Director Regulation & Control, Kerr-McGee Nuclear Corp. , dated May 1,1975. Letter 55 p 2.

(3) Robert E. Uhrig, Vice President, Florida Power and Light Company, dated May 2,1975. Letter 60 p 2.

(4) James P. Hogar, Attorney, General Atomic Company, dated April 30, 1975. Letter 95 Enclosure p 3.

' Letter sequence number assigned by SECY in the docket file for proposed rule making (40 FR 8832).

Attachment A 1- to Enclosure 1

7

.c

j. l Extracts from letters of (

.Comrent on Effective 1

/ ' -10 CFR Part 21 .l "We have indications that a' number of reliable suppliers whose: nuclear business is a small fraction of their total' business are resisting the acceptance of Part 21', and industry might lose the services of these companies if there .is no' relief from these requirements." (1)

"We are finding that when we put 10 CFR, Part 21 on our purchase orders

~

.for stock that the pipe mills and fittings manufacturers are adding a

.further markup to their price levels." (2) .

)

j

" .. .we 'have encountered refusal to furnish materials or sub-components due to the. applicability of 10 CFR Part 21. .. . . . . Continued rejection by suppliers will- incur.added costs and-seriously impact our project schedules.

Prompt resolution by the NRC of the extent to which Part 21 is applicable l to sub-tier supp.11ers is necessary if the electric power industry is to avoid severe economic impacts." (3) j.

i

...it appears to us- to be unreasonable to require that the provisions of

.10 CFR 21 be' applied to peripheral . areas not directly related to nuclear 4 '

(4) -

end use." .

"We have thus far declined... (to affirm that we would comply with 10 CFR Part 21 where items in' question were purchased from warehouse stock).. .

because we believe that parts' which can be so ordered would not meet the I definition of basic components... ." (5) j l

"where orders are placed ' subject to the provisions of 10 CFR 21' at low levels in the supply chain, there simply. is no good business reason to ,

accept them, ...the regulation presents an industry-wide (electrical

. manufacturing industry) problem. . . . The -solution is nothing short of revision to. the. regulation's which would' exclude the supplier (regardless of' tier level) where this product / component is a standard component." (6)

(1) John W. Gore, Jr., Chairman, Committee on Power Plant Design, Con-struction.and Operation, Atomic Industrial Forum, to Dr. Ernst Volgenau, April.6,.1978.  !

.(2).. X. B. Anderson, Vice President and Director of Operations, ITT Grinnell Industrial Piping, Inc. to M. Peranich, IE, April 25, 1978.

'(3) .H. 0.LReinsch, President, Sechtel Power Corporation to L.V. Gossick, j EDO,..May 4,.1978. >

(4)? Charles .Hansen,. Executive Vice President, Cutler-Hammer to H. K. Shapar, E'.0, May 9,1978. . .

(5) .R. 0. : Hunt, Director of Quality Assurance, Walworth Company, to W. E. Campbell , .Jr. , March 31, 1978. j i.

--(6) LBernard'H. Falk, President, , National Electrical Manufacturer's Asso- 1 l' ciation. to Lee- V. Gossick, July 7,1978. Underscore added.  ;

Attachment 8.

to Enclosure 1 1 1

E , d n . _ . . . =- . . . . . .. .-, . - - ,_

q t j "The requested exemption will not increase the probability or the con-sequences of accidents 'and will not decrease safety margins, it does .

therefore, involve a significant hazards considerttion. In this i not,'rd, rega we point out that the enhancement of safety tc which 10 CFR 21 _

is directed will not be substantially changed under the exemption

~

requested."(7) 3 i

I

)

l (7) James F. Young, Vice President-Technical Resources, General Electric -

Company to Secretary, NRC, June 8, 1978.

Attachment B 2 to Enclosure 1 i

b '

Organizations Known to Have Concerns Regarding Implementation of 10 CFR Part 21-in Regard to

. Commercial Grade ~ Item.

' Sigma ' International ' Instruments (instrumentation)I

[ General Electric Company (other than nuclear energy division)1,3 WalworthCompany(valve)I GETE, Sylvania (instrumentation)2 AirPax(instrumentation)2 Gimpel Machine Works (valve)2 Kin'gsbury (thrust bearing)2 Tuthill (oil pumps)2 ,

. Westinghouse (instrumentation)

Foxboro (instrumentation)2

! Fisher & Porter (instrumentation)3

-AllenBradley:(switchgear)3 ,

Elgar Corporation (power supplies)3 7

^

Hoffman Engin'eering (instrumentation cabinets)3 Baldwin Steel 3-Buchanan Company (terminal blocks)3 DeLaval Turbine3 ,4 Bailey. Meter3 ,4 Air Products3 ,4 PX Engineering3 ,4 Dravo3 ,4 I

Source of in' formation-is a direct letter from the organization.

?

Source of.information is by telephone call from a higher tier purchaser than -

.tae' organization involved.

3 Source.of O fermation is by letter from a higher tier purchaser other than the organization involved.

~

Possibie cost impact was specifically identified. .[

1 Attachment C '

to Enclosure 1 L 2

~

/

Extract from 10 CFR Part 21

/ ^

521.3(a) " Basic component," when applied to nuclear power reactors means a plant structure, system, component or part thereof necessary to assure (1) the integrity of the reactor coolant pressure boundary, (2) the capability to shut down the reactor and maintain it in a safe shut-down condition, or (3) the capability to prevent or mitigate the conse-quences of accidents which could result in potential offsite exposures

" Basic comparable to those referred to in 5 100.11 of this chapter.

component," when applied to other facilities and when applied to other activities licensed pursuant to Parts 30, 40, 50, 70 or 71 of this chap- ,

l ter, means a component, structure, system, or part thereof that is l directly procured by the licensee of a facility or activity subject to l the regulations in this part and in which a defect (see 5 31.3(d)) or )

failure to comply with any applicable regulation in this chapter, order, or license issued by the Commission could create a substantial safety In all cases " basic component" includes design, hazard (seel'21.3(k)). I inspection, testing, or consulting services important to safety that are .

associated with the component hardware, whether these services are per-formed by the component supplier or others.

5 21.3(e) " Deviation" means a departure from the technical requirements

~

included in a procurement document (see 5 21.3(1).

1 s 2k.3(g) " Evaluation" means the process accomplished by or for a licen- l see to determine whether a particular deviation could create a substan-tial safety hazard.

i21.3(k) " Substantial safety hazard" means a loss of safety function to the extent that there is a major reduction in the degree of protection provided to public health and safety for any facility or activity licensed, other than for export, pursuant to Parts 30, 40, 50, 70 and 71.

1 Enclosure 2

, . . . - . .~ . - - -,

'

  • mw* *-% N
  • ge- g '~w. 7

.e d' "'%g . YE! ' UNITED STATES 2*J

.[h

. l NUCLEAR REGULATORY COMMIS$10N WASHINGTON, D. C. 20585

- i. j- , '..

I #f August 28, 1978-

}4

./. 1

~ MEMORANDUM FOR: Tom Rehm. 1

~

FROM: Ken'Pedyse

SUBJECT:

ORAFT STAFF PAPER ON PART 21 l I have reviewed the draft paper and have no comments. However, in regard to OGC's memo.to you of August 24, I concur in the staff's recommendation 1 that the rule change ^ be made imediately effective. I believe the staff's

. records ~ will demonstrate-that this course 'of action reflects the sense of the Comission when it approved originally the publication of Part 21 in effective fonn.

)

l 1 1 cc:. Jim .Kelley

.1 l

CONTACT: Al Konneke, OPE 634-3295 ,

or .

Pat Comella, OPE ,

634-3295 i

\

S.

c

4. e O

g q.

Enclosure 3 Q>

< . v . .

A' 10 CFR PART 21 EXEMPTIONLREQUESTS RELATED TO SUBTIER SUPPLIERS. .

. Request Date, - Status

' Organiza tion -

,3 NUSviaShaw,. Pitman,fPotts Denied

& Trowbridge 01/05/78 Philadelphia Electric (50-277

& 278, Peach Bottom 2 & 3). Granted NRR 04/27/78 l via Connor, Moore & Corber 03/22/78 03/26/78 Denied Energy Incorporated EDO 05/30/78 1

Public Sersice Company of'Colo- 04/11/78

-rado (50-267 Ft. St. Vrain) 05/01/78 Denied Gould, Inc., Switchgear.-Division EDO 08/04/78 06/08/78 Denied General Electric - Fairfield EDO 06/30/78 0hama Public Power District (50-285, Ft. Calhoun Station #1) 1 via LeBoeuf. Lamb, Leiby & MacRae) 06/14/77 Denied -l C-E Power Systems 07/07/78_

SD 08/22/78 1

SNUPPS(50-482through486)' 07/21/78 Baltimore Gas & Electric Company i R 07/25/78

-(CalvertCliffs)

Virginia Electric & Power Co. i (50-280, 281'Surry 1 & 2) 07/25/78 LouisianaPowerandLight-(50-382 1 Waterford 3). 07/28/78  !

Public Service Electric & Gas 07/31/78 1 (50-272, 311 Salem 1 & 2)

NPendingatNRR.

~

i 1 Enclosure 4 l

im.> , ,we,.,, ,,,,7w-- ir.-- ., , er.wa., ---om-%.,4v g+ 'Wwwvpm t+- -e t ee p t-+ m e ' 'i

  • 7590-0t Title 10 - Energy -l u . _

.* C'HAPTER I - NUCLEAR REGULATORY COMMISSION Part 21 - Reporting of Defects and Noncompliance l l

1 Amendments Regarding Basic Component  ;

AGENCY: Nuclear Regul_atory Commission

'l ACTION: Final Rule j j

SUMMARY

The Nuclear Regulatory Commission is amending its regula- l j

tions to 1imit the types of items that are within the scope of its rule for reporting defects and noncompliance. This action is believed .i i '

necessary since the currently effective rule is being applied by organizations within its scope to an extent not contemplated and is q causing problems relating to the supplying of equipment. The amend- l ments provide that items that are available in general commerce and which have no unique requirements imposed for nuclear application will not be within the scope of the revised rule for reporting defects and noncompliance. These amendments will alleviate the above proolem.

DATE: These amendments will be effective on [the date of noticing in the Federal Register].

FCR FURTHER INFORMATION CONTACT: Mr. W. E. Campbell, Jr., Office of i

. Standards..'0evelopment, U.S. Nuclear Regulatory Ccmmission, Wash- -

i

'ington, D.C., 20555, 301 443-5913.

I i

1 Enclosure 5 7 , .;

...-.- .- -..__ i

.mr-s-' Ah -59 $4 SUPPLEMENTARY INFORMATION: Notice is hereby given that the Nuclear i l

l Regulatory Commission (hereinafter the " Commission") has decided to

.I amend 10 CFR Part 21 " Reporting of Defects and Noncompliance."

Specifically, the Commission has decided to impose limits on the types of items that are used in facilities or activities licensed pursuant to Parts 30, 40, 50, 70, or 71 that are within the scope of 10 CFR Part 21.

On March 3, 1975, 10 CFR Part 21 was published as a proposed rule (40 FR 8832)'. On June 6, 1977, 10 CFR Part 21 was published as

)

an effective rule (42 FR 28891) with some portions of the rule to be effective on July 6,1977, and the remaining portions to be effec-tive on January 6, 1978. On July 7,1977, a Federal Register notice (42 FR 34886) changed the initial effective date to August 10, 1977 vice July 6,1977. To facilitate implementation of 10 CFR Part 21 a series of public regional meetings were held in July 1977 and based on those meetings the Commission Staff in October 1977 published NUREG-0302 Rev.1, " Remarks Presented (Questions / Answers) Discussed at the Public Regional Meetings to Discuss Regulations (10 CFR Part 21) for Reporting Defects and Nonccmpliance." NUREG-0302 Rev. 1 contains staff guidance relating to the implementation and enforcement of 10 CFR Part 21 and is available through the National Technical Information Service, Springfield, Virginia, 22161. In the preamble ,

to the effective. rule, the Commission stated that it intended "to examine closely the implementation of 10 CFR Part 21 with a view ..

2 Enclosure 5 l

l l

l

'4 to making any clarifying or other changes that may be warranted in the light of experience."

O Part 21 defines a " basic component" subject to the reporting and other requirements of the rule. In response to inquiries during and subsequent to the public regional meetings relating to "off-the-shelf" or " catalog" items, the staff provided guidance that such items may be within the scope of 10 CFR Part 21 depending on the circumstances at the time of procurement. This guidance has been construed by numerous organizations to mean that the requirements of 10 CFR Part 21 apply to manufacturers and distributors who are involved to any extent in supplying basic components, or parts of basic components, of a facility or activity including supplying base material or functional assemblies '

to the manufacturer of the " basic component." This meaning has lead to the imposition of 10 CFR Part 21 at a procurement stage where there are no design or specification requirements that are unique to application of the item at a nuclear facility or activity, e.g., relays.

The use of this meaning of basic component has not improved the quality of such items and, therefore, has not enhanced safety.

Instead it is causing cost increases, and inability to obtain needed supplies. To the extent that the purchaser is unable to obtain a needed item from the most qualified supplier and must turn to other less qualified suppliers, defining basic component to include such an item may to some extent detract from safety. ' o relieve the conditions that T

are resulting from the above interpretation and to mitigate this potential -

3 Enclosure 5

, , - 4 V

reduction of safety Part 21 is being amended to remove from the scope of 10 CFR1 P art 21, during specific stages of procurement,;those items of a

<- commercial grade, e.g., bearings, relays, and bar stock that are (1) not .

subject..to design or specification requirements unique to facilities or activities licensed by-the Commission, (2) used in applications other than facilities or ' activities lice tsed by the Commission and (3) able to be ordered from the manufacturerjdistributor on the basis of the manufacturer's published specifications. At a defined stage of procurement,'when the item is " dedicated"~ to a " basic component" (see 10 CFR 21.3(c-1)) the item will become subject to' the requirements of 10 CFR Part 21.

4 Prior to these amendments 10 CFR Part 21 included within its scope direct inspections of licensees and suppliers as provided under Sec-tion 206 of the Energy Reorganization Act of 1974. The revised rule will

' ,l narrow the scope of the NRC inspection authority based on 10 CFR Part 21.

However, NRC will retain the authority to inspect suppliers of commercial grade items provided by Subsection 206(d) where reasonably necessary to aid in the identification by the Commission of defects and noncompliance reportable by licensees and suppliers of basic components as provided in l

10 CFR Part 21. l Procurement documents that were issued in accordance with 10 CFR 5 21.31 after August 10, 1977, and invoked 10 CFR Part 21 may be amended to delete reference to 10 CFR Part 21 if the item being procured complies withithe definition.of a'" commercial grade item" (see 10 CFR 21.3(a-1)).

.The-amended rule will clarify the applicability of 10 CFR Part 21 .-

and thereby~ allow for. precise application of the rule to 'those . items tnat i

I 4 Enclosure 5

['

are subject to design or specification requirements unique to facilities or activities licensed pursuant to parts 30, 40, 50, 60 or 71 or 10 CFR

^ *

[ Chapter 1.

Since the amendments are intended, in part, to respond to a number of requests for exemptions from 10 CFR Part 21 which are necessary to ensure the continued availability of components for the nuclear industry and since the amendments narrow the scope of I

the regulation thereby relieving a restriction on persons subject to it, the Commi'ssion has found that good cause exists for omitting t

notice of proposed rulemaking and public procedure thereon as j i contrary to the public interest, and the Commission has further found i I

i I that the amendments should be made effective upon publication in the

' FEDERAL REGISTER without the. customary notice period.

1. The final sentence of 5 21.2 is amended to read as follows:

Nothing in these regulations should be deemed to preclude either an individual or a manufacturer / supplier of a commercial grade item (see 5 21.3(a-1)) not subject to the regulations in this part from reporting to the Commission a known or suspected defect or failure to comply and, as authorized .by law, the identity of anyone so reporting will be withheld from disclosure. 1

2. A new sentence is added to the end of 6 21.3(a) to read as follows:

A commercial grade item is not a part of a basic comoonent until af ter dedication. (see i 21.3(c-1)) .

5 Enclosure 5

e'

3. New paragraphs (a-1) and (c-1) are added to 5 21.3 to read as follows:

^

(a-1) " Commercial grade item" means an item that is (1) not subject -

.I to design or specification requirements that are unique to facilities or activities licensed pursuant to Parts 30, 40, 50, 70, or 71 of this chapter and (2) used in applications other than facilities or activities licensed pursuant to Parts 30, 40, 50, 70, or 71 of this chapter and (3) to be ordered from the manufacturer / supplier on the basis of specifications set forth in the manufacturer's published product description (for example a catalog).

! (c-1) " Dedication" of a commercial grade item occurs after receipt when that item is designated for use as a basic component.

l

4. A new sentence is added to the end of 5 21.7.

Suppliers of commercial grade items are exempt from the provisions l

of this Part to the extent that they supply commercial grade items.

Sec. 161, Pub. L.83-703, 68 Stat. 948; sec. 234, Pub. L.91-161, 83 Stat. 444; sec. 206, Pub. L.93-438, 88 Stat.1246 (42 USC 2201, 2282,5846).

Dated at Washington, D.C. , this day of August 1978.

For the Nuclear Regulatory Commission.

6 Enclosure 5 a

? - +.

NRC AMENDS' REGULATION ON REPORTING DEFECTS IN COMPONENTS OF NUCLEAR FACILITIES The Nuclear Regulatory Comission is eliminating comercial grade items F

from the scope of its regulation on reporting defects in basic components for nuclear facilities.

Part 21 of NRC regulations requires directors and responsible officers of firms or organizations building, operating or owning 'NRC-licensed facili-ties or conducting NRC-licensed activities, to report defects in. components and failures to comply w'ith regulatory requirements which may result in a substantial safety hazard. Also covered are directors and responsible officers

' of firms supplying safety-related components and safety related design, test-t ing, inspection and consulting services. Th'e covered firms must adopt inter-

- nal procedures to implement the regulation. Failure to comply with the report-ing requirements can result.fn civil penalties.

. Interpretations of " basic component" under which Part 21 has been applied to comercial grade or "off-the shelf" items have resulted in difficulties obtaining needed items or obtaining them at increased prices. Continued application may have an undesfred effect on the level of safety existing 1 at facilities because of the inability to obtain needed items.

To' relieve these conditions, Part 21 is being amended to ifmit its scope to include licensees and organizations supplying basic components which are not comercial grade items. This would, for example, remove the

~ manufacturer / distributor of a ccmercial grade steel bar stock from the i

scoce of Part 21 even though that bar stock may subsequently be used in a  ;

1 Enclosure.5 ,

E

)

safety-related nuclear valve. That item would become a basic component when its purchaser determines that it will in fact be a part of a nuclear

.' ccmponent. At that point, Part 21 would apply.

The amendment to Part 21 is effective upon publication in the Federal Register on .

\

\ .

\ .

4 O

'e 2 Enclosure 5 ,

w

^

Y. = -. . .. w. , -. . -.. - ,- . .

s. . , , -

.. 1

. DRAFT CONGRESSIONAL-LETTER

'?

L .,'

Enclosed for the information of the Subcommittee are copies of a Notice-

.of Rule Making to be' published in the Federal Register.

1 The amendment of Title 10, Code of. Federal Regulations,' Chapter I, Part 21, " Reporting 'of Defects and Noncompliance". responds to a number of requests for exemptions. from 10 CFR Part 21. The currently effective rule is being-applied by organization's within its scope to an extent not contemplated

~

and is causing problems relating to the supplying'of equipment. l i

i -

Continued application of the. currently effective rule may have an undesired ,

effect on the level of safety' presently existing at nuclear facilities and j activities, because of either 1).the -inability to obtain required parts and equipment from the most qualified supplier or 2) the uncertainty as to 1

whether a new supplier, who professes to comply with the currently effec- l tive rule, is competent to provide the item.

These amendments provide that items, that are available in general commerce and'which have no unique requirements imposed for nuclear application, will not be within the scope of' the revised rule.

. Also. enclosed is a copy of a public announcement to be released by the Commission. on. this matter in' the. next few days. ,

- Sincerely,  ;

1 Enclosure 7

.9 m vEo'- -

  • - e e-. v tw ,- e Uv.- , . 4,,,,..,, .,m,,.iy,, ,, .,y. , , ,,

.....cw.. ..

a

  • t NUCLEAR REGULATORY tOMMISSION

]

O. .I 3',.l sj I.,.,./v WASHINGTON, D. C.'2055E

  • f :

, j

%, ' %d. . . . . sf August 24, 1978 MEMORANDUM FOR: Thomas A. Rehm %s [ba Assistant to the EDO .

FROM: Stephen F. E11p Acting General A

SUBJECT:

OGC COMMENTS ON DRAFT STAFF PAPER ON AMENDMENTS TO PART 21-This draft staff paper is concerned with amendments to Part 21 to exempt commercial mater,ials and parts from NRC reporting regulations. We understand that the ambiguity ,

in Part 21 has caused serious problems for licensees and f their suppliers. The proposed solution to the problem i consists of narrowing the scope of the regulations to exempt certain commercial materials While in weabelieve final rule tothere that be made may be immediately effective. -

a strong factual basis for this course of action, we are not convinced that that case has been made in the pacer and in the proposed Federal Register notice to indicate to the public that " good cause" exists to permit NRC to exempt this rule from the notice and comment requitements of the Admin-1strative Procedure Act. 5 U.S.C. 553(b). Because Part 21 it is likely has attracted so much attention in the past, in that some members of the public would have an interest In order to minimize any commenting on this amendment.

risks in claiming the exemption under the Administrative Procedure Act, we strongly recommend that the rule set forth clearly the factual basis for the NRC claim that good cause exists for making a final rule immediately effective without prior notice to the general public and solicitation of public comment.

Finally, we recomiend that another alternative be considered to an immediately effective final rule. If there is a need for swift NRC action in certain hardship cases, the NRC could Ccntact:

Mark E. Chopke, OGC -

632-1465 4

Enclosure 8

.1

. . . . t

~'

.' < l

.'homas A. Rehm August 24, 1978 j grant exemptions on a_ case-by-case basis while soliciting  !

< comment on the amendment to Part 21. This method would have l the advantages of providing relief to those who need it while at the same time affording public comment prior to ~

a more general rule change.

cc: K. Pedersen, OPE ,

E e

d 6

1 I

I l

1 e

a l

Enclosure 8

W

.a 10 CFR PART 21 APPLICABILITY .TO NON LICENSEE SUPPLIERS OF' COMMERCIAL GRADE [TEMS

'(SECY 73-496)- .

PURPOSE: 1) INFORM THE COMMISSION OF THE IMPACT OF 10 CFR PART 21

. 2) SEEK COMMISSION APPROVAL OF A. NOTICE I 0F RULEMAKING I BACKGROUND: 1) ENERGY REORGANIZATION ACT OF 1974 S206 l

2) 10 CFR PART 21 C42 FR 28891/ JUNE 6; 1977) l l

PROBLEM: IMPLEMENTATION AS INTENDED IN A PRACTICAL -i 1

AND EFFECTIVE MANNER- 1 R.ECOMMENDATION : 1) RULE CHANGE I

2) TIMING G

f g ..

+ .-w-- c , E w--%.- ---.n..-,.

6 0 _

2

. 8 3

. . 4-

. .. . . 3 _

9 r

h L P

e c u iS f

c _

f f _

Oo _

en bi o l _

6 .iss 0 ni s 2 om

@ p -

8 sm eo R C 3

4-r o he 3 r t

9 oy t fi L c t P eo r

D N i .

.tc _

.l e

l _

yaf .

nh e _

ASD

)

a 1 7 '

7 1

8- __

1 2 -

L < l !; , 2 ij ~

l l.

l' i

PL 93-438 @ 206 (CONT.)

b) Any Person Who . . . Shall be Subject to a  :

Civil Penalty . . .

i 1

i !l

c i .

PL 93-438 @ 206 (CONT.)

d) The Commission is Authorized to Conduct

Such Reasonable Inspections and Other l

-Enforcement Activities... .

i, r

I --

i l

21-8177-4 PL 93-438 @ 206 s

... s .

I i

1

.^

-t I IMPLEMENTING .

PROVISIONS (CONT.) .

21.31 Each . . . Entity . . . Shall Assure That Each Procurement ,

! Document . . . Specifies 10 CFR Part 21. . .

4 i ,

b I 21-8177-11 10 CFR Part 21, Imp. Prov.

j j I- ,

-g 7 ..

a - _, .;

6 M e

~

4 821,3 (A-1) " COMMERCIAL GRADE ITEM" MEANS AN ITEMTHATIS (1)'NOT SUBJECT TO DESIGN OR SPECI- .

.. 7, FICATION-REQUIREMENTS THAT ARE-UNIQUE TO FACILITIES OR ACTIVITIES LICENSED PURSUANT TO' -i PARTS 30,-110, 50,~70, OR 71 0F THIS CHAPTER AND (2) USED IN APPLICATIONS OTHER THAN

~

- FACILITIESORACTIVITIESLICENSEDPURSUANTTOPARTS30,'l10?50,70,OR71oFTHIS -

1

~

CHAPTER.AND-(3) TO BE ORDERED'FROM THE MANUFACTURER / SUPPLIER ON THE_ BASIS OF SPFCIFT-CATIONS SET FORTH IN THE MANUFACTURER S PUBLISHED PRODUCT DESCRIPTION (FOR FYAMPIF A .u..

CATALOG).

" ^

L 827021 -

=<

V

.E_.3_..,w swr , _ , _ , j--. - - _. .m.. m _,,_-_,-,. , . _ - _ _ . - ,- . , ~ __. ._...,_,m. _m,,. -

--v:,,

+

. . . . _. 2 m .

-t

- - :j _:

.} '

1 .j -

u. - .

e ,

li21.3 .

s 3 ;;

, r.

(C-1)"DbDICATION"0FAdOMMhRCIALdRADbIThMdbCUkSAFTERRbCEP[WHEN-THATITEM-IS-DESIGNATED FOR USE AS A BASIC COMPONENT. .

a e

6 2

4 4

l 2

8270-2 i

j t.

8

. i l

L

. g.

l l- .

- i

,. i

. 1.

S21.3 DEFINITIONS - _

l i

"..."' BASIC COMPONENT, "WilEN APPLIED. . .MEANS . . . . ...A COMMERCIAL ~ GRADE' ITEM IS NOT A PART OF A BASIC COMPONENT UNTIL AFThR DhD CATION. (SEE921.3(c-1))."

9 6

8270-3

,j -

?

- . a- - - - - _ _ _ - _ _ -

1 i

^

i 821.2 SCOPE  ;

i

~

" . . .N0 TILING IN THESE REGULATIONS SHOULD BE DEEMED TO PRECLUDE EITHER_ AN INDIVIDUAL l

OR A MANUFACTURER / SUPPLIER OF A COMMERCIAL GRADE ITEM (SEE S21.3(A-1)) NOT SUBJECT ,

'TO Tile REGULATIONS IN THIS PART FROM REPORTING TO THE COMMISSION A KNOWN OR SUS-PECTED DEFECT OR FAILURE TO COMPLY AND, AS AUTHORIZED BY LAW, Tile IDENTITY OF ANY-ONE SO REPORTING WILL BE WITHHELD FROM DISCLOSURE. "

l 8270 ll L__ _ ..

_ 0.. o

_- g.

.1- ,

'?

q-

. !~ , .

621,7 EXEMPTIONS

~

"THE COMMISSION MAY... GRANT SUC EXEMPTIONS.... SUPPLIERS OF COMMERCIAL GRADE ITEMS AREEXEMPTFROM'THEPROVISIONSOFTHIdPhRTTOTHEEXTENTTHATTHEY~SUPPLYCOMMERCIAL .;-

GRADE ITEMS." ,

i 4

8270-5

, , - - _ - _ _ . --_.-.-.2.. _ - - . ~ - - _ _ - - - - - . _ - - . . - .

e