Forwards LER 97-021-00,documenting Condition That Occurred at Millstone Nuclear Power Station,Unit 3 on 970218. Commitments Made within Ltr,Listed
Date released: 06/09/2020 Download: ML20147F472


:on 970218,defective Design of RSS Expansion Joints Tie Rod Assembly Discovered.Caused by Defective Design Which Had Been Issued by Temp Flex Division of Johnson Controls.Mods Completed