s UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION in the Matter of
{
GEORGIA INSTITUTE CF TECHNOLOGY
)'
Docket No. 50-160 900 Atlantic Drive, N.W.
)
License No. R-97 Atlanta, GA 30332
)
EA 88-32 ORDER MODIFYING LICENSE, EFFECTIVE IMMEDIATELY I
The Georgia Irstitute of Technology (Georgia Tech) is the holder of Operating License No. R-97 issued by the Nuclear Regulatory Commission (NRC or Commission) on December ?". 1964, and subsequently anended.
The license, as amended, authorizes Georgia Tech to operate its modified research reactor incated on its campus in Atlanta, Georgia, at power levels up to 5 megawatts (thermal) for research and development activities in accordance with the conditions specified therein.
11 The Georgia Tech Research Reactor (GTRR) is utilized t. ccnduct irr'.41ation experiments including the irr6diation of topa: ard other gem-ouaitty n.inerale.
During t..t week of August 17, 1987, the improper opening of an irradiated topcz container resulted in contanination of tha reactor building. An inspection cf the licentee's operational and Fe:alth physics 6ctivities, including rations pertaining to this contamint.t mr, event, was cc.nducteu on Dec*mber 16 1987, and 1
venuary 4-5, 1988 during which it was learned of the August contamination event.
The inspection revealed that the experinent corditions and manipulation of the 8G01210200 880120 ADOCK 050 O
{DR
. experiment materials resulted in unexpected elevated radiation levels from the experiment container and also the unmonitored release of Cadmium-115 (Cd-ll5) in the reactor building. The exposure dose rate at one foot from the experiment material was approximately 3 rem per hour (R/hr) on August 18, 1987 and qualitative reasurements of radioactive contamination indicated levels on i
masolin wipes of approximately 20 mR/hr on August 19, 1987.
The NRC staff also determined during the inspection that the licensee had not provided adequate exposure assessments for personnel involved in the August 1987 incident, nor had the licensee conducted adequate verification surveys to demonstrate that the contamination had not been spread by personnel to areas cutside of the reactor building.
Inspection findings in'dicated that the licensee had not conducted its activities in full ecmpliance with NRC requirements. A written Notice of Violation has not been issued at this tima; additional inspection activities are being conducted. Nonetheless, the following safety concerns, which could result in unnecessary personnel rediatien exposures and the potential spread of contamination away from the reactor building as a result of experiment manipulations, have already been identified:
A.
Cn llaj 4, 1987, an enforcement conference was held with the licensee in which the licensee outlined steps to be implemented to improve the management controls over operations and health physics at the GTRR to assure safe operation. These actions included steps to assure appropriate interaction between health physics and cperations components of the organization. A recent inspection has shown these t
actions have not been folly successful and indicate that management control problems continue.
& 1 B.
The licensee's health physics and operating procedures were i, adequate in that they failed to address the precautions and equipment to prevent unnecessary exposure and contamination during handling and manipulation of materials irr:diated during experiments at the GTRR.
C.
The licensee failed to follow operating proc.*dures as required by Technical Specifications 73 followr:
1.
The August 1907 experinent involved irradiation of topaz gemstones ft
- total of 41.8 megawatt hours compared to 20 megawatt-hours authorized on the Request for Mirior Experiment Approval regarding topaz irradiations dated April 3, 1987.
2.
Procedure 3102, Quality Assurance for Exrariments October 28, 1982, requires that the approval form for Categcry 4 experiments, such as the topaz irradiation, address quantitative controls of reactivity, activation, shielding, cooling and materials.
Pequest for itinor Experiment Approval, dated April 3, 1987, regarding the topaz irradiation lists the estimated isotopic activities to be "nil."
However, following an initial irradiation in April 1987, activetion of the experiment materials, including the container, resulted in radiation levels of approximately 3 R/hr at a dister.ce of o.e foot from the container.
These elevated exposure levels were not evaluated or included in experiment plans for the August 1987 topaz irradiation.
1 i )
i D.
Assessments of intere l and external personnel expos'ures for personnel involved in the August 1987 incident and decontamination event were not adequate in that they did not deternine and decurrent intakes of radioactive material, extremity dose or skin duse.
E.
Surveys conducted were inaaequate as follows:
i 1.
Continuous air samples collected from within the reactor building during the August 1987 incident were not adequate to detaisine intakes in that they were not representative of.concentratiqns.
of radioactive material in the work area.
2.
Sybsequent to the August 1987 incident, surveys were inacequate to define the extent and amount of racioactive certaminatior in the reactor building, on personnel,'and in personal property offsite which could have been potentially contanin3ted.
F.
At the time of the inspectim the licensee had failed to complete a thorough review of the August 1987 contaminatian event regarding its cause or causes, nor had any corrective measures been implemented as i
of January 5, 1988 to prevent recurrence during future experinents.
G.
Licensee management has indicated that there are other events similar to the August 1987 event that also have not yet been fully evaluated by the licensec.
These safety concerns were the subject of discussions i
_,_...__m
~
p
.. l-between Region II and the licensee on January 7, 1988.
Upon the conclusion of these discussions. Region 11 verbally requested, and the licensee agreed that irradiation experinents would be suspended until further notice.
III After consideration of the apparent violations and safety hazards posed by the licensee's conduct of experiment activities, as exhibited during the August 1987 event, and the subsequent lack of aggressive review and corrective actions by the licensee, I have determined that certain actions by the licensee cre required, and an Order modifying the Georgia Institute of Technology license is necessary, to protect the health and safety of the public and licensee's employees.
Therefore, pursuant to 10 CFR 2.204, I find that the public health, safety, and interest require that that this Order be effective ircediately.
IV Acc9rdingly, pursuant to Sections 104, 161b, 161c, 1611, 1610, 182 and 186 of the Atomic Energy Act of 1954, as amended, 42 U.S.C. 2011 el seq., and 10 CFR 2.204, IT IS HEREDY ORDERED, EFFECTIVE IlNEDI ATELY, THAT:
A.
The licensee shall cease utilization of the reactor facility for irradiation experiments until the following conditions are met and the fiRC approves, in writing, the resunption of irradiation experiments.
a j
i '
1.
Manegement controls over facility operation, including irradiation experiments, are assesstd to identify weaknesses.
2.
A formal review is conducted, including record reviews and in-depth personnel interviews, to determine (a) if other occurrences similar to the August 1987 incident have occurred, and (b) the principal rcot causes of the August 1987 incident and any other similar incidents.
3.
An assessment of internal exposure, external whole body, extremit.v. and skin doses to personnel involved in the August -
1987 incident (any cther identified incidents) and/or decontamination activities is conducted.
4 The GTRR health physics and operatine procedures are reviewed tt idencify inedecuacies which contributed to the Auguct 1987 contamination event (and any other identified events).
5.
Corrective actions are identified and a schedule established for implementing the corrective actions, including necessary changes in management controls, operations, and procedures.
6.
A training program addressing all changes to management controls, operations, and procedures is developed and implemented.
E
1 7.
The licensee's reviews and assessments of the above matters are documented and a summary of these reviews and assessments, including corrective actions and appropriate schedules, are submitted in writing to the NRC for review and approval.
B.
Results of the licensee's survey of the house of the individual involved in the August 1987 contamination event shall be provided in writing to the NRC within 10 days of the issuance of this order.
The Regional Administrator, Region II, may in writing relax or rescind any of.
the above conditions upon written request and demonstration of good cause by '
the licensee.
V The licensee or any person other than the licensee adversely affected by this Order may request a hearing on this Order within twenty days of its issuance.
Any request for hearing shall be sent to the Director, Office of Enforeement.
U.S. Nuclear Regulatory Conmission, Washington DC 20555.
Copies shall also be s
sent to the Assistant General Counsel for Enfercement at the same address and the Regional Administrator, NRC Region II, 101 Marietta St., NW, Suite 2900, Atlanta, GA 30323.
If a person other than the licensee requests a hearing, that person shall set forth with particularity the manner in which the 1
petitioner's interest is adversely affected by this Order and shall address the criteria set forth in 10 CFR 2.714(d). A REQUEST FOR HEARING SHALL NC' STAY THE IltMEDIATE EFFECTIVENESS OF THIS ORDER.
. If a hearing is requested by the licensee or any person who has an interest adversely affected by the Order, the Commission will issue an Order designating the time and place of any such hearing.
If the Licensee fails to request a hearing within 20 days of the date of this Order, the provisions of this Order shall be final without further proceedings.
If a hearing is held, the issue to be considered at such hearing shall be whether this Order should be sustained.
FOR THE NUCLEAR REGULATORY COMMISSION f
i
)
KS &
J s.M. Taylef veputy Executive Director for Regional '.perations Dated at Bethesda, Maryland thisjodayofJanuary1988 O
..,,.;~.
.i-
_s %,
'Gecrgia' Institute of Technology-
. Distribution POR SECY JTaylor,'DEDRO
~JNGrace, RII JLieberman, OE
.EFlack, OE LChandler, OGC Enforcement Coordinators-RI, RII, RIII, RIV, RV BHayes, OI SConnelly. OIA EJordan, AE0D VMiller, NMSS JCunningham,.NRR State of. Georgia OE File EA File DCS.
Msw hv.,a, m
7 G ss *d e s p.up lack an r