ML20147F005
| ML20147F005 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 03/13/1997 |
| From: | Caldwell J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Connell W ILLINOIS POWER CO. |
| Shared Package | |
| ML20147F009 | List: |
| References | |
| NUDOCS 9703190352 | |
| Download: ML20147F005 (3) | |
See also: IR 05000461/1997002
Text
r
QC0
.
d
I
'
March 13, 1997
l
l
Mr. W. Connell
Vice President
Clinton Power Station
'
Illinois Power Company
{
Mail Code V-275
i
P.O. Box 678
Clinton, IL 61727
SUBJECT:
NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 50-461/
97002(DRS)
Dear Mr. Connell:
On January 10,1997, the NRC completed an inspection at the Clinton Nuclear Power
' Plant. Subsequent telephone discussion was held with your Emergency Preparedness staff
on January 31,1997. The enclosed report presents the results of that inspection.
Areas examined during the inspection are identified in the report. Within these areas, the
inspection consisted of a selective examination of procedures and representative records,
,
interviews with personnel, and observation of activities in progress. The purpose of the
inspection effort was to determine whether activities authorized by the license were
conducted safely and in accordance with NRC requirements. The summary contained in
the report provides an overview of our assessment of your performance in the area of
Emergency Preparedness, an aspect of Plant Support.
This inspection was to perform the emergency preparedness core inspection as identified
in Inspection Procedure 82701, and to review the status of previous open inspection
findings. At the conclusion of the inspection, the findings were discussed with those
members of your staff identified in the enclosed report.
Emergency Preparedness aspects of the September 5,1996 seal failure event are
discussed in this report. While initial event classification was proper, the Unusual Event
declaration was improperly utilized by the operations staff to take steps in the Reactor
Recirculation procedure. Event classifications are init.'ated to activate appropriate response
personnel and procedures. Operational decisions should be predicated on operational
safety action levels clearly anticipated in operating procedures.
Additionally, the Shift Supervisor during the event had two opportunities to classify an
l
Alert as a conservative decision, but neither of these options were exercised. We also
i
noted that your EP staff evaluation of the event was completed three months after the
'
event and, did not discuss conservative emergency response decision making. No member
i
of your Emergency Preparedness staff participated in the root cause evaluation. As you
are aware, other aspects of this event were discussed during the enforcement conferences j
held during February 1997.
-8i
C
9703190352 970313
- DR
ADOM OSOOg
1
isppgppppggg
(
,
._
- -.
._
-
-
-
---
--
l
.
.
W. Connell
-2
March 13, 1997
Based on the results of this inspection, the NRC has determined that a violation of NRC
requirements occurred relative to failure to maintain the backup meteorological tower.
This violation is cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding it are described in detailin the subject inspection report.
in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter,
the enclosure (s), and your response (s) to this letter will be placed in the NRC Public
Document Room,
Sincerely,
/s/ John A. Grobe (for)
'
James L. Caldwell, Director
Division of Reactor Projects
Docket No. 50-461
License No. NPF-62
Enclosures:
2. Inspection Report 50-461/97002(DRS)
i
cc w/encls:
P. Yocum, Plant Manager,
Clinton Power Station
R. Phares, Manager - Nuclear Assessment
i
P. J. Telthorst, Director - Licensing
Nathan Schloss, Economist,
Office of the Attorney General
K. K. Berry, Licensing Services Manager
General Electric Company
Chairman, DeWitt County Board
State Liaison Officer
Chairman, lllinois Commerce Commission
Distribution:
Docket File w/encls
Rill PRR w/encls
A. B. Beach, Rlli w/encls
PUBLIC lE-35 w/encls
SRIs, Clinton,
W. L. Axelson, Rlli w/encls
OC/LFDCB w/encls
Dresden, LaSalle,
Enf. Coordinator, Rlli w/encls
DRP w/encls
Quad Cities w/encls
CAA1 w/encls
DRS w/encls
LPM, NRR w/encls
DOCUMENT NAME: G:DRS\\CLl97002.DRS
(SEE PREVIOUS CONCURRENCE)
To receive a copy of this document, indicate in the box: "C" = Copy without
l
attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy
,
OFFICE
Rlli
Rlll
Rlli
Rlll
RIKpf)
NAME
JFoster:jp
JCreed
GWright
MLeach/GGranWldWell
'
DATE
03/ /97
03/ /97
03/ /97
03/ /97
]O3/ Q/97
OFFICIAL RECORD COPY
l
.-
._ _
.- --
=-
_
. _._
-
- - - _
- .
. - . .
. _ . = -
l
l
-
W. Connell
-2-
.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter,
the enclosure (s), and your response (s) to this letter will be placed in the NRC Public
l
Document Room.
Sincerely,
l
l
[
James L. Caldwell, Director
l
Division of Reactor Projects
Docket No. 50-461
License No. NPF 62
Enclosures:
'
2. Inspection Report 50-461/97002(DRS)
cc w/encts:
P. Yocum, Plant Manager,
Clinton Power Station
R. Phares, Manager - Nuclear Assessment
P. J. Telthorst, Director - Licensing
i
Nathan Schloss, Economist,
Office of the Attorney General
K. K. Berry, Licensing Services Manager
General Electric Company
Chairman, DeWitt County Board
State Liaison Officer
Chairman, lilinois Commerce Commission
Distribution:
Docket File w/encls
Rlll PRR w/encls
A. B. Beach, Rlll w/encls
PUBLIC IE-35 w/encls
SRis, Clinton,
W. L. Axelson, Rllt w/encls
OC/LFDCB w/encls
Dresden, LaSalle,
Enf. Coordinator, Rlll w/encls
DRP w/encls
Quad Cities w/encls
CAA1 w/encls
DRS w/encls
LPM, NRR w/encls
DOCUMENT NAME: G:DRS\\CLl97002.DRS
To receive a copy of this document, Indicate in the box: "C" = Copy without
attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy
OFFICE
Rill
( Rlli_39,
J
Rill
)
Rlli
my [a Rill
l
NAME
JFoster:Jp M JCrhW4 GWrigh(qf
MLeach/GGrant JCaldwell l
DATE
O2p_7/97
02 O//97 /
02/%/97
03/4,/97
02/ /97
l
,
l
OFFICIA4. RECORD COPY
. . .