ML20147E339
| ML20147E339 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 02/10/1997 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Dugger C ENTERGY OPERATIONS, INC. |
| References | |
| NUDOCS 9702180308 | |
| Download: ML20147E339 (3) | |
Text
)
i p # "0%g-UNITED STATE $
t A
NUCLEAR REGULATORY COMMISSION i
REGION IV f
hb.}'
611 RYAN PLAZA DRIVE, SusTE 400
%,', /*
AR LINGTON, T E XAS 76011 8064 FE i 0 c.
l i
Charles M.'Dugger, Vice President Operations - Waterford 3 l
Entergy Operations, Inc.
l P.O. Box B Killona, Louisiana 70066
SUBJECT:
GENERIC FUNDAMENTALS SECTION OF THE WRITTEN OPERATOR LICENSING EXAMINATION l
t
Dear Mr. Dugger:
The NRC plans to administer a Generic Fundamentals Examination Section (GFES) of the written operator licensing examination at your facility on April 9, l
1997. The GFES will consist of 100 questions. The maximum time allowed to complete the examination is 2-1/2 hours and the passing score will be l
80 percent.
i i
In order to nominate candidates, an authorized representative from your facility must submit a letter listing the names of candidates for the l
examination to the appropriate NRC Regional Administrator and to the Chief, Operator Licensing Branch. The letter must be received both in the Region and at NRC Headquarters by March 6,1997, in order to allow us to assign docket numbers to the candidates and to make preparations for shipping the examin6tions to you for administration. The letter must certify that the candidates will have completed their fundamentals training by the date of the examination and are enrolled in your training program leading to an NRC operator or senior operator license. The letter must also list the names of personnel you will be using to proctor the examination and the address to which the examinations should be sent. A sample registration letter is enclosed.
The address for the Operator Licensing Branch Chief is as follows:
Stuart A. Richards, Chief Operator Licensing Branch U.S. Nuclear Regulatory Commission l
MS OWFN 9-D-24 Washington, DC 20555 l
D Approximately 2 weeks prior to the examination administration date, your designated facility contact will be sent a letter delineating examination particulars (i.e., proctor responsibilities, student I.D. numbers, etc.)
Sincerely, Thomas P. Gwynn, Director Division of Reactor Safety j
9702190308 970210 PDR ADOCK 05000382 V
g Entergy Operations, Inc. Cocket:
50-382 License: NPF-38
Enclosure:
As stated cc w/ enclosure:
Jay O'Hern, Training Manager Entergy Operations, Inc.
P.O. Box B Killona, LA 70066 i
1 I
l
=_
1 i
[
Cntergy Operations, Inc..bec to DCB (IE42) t bec distribution by RIV:
DRP Branch Chief 4
Resident Inspector
)
C. Patel, NRR (0WFN 13-H-3)
Leah Tremper, OC/DAF/LFARB (TWFN 9-E-10) j RIV file L. Miller, TTC L. J. Callan, RA l
L. A. Hurley, GFES file l
i i
i l
1 l
l i
i i
DOCUMENT NAME:
GFESI To secoNo copy of docudent,indmoto in boc V = Copy without enclosures T = Copy with enclosures W = No copy RIV:OB:LA f4/
l N C:0B DrDRS JM l
LAHurley M G JLPellet M TPGwynn M,
02//a /97 '
02/le/97 r 02/f,/977g
/ /97 0FFICIAL RECORD COPY 180039
\\o J