ML20147E052

From kanterella
Jump to navigation Jump to search
Discusses NRC Plans to Administer Gfes of Written Operator Licensing Exam on 970409 & Candidate Nomination Process
ML20147E052
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 02/10/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hagan J
ENTERGY OPERATIONS, INC.
References
NUDOCS 9702180176
Download: ML20147E052 (3)


Text

. _ _- _m . - _ . __ _- . _ _ . -

I

)'

5 6" "' % UNITED STAVES l

/ t NUCLEAR REGULATORY COMMISSION l

[ ) ' "' $ REoioN iv i 611 RYAN PLAZA ORIVE, SUITE 400

%9 , AR LlNGTON, T E XAS 76011-8064 FEB lO G97 I Joseph J. Hagan, Vice President '

Operations - Grand Gulf Nuclear Station Entergy Operations, Inc. i P.O. Box 756 i Port Gibson, Mississippi 39150  ;

SUBJECT:

GENERIC FUNDAMENTALS SECTION OF THE WRITTEN OPERATOR LICENSING E) WINATION

Dear Mr. Hagan:

The NRC plans to administer a Generic Fundamentals Examination Section (GFES) of the written operator licensing examination at your facility on April 9, 1997. The GFES will consist of 100 questions. The maximum time allowed to i complete the examination is 2-1/2 hours and the passing score will be .

80 percent.

j In order to nominate candidates, an authorized representative from your i facility must submit a letter listing the names of candidates for the examination to the appropriate NRC Regional Administrator and to the Chief, '

l Operator Licensing Branch. The letter must be received both in the Region and at NRC Headquarters by March 6,1997, in order to allow us to assign docket i numbers to the candidates and to make preparations for shipping the 4

examinations to you for administration. The letter must certify that the -

candidates will have completed their fundamentals training by the date of the
examination and are enrolled in your training program leading to an NRC operator or senior operator license. The letter must also list the names of personnel you will be using to proctor the examination and the address to which the examinations should be sent. A sample registration letter is enclosed.

The address for the Operator Licensing Branch Chief is as follows:

l Stuart A. Richards, Chief Operator Licensing Branch U.S. Nuclear Regulatory Commission MS OWFN 9-D-24

, Washington, DC 20555 Approximately 2 weeks prior to the examination administration date, your  ;

designated facility contact will be sent a letter delineating examination particulars (i.e., proctor responsibilities, student 1.D. numbers, etc.)

3 Sincerely, 6

Thomas P. Gwynn, Director 9702180176 970210 PDR ADOCK 05000416 V PDR ,

Entergy Operations, Inc.  !

i Docket: 50-416 License: NPF-29

Enclosure:

As stated cc w/ enclosure:

Mike Shelley, Technical Coordinator Nuclear Training Entergy Operations, Inc.

P.O. Box 756 Port Gibsoni, MS 39150 l

)

I i

Entergy Operations, Inc.  !

bcc to DCB (IE42)  ;

bec distribution by RIV:

DRP Branch Chief  !

Resident Inspector  !

J. Donohew, NRR (0WFN 13-H-4) l Leah Tremper, OC/DAF/LFARB (TWFN 9-E-10)

RIV file L. Miller, TTC '

L. J. Callan, RA -

L. A. Hurley, GFES file i

I 1

i ' l

~

1

'i 4

)

l i- DOCUMENT NAME: GFES1 To vuoahe copy of cocument,indrugs in boc v - Copy without enclosures T = Copy with enclosures W* = No copy

'f RIV:0B:LA g / l N C:OB l _ a) D:DRS # l LAHurley J )r JLPellet M TPGwynn d f  ;

02/4)/97' 02/gp/97 F" 02/ /97 iP / /97 ,

0FFICIAL RECORD COPY 180041 s\?  !

h

(

- - - _ _- . . _ - _ . _ _ . _