'o l

OPERATIPG IWTh REPORT DOCKET No. 50-348 tmTE ~1'/6/88 CQtPTETED BY J. D. Woodard 171EPHCNE "(2051899-5156 OPEPATING STAIUS NoEes

1. Unit Name:

Joseph M. Farley - Unit 1

2. Reporting Period:

DEcen6er 1967

1) Cumulative data since g
3. Licensed Thermal ' Power (tnt):

2,652 12-1-77, date of

4. Nameplate Rating (Gross tHe):

860 commercial operation

5. Design Electrical Rating (Net MWe):

829

6. tbximum Dependable Capacity (Gross iRel:

8 56.0

7. Maximum Dependable Capacity (Net FMe): - 825.1
8. If Changes Occur in Capacity Ratings (Items Number 3 '1htough 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted, If Any (Net FMe):,

N/A

10. Reasons For Restrictions, If Any:

N/A This Mcmth Yr-to-Date Cumulative

31. Hours In Reporting Period 744 8,760 88 392
12. Number Of Hours Reactor Was Critical 541~.T-B,30E7-65,116 T
13. Reactor Reserve Shutdcun Hours 00-T U-3,65U T
14. Hours Generator On-Line 4 99'. B ~~

8,203 T

~63,82W.5-

15. Unit Reserve Shutdcun Hours 0!D

~ 0:0-0.T

16. Gross '1herma1 Energy Generated (rMH)

I-235769T~-

71~095!65I I'62 W 33 I9 -

~3

17. Gross Electrical Energy Generated (fMH) 39F,55T 6,80T,494- ~5E16TT38-
19. Unit Service Factor 67 T

-~674a 4,862"- ~49',169~,196-~

18. Net Electrical Energy Generated (MWH)

~ 36F,32U -~

93'.T 72.2

20. Unit Availability Factor 6T.~2-93.T 72 ~. 2-
22. Unit Capacity Factor (Using DER Net) 59~. 9~

69.T 69il"

21. Unit capacity Factor (Using MDC Net; 6DT2~

88 ~.T

~ -~67.1-

23. thit Forced Outage Rate

?2:8-

~3.B' 9.T

24. Shutdowns Scheduled CNet Next 6 Months (Type, Date, and DuratioiiTEach):

Refueling / Maintenance Outage, March 1988, approximately seven weeks

25. If Shut Dcun At End Of Peport Period, Estimated Date of Startup:-

N/A

26. Units In Test Status ( Prior to Commercial Operation):

Forecast AchievecT---

INITIAL CRITICAr.11Y 08/06/77 08/09/77 INITIAL Ef>ITRICITY 08/ _20/_77 0_8/18/77 COMMERCIAL OPEFATION 124)l/77 12/01/77 Form 2/34

$g,4lI 0801200364 871231 i

PDR ADOCK 05000348 R

DCD

DOCKET No. 50-348 UNIT 1

DATE January 6,1988 COMPLETED BY J. D. Woodard ELEPHONE (205)899-5156 MONTH December DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (PMe-Net)

(PMe-Net) 1 819 17 63 2

820 18 213 3

819 19 416 4

818 20 790 5

821 21 815 6

819 22 819 7

237 23 821 8

0 24 816 9

0 25 812 10 0

26 811 11 0

27 812 12 0

28 814 13 0

29 823 14 0

30 817 15 0

31 820 16 0

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Conpute to the nearest whole megawatt.

Form 13/21

.m

.__.m_

__._.m_

m

...m 1

l j

.J> a i

UNIT SMUTDOWNS AND Pout 2 E. EDUCTIONS DOCKET NO.54-348 UNIT MAME J.

M.

FARLEY - tTKIT 1 DATE JANUART 6, 1948 COMPLETED RT J.

D. WOOOARD REPORT MONTN DECEMBER TELEPHONE I205)a99-5156 I

l l

l l

l l METHOD or j LICENSEE l l

l CAUSE & CORPECT!vE l

j j

l l

l DURATION l l SMUTTING l EVENT l SYSTEM l COMPOWENT l

ACTION TO l

j jNO.

l DATE j TYPE l (MOURS) l REASON l DOWN REACTOR l REPORT 4 l CODE l CODE l

PREVENT RECURRENCE l

l 1

1 I

I I

I I

I I

I l'

I l 012 l 871207 l r l

244,2 l

D l

1 l N/A l ED l CON l The unit was shut down to re-terminate the reactor l l

l l

l l

l l

l l

l l vessel head vont valves in accordance with l

l l

l l

l l

l l

l l approved environmental qualificaties (EQ) l l

l l

l l

l l

l l

l design. In addition, designated instrument l

l l

l l

l l

l l

l l splices and connections at terminal blocks ins &de l l

l l

l l

l l

l l

l containment were replaced with environeestally l

4 l

l l

l l

l l

l l

l qualified splices to prevent erroneous instrument l

)

l 1

l l

l l

l l

l l readings resulting from increased leakage l

l l

l l

l l

l l

l l currents during accident conditions.

l j

i l

1 1

1 1

I I

I I

I i

I I

I I

I I

i i

I I

I I

I I

I I

I I

i l

i I

i l

i I

i I

I i

I I

I I

I I

I I

I I

I I

I l

1 i

l i

I I

i 1

1 I

I I

I i

i i

i l

i i

i i

i 1

1 I

I I

I I

I I

I 1

1 I

I i

l I

i l

4 i

i i

i i

l i

i i

i l

i I

I r: Forced Reason:

Mothed:

Exhibit G-Instructions l

Ss Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data l

B-Maintenance or Test 2-Mesual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Emplain) 0161)

E-Operator Training E License Examination F-Adataistrative Exhibit 1 -Same Source G-operation't Error (Emplain) l (9/77)

M-Other (Emplain) i

.m =

. ~ - -, _,. _,,,,,. -

,,-..m.rr, m..,,,,_-_,-- ~,

,..---.m.,_.

-. -.. - =,

.--,.,.....,,. ~, _,_,

e t

JOSEMI M. FARLEY NtX1 EAR PIMP UNIT 1 NARRATIVE SlM4ARY OF OPHIATIONS December, 1987 During the month of December, there was one unit shutdown which occurred on I

December 7 when the unit was removed from service to re-teminate the' reactor vessel head vent valves in acconiance with approved environmental qualification (EQ) design.

In addition, designated instrument splices and.

connections at teminal blocks inside containment were replaced with environmentally qualified splices to prevent erroneoas instrment readings resulting from increased leakage currents during accident conditions. We unit returned to power operation on December 17.

We following major safety-related maintenance was perforined in the month of December:

1. De program of inspecting electrical splices that were installed

{

utilizing methods not evaluated by design for EQ continued. Rese splices were re-teminated in accortlance with an approved environmentally qualified design on a priority basis.

2. D e reactor vessel head vent valves were re-terminated, Environmentally Qualified instrument splices were made in instrument junction boxes, and connections at terininal blocks inside containment were replaced with environmentally qualified splices in several Ba j

electrical penetrations.

3. Weep hole modifications were performed on designated electrical junction boxes.

l

4. An oil leak was reymired on the 10 reactor coolant p ep.

i

5. Miscellaneous corrective and preventive maintenance was perforined on the diesel generators.

i 4

i 1

t

OPERATIN3 In1h REPORT DOCKET No. 50-348 twrt V 788 CGEPtKTED BY J. D. Woodard 11llLEPHONE --(205TB99;5156 OPEPATING 8th1US

~T40tes

1. thit Name:

Joseph M. Parley - Unit 1

2. Peporting Period:

Dec tr6eE'I90

1) Cuaulative data since

~

3. Licensed thermal ' Power (TMt):

2,652 12-1-77, date of

4. Nameplate Rating (Gross PHe):

860 conenercial operation

5. Design Electrical Rating (Net PMe):

B29

6. Maximum Dependable Capacity (Gross MWe):

856.0

7. Maximtn Dependable Capacity (Net PMe):

875 ~.1

8. If Changes Occur in Capacity Ratings (Items Ntrnber 31hrough 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted, If Any (Net PMe) _

N/A

10. Reasons For Restrictions, If Any N/A This Rmth Yr-to-Date Cumlative 760 88 392 8,307.T 65,~216 T
11. Hours In Reporting Period 744 3

B,

12. Number Of Hours Reactor Was Critical 541.9 __
13. Reactor Reserve Shutdoen Hours 0.0 0.0 33,,_650.0 3
14. Hours Generator On-Line 499.3 -

8,2D3 T 875 7

15. thit Reserve Shutdoan Hours 0 D' O.D~

0.0

~

16. Gross 1hermal Energy Generated (PWH) r,235,T97--

a71 095!651 162,423,319 6 BOT 494 E6TT3B 7 90)554 3Na d83'2--- ' 39',13d 196

17. Gross Electrical Energy Generated (PMi) 7 69 20 -
18. Net Electrical Energy Generated (tWH)
19. thit Service Factor 67T 93.6 72.2
20. thit Availability Factor 67T 93 T 72 7
21. thit Capacity Factor (Using POC Net) 60.2 89.T 69 T
22. thit Capacity ractor (Using DER Net)
59. 9' '-

B8 T 67.T

23. th!t Forced Outage Rate 32.8 33' 9T
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling / Maintenance Outage, March 1988, approximately seven weeks.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. thits In Test Status (Prior to Congnercial Operation):

Forecast Achieved INITIAL CRITICN.I1Y 08A6/77 08/09/77 INITIAL EIACIRIC11Y 08/20/77 08/18/77 COMMERCIAL OPEPATICri 12A1/77 12/01/77 Form 2/34

l*.

DOCKET NO.

50-348 UNIT 1

DATE January 6, 1988 COMPLETED BY J. D. Woodard

'IELEPHONE (205)899-5156 MONIH December DAY AVERAGE DAILY POWER LEVEL MY AVERAGE DAILY POWER LEVEL (tWe-Net)

(!We-Net) 1 819 17 63 2

820 18 213 3

819 19 416 4

818 20 790 5

821 21 815 6

819 22 819 7

237 23 821 8

0 24 816 9

0 25 812 10 0

26 811 11 0

27 812 12 0

28 814 13 0

29 823 14 0

30 817 15 0

31 820 16 0

INS 11t0CTIONS On this format, list the average daily unit power level in PWe-Net for each day in the reporting month. Conpute to the nearest whole megawatt.

Form 13/21 i

m I

UWrf SNUTDouRS AND PoutR mEDUCrIONS DoCRET Wo.54-348 NTT MANE J.

M.

FAmLEY - UNIT 1 DATE JANUAmr 6, 1988 COnrLETED St J.

D. 1soo0AmD mEco=7 nonen oEcEn.Em m EPuont neslee,-sis 4 e

i I

i l

l l

l nETwoo or l r.rcEnsEE I I

I cAvSE s commEctrvE I

l I

I i DumArrow l 2 l snUnrmc 1 EvEnr l SiSTEn I co conEnr l

Aceron to 1

1.o.

I DATE t nrE I caounsi i MEA $on l oous mEAcTom' I mEromT e l co E' I cooE' I

rmEvEnr mEcummt.cE I

2 I

I I

I I

I I

I I

I I

l 012 l 871207 l r l

244.2 l

D l

1 l N/A l ED l cow l TLe unit ues shut dense to re-teresiaste the reactor l j

l l

l l

l l

l l

l vessel head went valves in accordance with l

l l

l l

l l

l l

l l approved environmental qualificaties (80) l l

l l

l l

l l

l l

l design. In ac.dition, designated instrummet l

l l

l l

l l

l l

l l splices and connections at terminal blocks inside j l

l l

l l

l l

l l

l containment were replaced with environometally l

l l

l l

l l

l l

l l qualified splices to prevent erroneous imetrument l j

l l

l l

l l

l l

l readings resulting from increased leakage l

l l

l l

]

l l

l l

l currents during accident conditions.

l l

l 1

1 1

I I

I I

I I

i I

I i

i i

1 I

i i

i l

i I

I I

I I

i 1

1 I

I I

I I

I i

i I

l I

I I

I I

i i

l i

i i

i i

1 1

1 1

I I

I i

l I

I i

i I

i i

i i

i i

l i

i i

i l

i 1

1 I

I I

I i

I l'

I i

i l

I i

i i

i i

I I

i l

I I

i i

'nethed:

Eahibit G-tastructions r: Forced messen:

S: Scheduled A-Equipment rallure (Emplain) 1-Manual for Preparation of Data 3--Maintenance er Test 2-Manual Scram.

Entry Sheets for Licenseo C-mefueling 3-Automatic Scram.

Eveet mopert(12 9 rile (NumEG-D-Regulatory mestriction 4-other (Emplain) 0161)

E-operator Training & License Examination F-Administrative Enhibit 1 -Same Seurte G-operatiemal Error (Emplain)

(9/779 M-other (Emplaint

i.

Alabama Powst Con 4any 600 North 16th Strest Post office Bor 2641 Birmingham, Afabama 35291-0400 Telephone 205 2501835 R.P.McDond Alabama POWCf Senior Vice President the sottherrt eW.ttsc systern January 14, 1988 Docket No. 50-348 U. S. Nuclear Regulatory Cosnission ATIN: Document Control Desk Washington, D. C.

20555 Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the December 1987 Monthly operating Report for Joseph M. Farley Nuclear Plant Unit 1, required by Section 6.9.1.10 of the Technical specifications.

If you have any questions, please advise.

Yours very truly, ld./. //Am=

.s" R. P. Mcdonald F.PlyJGSimab/1.6 Attachments xc Dr. J. N. Grace 1

e ifl

4 J

.F JOSEMI M. FARLEY NUCLFAR PLANT UNIT 1 NARRATIVE SLtMARY OF OPEIMTIONS December, 1987 During the month of December, there was one unit shutde m which occurred on December 7 when the unit was removed from service to re-teminate the reactor vessel head vent valves in acconlance with approved environments.1 qualification (EQ) design.

In addition, designated instrument splices a.vi connxtions as teminal blocks inside containment were replaced with environmentally qualified splices to prevent erroneous instrument readings resulting from increased leakage currents during accident conditions. The unit returrel to power operation on December 17.

The following mjor safety-related maintenance was perfomed in the month of December:

1. The program of inspecting electrical splices that wera installed utilizing methods not evaluated by design for EQ con unued. These splices were re-terminated in accordance with an approved environmentally qualified design on a priority basis.
2. %e reactor vessel head vent valves were re-teminated, Environmentally Qualified instrument splices were made in instrument junction boxes, and connections at terminal blocks inside containment were replaced with envirorur,entally qualified splices in several EQ electrical penetrations.
3. Weep hole modifications were perfomed on designated electrical junction boxes.
1. An oil leak was repaired on the 1C reactor coolant pump.
5. Miscellaneous corrective and preventive maintenance was perfomed on the diesel generators.

1

,