MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station ML20148K4161997-05-31031 May 1997 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20141B9631997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Pilgrim Nuclear Power Station ML20137T5631997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Pilgrim Nuclear Power Station ML20136G7791997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Pilgrim Nuclear Power Station ML20138K5811997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Pilgrim Nuclear Power Station ML20133G5831996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Pilgrim Nuclear Power Station BECO-96-106, Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-097, Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station ML20128N2611996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-083, Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr1996-08-31031 August 1996 Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr ML20116L0841996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-066, Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-056, Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station ML20117E0961996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-034, Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-023, Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-008, Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-004, Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station ML20095E7351995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Pilgrim Nuclear Power Station Unit 1 BECO-LTR-95-116, Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station ML20093F5221995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-097, Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-081, Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-071, Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant1995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20212C2921999-09-16016 September 1999 SER Accepting Licensee Request for Relief from ASME Code Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Pilgrim Nuclear Power Station ML20216F3511999-09-0808 September 1999 ISI Summary Rept for Refuel Outage 12 at Pnps ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209C4731999-07-0707 July 1999 Addendum to SE on Proposed Transfer of Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generation Co ML20209H8251999-07-0101 July 1999 Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20196H2451999-06-29029 June 1999 SER Denying Licensee Proposed Alternative in Relief Request PRR-13,rev 2.Staff Determined That Proposed Alternative Provides Insufficient Info to Determine Adequacy of Scope of Implementation ML20209A8901999-06-28028 June 1999 SER Accepting Licensee Proposed Alternative to Use Code Case N-573 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209B9861999-06-23023 June 1999 Rev 13A to Pilgrim Nuclear Power Station COLR for Cycle 13 ML20217N9061999-06-21021 June 1999 Rept of Changes,Tests & Experiments for Period of 970422-990621 ML20195K3431999-06-15015 June 1999 Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water System Piping for Plant ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20207E7471999-05-27027 May 1999 Safety Evaluation Granting Request Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of HWC to License DPR-35 ML20206M1971999-05-11011 May 1999 SER Accepting Request for Approval to Repair Flaws in ASME Code Class 3 Salt Svc Water Piping at Plant ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207J5471999-03-0909 March 1999 Training Simulator,1999 4-Yr Certification Rept ML20207F9401999-03-0101 March 1999 Long Term Program Semi-Annual Rept for Pilgrim Nuclear Power Station ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20196E2151998-12-31031 December 1998 1998 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20153D3901998-09-22022 September 1998 Safety Evaluation Granting 970707 Request to Use Guidance in GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Pilgrim Nuclear Power Station ML20197C5011998-09-0404 September 1998 Rev 12C,Pages 4 & 5 to Pilgrim Nuclear Power Station Colr ML20197C5471998-08-31031 August 1998 Rev 12C to Pilgrim Nuclear Power Station Colr ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237E2251998-08-26026 August 1998 Suppl & Revs to SE for Amend 173 for Pigrim Nuclear Power Station ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236U8201998-07-13013 July 1998 Rev 12B to Pilgrim Nuclear Power Station COLR (Cycle 12) ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20207B7601998-03-31031 March 1998 Final Rept, Pilgrim Nuclear Power Station Site-Specific Offsite Radiological Emergency Preparedenss Prompt Alert & Notification System Quality Assurance Verification, Prepared for FEMA ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20216J3741998-03-19019 March 1998 Safety Evaluation Accepting Licensee Request to Evaluate Elevated Tailpipe Temp on Safety Relief Valve SRV 203-3B ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20236M8511997-12-31031 December 1997 1997 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station ML20202D5761997-11-0808 November 1997 1997 Evaluated Exercise BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217D6431997-10-0101 October 1997 Safety Evaluation Granting Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Class 3 SSW Piping for Pilgrim ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station 1999-09-08
[Table view] |
Text
a. .
o ., .,
..q L,)
, s
. OPERATING DATA REPORT DOCKET NO.
50-293 I DATE "/11/ # !
C051PLETED 11Y C. Gaffney l TELEPn0NE 617-.746-7900 l l
OPERATING STATUS ;
PILGRIM I ! Notes
- 1. Unit Name:
nuvumt.n, 1978 l
- 2. Reporting Period: ;
- 3. Licensed Thermal Power (.\lWt): 1998.
l
- 4. Nameplate Rating (Gross SlWe): 678 1
- 5. Design Electr! cal Rating (Net 51We): 655* '
- 6. 31aximum Dependabic Capacity (Gross .\lWe):
690*
- 7. Staximum Dependable Capacity (Net 51We): 670
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
NONE l l
- 9. Power Level To Which Restricted,if Any (Net 51We): NONE
- 10. Reasons For Restrictions. !f Any:
NONE
'I This Stonth Yr..t o.Da t e Cumula th e
- 11. !!ours in Reporting Pen.od 720*0 8016.0 52392.0
- 12. Number Of Hours Reactor Was Critical 720.0 6647.0 36303.7
- 13. Reactor Reserve Shutdo vn flours 0.0 0.0 0.0
- 14. Honts Generator On.Line 720.0 65Jb.6 .sv76.6
- 15. Unit Reserve Shutdown liours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated p!WH) 1404840.0 11857536.0 57009768.0
- 17. Gross Electrical Energy Generated (.\lWH) 478790.0 ,
4059710.0 18639244.0
- 18. Net Electrical Energy Generated (.\lWH) 460473.0 3904083.0 17888981.0
- 19. Unit Service Factor 100.0 61.3 bo.6 ~
- 20. Unit Availability Factor 100.0 81.5 66.8 ,
- 21. Unit Capacitp Factor (thing StDC Net) 95.5 72.7 51.0
- 22. Unit Capacity Factor (thing DER Net) 97.6 74.4 52.1
- 23. Unit Forced Outage Rate 0.0 9.0 10.9
- 24. Shutdowns Scheduled Over Nest 6 Stunths(Type. Date,and Duration of Each):
- 25. If Shut Ibwn At End OfIteport Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): , Forecast Achieved INI T I A L CCITICA LITY INITI A1. ELEC TRICITY CO.sl.\lERCIAL OPER AT!ON 781220m %
(n/77) ms - -v ,. - ..... _ . . .. , , .__ ,_
e; ..
AVER AGE DAILY UNIT POWEll LEVEL DOCl:ET NO. 50-293 UNIT PILGRIM I DATE 12/11/78 COMPLETED BY C. GAFFNEY TELEP!!ONE 617-746-7900 MONTil DAY AVER AGE D \ll VER LEVEL DAY AVER AGE DAILY POWER LEVEL tMWe Net) g 645, 653, 17 2 664 ,g 653, 3
659 654, 4
625 654 5 655, 653, 21 6 656 ,, 653 7 654. 653
)
3 8 653 ,4 654 l 654.
9 655 25 10 654 656 ,
j; 655 657.
12 383. 33
~
656
]
13 582 656 j ,; 580 656 15 31 N.A.
16 (AA INSIT!UC~ 'NS On this ft -
the netage 12:13 unit pow.:r leselin MWe Net for ecch day in the reportine m.inth. Compute to the nearru whole m p,utt, - -
l l
t.
(
i W
\ n ,
s U 50 293 -
UNITStiUTDOWNS AND POWER REDUCTIONS U' .E PILGRIM 1 l . DATE 12/11/78 REFC.".T MONTII COMPLETED BY C _ CAFFNEY 7.du r;IONE 617 -746-7900
=_ en :n 5
.2 e : ,'3 .g X .
Licensee N. . Date
., g t, g9, Cause & Currectire 3 ,g 3 j55 Event 9 ~2 9. ~$ Acnon to
s; q
Report ; tE C u
EU Present Recurrence o
18 11/12/78 s 0.0 B 4. Reduction for maintenance and backwashiv main condenser i
I 2 3 4 F: Fun ed Reason: Mettu>d:
S. S heduleil Exhibit G - Instsuctions A-Equipinent Failure (Explain) l-Man ual for Pieparation of Data Bataintenance of Test 2 Manual Scram. Entry 5heets for Licensee C-Refuchng 3-Automatic Scram. Event Report (i ERs File t NtlREG-D Rcgubtory Restriction 4-Ot her (lixplain)
I:. Opt rato: Training & License Exa nination -
F-Adudnistrati.e 5 G-Operational Lirut ( Explain) Exhibii ! - Same Source
. (9/77) 11 Other (E xplain) e
i1l .li ! l
.ll 1!l , j L
.in I
8 A.
7 C N 9 O 1 S S
, .n R
E B . j M E.
E G V
O m N o r r N' f h
t Ow Ie s .
n Tn k r
o Cn o M Ai w m ,
Er p Vo o I t T--
Cy w Er e Rr n Rn Oo g Cn n i
_ s m
a h
c r
u P
N C O N I A E T N C
A E Ni T T ! t l
_ S N N i I E R A T u E M N b W I e O D A R .
P E M .
T R A A L E E L R d J C e U Y r N T o E c .
M F E s I A S t I
R S U G A a b L R C e I O S h P J M l N
O I e g
T C a N k U a .
F e -._
L L
/s t M o l
i P
l e
T v N l a
E V N
_ C f
? e2 3' i C lN.
C e/
RS i
l l M
E ~ 1
S l)
T l ! !1! !
.. _ __ . . . .~ .- . -. . - . . . . ~ - . . - - - .
REFUELING INFORMATION i The following refueling information is included in the Monthly Report as i
requested in a letter to Mr. G. C. Andognini dated January 18, 1978 For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.
- 1. - The name of this facility is Pilgrim Nuclear Power Station, Docket l No. 50-293 2 Scheduled date for next Refueling Shutdown: January, 1980 3 Scheduled date for restart following refueling: April, 1980 I
4 :
i 1
5 Due to their similarity, requests 4, 5 & 6 are responded to col- .i lectively:
6 The fuel,'which is presently expected to be loaded during the next scheduled shutdown, may be reload fuel of a new design and may there-fore require.a proposed license submittal and technical specification changes. It is not possible, however, to supply pertinent information on dates. As information concerning fuel design, core configuration, Operational Review Committee determinations, proposed licensing l action, and technical specification submittals becomes available, it will be forwarded to you.
7 (a) There are 580 fuel assemblies in the core.
(b) There are 580 fuel assemblies in the spent fuel pool.
8 (a) The station is presently licensed to store 2320 spent fuel assemblies. .The actual spent fuel storage capacity is 830 fuel assemblies. This reduction in capacity from last month-resulted from removing old storage racks to make room for the new type.
(b) The planned spent fuel storage capacity is 2320 fuel assemblies.
9 With present fuel storage ' capacity, the spent fuel pool does not have the capacity to accommodate an additional 580 fuel assemblies.
l
)
l l
l
=- .
BOSTON EDISON COMPANY PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293
SUMMARY
OF OPERATIONS FOR NOVEMBER, 1978 On November 1, 1978 PNPS was operating at approximately 100% reactor power and continued at this level until November 4 On November 4, power was reduced to 50% for approximately four hours to change brushes on "A" recircu-lation M-G set. Reactor power was returned to 100% at 2125 hours0.0246 days <br />0.59 hours <br />0.00351 weeks <br />8.085625e-4 months <br /> on November 4 and continued at this level until November 11 On November 12, reactor power was reduced to 40% to repair seal cooler leak on "A" reactor feed pump and backwash the main condenser. Af ter completion of maintenance, reactor power was increased in accordance with station PC10FRs.
On November 13 with reactor power at approximately - 93%, the seal on "B" reactor feed pump blew. Power was reduced to 80% to repair the blown seal.
Af ter seal repairs were completed, power was increased to 100% and remained at 100% for the remainder of the month.
,