ML20147D050
| ML20147D050 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 02/23/1988 |
| From: | Perkins K Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20147D055 | List: |
| References | |
| NUDOCS 8803030220 | |
| Download: ML20147D050 (4) | |
Text
.
- paWeg'o,,
UNITED STATES 8"
NUCLEAR REGULATORY COMMISSION
~
g 5
E WASHINGTON, D. C. 20555 IOWA ELECTRIC LIGHT AND POWER COMPANY CENTRAL IOWA POWER COOPERATIVE CORN BELT POWER COOPERATIVE DOCKET N0. 50-331 DUANE ARNOLD ENERGY CENTER AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.149 License No. OPR-49 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Iowa Electric Light and Power Company, et al, dated August 31, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such actlvities will be conducted in comp 1'iance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. DPR-49 is hereby amended to read as follows:
8803030220 880223 PDR ADOCK 050 1
I P
i
\\
l Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.149, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
The license amendnent is effective as of the date of issuance and shall be implemented within 30 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION 1
. _...TN.h 'h d:t Kenneth E. Perkins, Director Project Directorate III-3 Division of Reactor Projects - 111, IV, Y and Special Projects
Attachment:
Changes to the Technical Specifications Date of Issuance:
February 23, 1988
_~ -
ATTACHMENT TO LICENSE AMEN 0 MENT NO. 149 FACILITY OPERATING LICENSE.NO. OPR-49 DOCKET NO. 50-331 Replace the following.page of the Appendix A Technical Specifications with the enclosed page.
The revised area is. indicated by a marginal line.
2 i
h I
i 4
1 0
4 DAEC-1 LIMITING CONDITION FOR OPERATION SURVEILLANCE REQUIREMENT During the seniannual test the same checks to the air start system and fuel oil pumps performed during monthly testing shall be performed, in addition, the diesel starting time to reach rated frequency and voltage shall be logged, b.
Once per OPERATING CYCLE the condition under which the diesel-generator is required will be simulated' and a test conducted to demonstrate that it will Start and accept the emeroency load within the specified time sequence.
The diesel-generator shall be operated loaded for a minimum of 5 minutes. The results shall be logged.
c.
The quantity of diesel fuel available shall be logged monthly and after each use of the dies 315.
d.
Once a month a sample of diesel fuel shall be checked for viscosity, water and sediment.
The values for viscosity, water and sediment shall be within the acceptable limits specified in Table 1 of ASTM 99/5-77 and logged.
e.
ONCE PER OPERATING CYCli, during shutdown, each diesel-generator shall be given an insMction in accordance with instructions based on the manufacturer's recommendations, f.
A sample test and record shall be made of each oil delivery before it is placed in the storage tank.
2.
Unit Batteries a.
Every week the specific gravity, the voltage and temperature of tne pilot cell and overall battery voltace shall be measured and logged.
Amendment No. 53, 139, 143, 149 3.8-2