ML20147C983

From kanterella
Jump to navigation Jump to search
Final Deficiency Rept CP-87-119 Re Essential & Emergency Lighting Sys Supports.Deficiency Addressed in Previous Repts CP-85-34, Conduit Support Design & CP-87-119, Train C Conduit Supports, Therefore,Not Considered Separate
ML20147C983
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/11/1988
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-87-119, TXX-88075, NUDOCS 8801200025
Download: ML20147C983 (2)


Text

_

mesusamme

==

r9 Log # TXX-88075 2

C File # 10110 r

C 909.5 Ref. # ICCFR50.55(e) 7t# ELECTRIC U,DEhS5,"$.

January 11, 1988 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 ESSENTIAL AND EMERGENCY LIGHTING SUPPORTS SDAR:

CP-87-119 (FINAL REPORT)

Gentlemen:

On October 23, 1987 we notified your Mr. R. F. Warnick of an issue regarding the installation of AC essential lighting and DC emergency lighting systems supports which may be in conflict with the requirements set forth in the FSAR.

Our most recent interim report was logged TXX-6996, dated November 23, 1987.

Af ter further review of this issue we have determined this deficiency has been addressed in two previous 50ARs which were both deemed reportable under the provisions of 10CFR50.55(e).

Therefore, SDAR CP-87-119 is not considered a separate 10CFR50.55(e) deficiency.

SDARs CP-85-34, "Conduit Support Design," and CP-85-36, "Train 'C' Conduit Supports," encompass the concerns of the subject SDAR CP-87-119, and since you have been informed of the reportable status and corrective action required, we are closing SDAR CP-87-119.

This is our final report on 50AR CP-87-119.

Very truly yours, W. G. Counsil WJH/grr c-Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3) 8801200025 880111

~

6 PDR ADOCK 05000445

,5 DCD 400 hnh Olin Suret LB81 Dallas. Tew M01 lD