Notice of Issuance of Amend to License NPF-3 & Proposed NSHC Determination.Amend Revises Sections 3/4.7.10,6.4 & 6.9 & Bases 3/4.7.10 to Reflect Current Plant Design,Testing & Compensatory Measures
ML20147C362
Person / Time
Site: Davis Besse 
Issue date: 02/25/1988
From: De Agazio A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20147C333 List:
References
NUDOCS 8803030060
Download: ML20147C362 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _

7590-01 U.S. NUCLEAR REGULATORY COMMISSION TOLEDO EDISON COMPANY THE CLEVELAND ELECTRIC ILLUMINATING COMPANY DOCKET NO. 50-346 NOTICE OF ISSUANCE OF AMENOMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Comission (the Comission) has issued Amendment No.106 to Facility Operating License No. NPF-3, issued to Toledo Edison Company and The Cleveland Electric Illuminating Company (the licensees), which revised the Technical Specifications (TS's) for operation of the Davis-Besse Nuclear Power Station, Unit No.1 (the facility), located in Ottawa County, Ohio. The amendtrant is effective as of the date of issuance and is to be implemented not later than This amendment revises the TS Sections 3/4.7.10, 6.4, and 6.9, and Bases section 3/4.7.10 to update the TS's to reflect current plant design, testing, and compensatory measures relating to the fire protection features and programs at the facility.

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations. The Comission has made appropriate findings, as required by the Act and the Comission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendments Notice of Consideration of Issuance of Amendment and Opportunity for Prior Nearing in connection with this action was published in the Federal Register on December 16,1987(52FR47811).

No request for a hearing or petition to intervene was filed following this notice.

OOo[K 0000$$46 p

PDR

l

. lpublishedintheFede Also in connection with this action, the Comission prepared an Environmental Assessment and Finding of No Significant Impact which was 19,1988 at 53 FR 5061.

For further details with respect to this action, see (1) the application for amendment dated December 7,1987,(2) Amendment No. 106, to license No.

NPF-3, and (3) the Comission's related Safety Evaluation.

All of these items are available for public inspectio.1 at the Comission's Public Document Room,1717 H St. N. W., 'adshington, D. C. and at the University of Toledo Library, Documents Npartment, 2801 Bancrof t Avenue, Toledo, Ohio.

A copy of itens (2) n.c (3) may be obtained upon request addressed to the U. S.

Nuclear Regulatory Comission, Washington, D. C. 20555, Attention: Director, Division of Reactor Projects - III, IV, V, and Special Projects.

Dated at Bethesda, Maryland, this 25th day of February 1988.

FOR THE NUCLEAR REGULATORY COMMISSION Albert W. De Agazio, Project Managcr Project Directorate III-3 Division of Reactor Projects - III, IV, V & Special Projects

?