OPERATING DATA REPORT DOCKET NO.

50-443 DATE 01/11/88 COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 3116)

OPERATING STATUS 1.

Unit Name:

Seabrook Station Unit 1 2.

Reporting Period:

DECEMBER 1987 3.

Licensed Thermal Power (Mut):

3411 4.

Nameplate Rating (Cross MWe):

1197 5.

Design Electrical Rating (Net MWe):

1148 6.

Maximum Dependable Capacity (Cross MWe):

1197 (Initial design value) 7.

Maximum Dependable Capacity (Net MWe):

1148 (Initial design value) 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

Not Applicable 9.

Power Level To Which Restricted, If Any (Net MWe):

Zero power

10. Reasons For Restrictions, If Any:

License issued on 10/17/86 is a zero power license which allows fuel loading and performance of non-nuclear testing.

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 744.0 8760.0 10585.0
12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Cross Thermal Energy Generated (MWH) 0 0

0

17. Cross Elec. Energy Generated (MWH) 0 0

C

18. Net Electrical Energy Generated (MWH) 0 0

0

19. Unit Service Factor 0.0 0.0 0.0
20. Unit Availability Factor 0.0 0.0 0.0
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 0.0
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 0.0
23. Unit Forced Outage Rate 0.0 0.0 0.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Not Scheduled i

25. If Shut Down At End Of Report Period, Estimated Date Of Startup: Not Applicable
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITI AL CRITICALITY 1988 Not Applicable INITIAL ELECTRICITY 1988 Not Applicable COMMERCIAL OPERATION 1988 Not Applicable l

l i

1 of 5 i

15 8801290114 871231 g

PDR ADOCK 05000443

}

R DCD

AVERACE DAILY UNIT POWER LEVEL DOCKET NO.

50-443 UNIT Seabrook 1 DATE ~ 01/11/88 COMPLETED BY P.

Nardone TELEPHONE (603) 474-9521 (Ext. 3116)

MONTH DECEMBER, 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

16 0

2 0

17 0

3 0

18 0

4 0

19 0

5 o

20 0

6 0

21 0

7 0

22 0

8 0

23 0

9 0

24 0

10 0

25 0

11 0

26 0

12 0

27 0

13 0

28 0

14 0

29 0

15 0

30 0

31 0

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

2 of 5

DOCKET N00 50-443 UNIT SilUTDOUNS AND POWER REDUCTIONS UNIT NAME Seabrook I DATE 01/11/88 COMPLETED BY P.

Nardone REPORT MONTil DECEMBER, 1987 TELEPIIONE (603) 474-9521 (Ext. 3116)

No. Date Typel Dura t ion Reason 2 Method of Licensee Cause & Corrective (flours )

Shutting Event Action to Down Reactor 3 Report #

Prevent Recurrence NO ENTRIES FOR THIS MONTil 1

2 3

F:

Fo rced Reason:

Method:

S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued from E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction G-Operational Error (Explain)

(Duration = 0)

H-Other (Explain) 9-Other (Explain) 3 of 5

Docket No.

50-443 Date 01/11/88 Unit Name Seabrook 1 Completed By P. Nardone Telephone (603) '*74-9521 (Ext. 3116)

CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT Page 1 of 1 REPORT MONTH DECEMBER, 1987 DATE SYSTEM COMPONENT MAINTENANCE ACTION 12/01/87 Service Water SW-V-20 Overhauled butterfly valve to correct Train A ripped valve liner caused by valve disc Discharge Valve and spacer ring interference.

To Ocean 12/02/87 Safety Injection SI-V-93 Grease leaking by gasket on lower limit Train B switch assembly gear housing. Replaced SI Pump Recirc gasket, cleaned limit switch rotors and Valve To RWST contacts.

12/28/87 Diesel Generator DC-C-2B Faulty contact carrier assembly in<

Train B compressor starter. Replaced contact Diesel Generator carrier and contacts in assembly.

Starting Air Compressor 12/30/87 Diesel Generator Train B Noisy and intermittent power supply in Diesel Generator electronic controller for diesel governor.

Covernor Controller Replaced electronic controller.

4 of 5

l Docket No.

50-443 D te 01/11/88 Completed By:

P. Nardone Telephone:

(603) 474-9521 (Ext. 3116)

[

REFUEi.ING INFORMATION REQUEST I

i

1. Name of facility:

Seabrook Unit I-

?

4 2._ Scheduled date-for next refueling shutdown: Not Scheduled

3. Scheduled date for' restart following refueling:

Not Scheduled I

4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?

Unknown at this time.

5. Scheduled date(s) for submitting licensing action and supporting information:

Not Applicable

6. Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

None

7. The number of fuel assemblies (a) in the core and (b) in the spent j

fuel storage pool

[

i i -

(a) In Core:

193 (b) 0

8. The present licensed spent fuel pool storage capacity and the size of I

any increase in licensed storage capacity that has been requested or

[

is planned, in number of fuel assemblies:

l Present licensed capacity:

1236 l

No increase in storage capacity requested or planned.

i i

i

9. The projected date of the last refueling that can be discharged to l

the spent fuel pool assuming the present licensed capacity:

i i

a Licensed capacity of 1236 fuel assemblies based on sixteen j

refuelings and full core offload capability.

[

i The current licensed capacity is adequate until at least the l

year 2007.

l 5 of 5 I

l l

~

Q George S. Thomas Vice Proudent Nuclear Producten Putsc SeMee of New HampeNro Ptw Hampshire Yankee Division NYN-88003 January 11, 1988 United States Nuclear Regulatory Commission Washington, DC 20555 Attention:

Document Control Desk

Reference:

Facility Operating License No. NPF-56, Docket No. 50-443

Subject:

Monthly Operating Report Gentlemen:

In accordance with Technical Specification Section 6.8.1.5, enclosed please find Monthly Operating Report 87-12 covering the operation and shutdown experience relating to Seabrook Station Unit 1.

Very truly yours, Enclosure cc Regional Administrator U.S. Nuclear Regulatory Commission - Region I 631 Park Avenue King of Prussia, PA 19406 Mr. A. C. Cerne NRC Senior Resident Inspector Seabrook Station Seabrook, NH 03874 Y,}

P.O. Box 300. Seabrook, NH 03874. Telephone (603) 474 9574

_ _ _ _ _ _ _ _ _ _ _