Text
-
~. - ~. - -.
.... -.. ~
9-J
/ja ascg D
UNITFD ST ATES o
NUCLEAR REGULATORY COMMISSION j'
n 5-E' WASHINGTON,0.C 20555 o%,...../
January 23, 1997 OFFICE OF THE SECRETARY Mr. William S. Linnell II Cosimittee for a Safe Energy Future P.O. Box 4034 Portland, Maine 04101
Dear Mr. Linnell:
This is to confirm that the Commission has granted your request to participate in the Briefing on Maine Yankee scheduled for 9:30 a.m.,
Tuesday, February 4, 1997.
The briefing will be held in the Commission's Conference Room on the First Floor of our headquarters building at one White Flint North, Rockville, Maryland.
As Mr. William Hill of my staff has informed you, there is no i
limit on the written material you may wish to submit.
The time for your oral presentation, however, is limited to 5 minutes.
In for order to provide the Commission an opportunity to prepare your presentation, please send 10 copies of your written material, including any briefing visuals, to Mr. Hill by.
Thursday, January 30.
If you prefer, you may fax your material to Mr. Hill at (301) 415-1672.
We also require approximately 90 copies of your material on the day of the meeting for members of the public.
If you are unable to provide these copies, please advise us.
The Commission meeting facility has a sophisticated television graphics system.
For optimum use, we are enclosing guidelines for preparing your briefing visuals, if you plan to use any.
The system is unique, and you should follow the enclosed instructions closely.
Should you require additional information on the format for your viewgraphs, please contact us.
Normally we anticipate that a member of your party familiar with your presentation will be in our Audiovisual Room to display your visuals.
If this is i
not possible, one set of the text and visuals should be appropriately marked to indicate when you desire each visual to be displayed.
Your cooperation in this matter is requested so we can provide smooth coordination between your presentation and the l
graphics display.
Our office is located adjacent to the White Flint Metro Station at 11555 Rockville Pike and Marinelli Drive.
The White Flint Station is on the Red Line of the Washington area subway system.
There is The trip from Metro Center takes about 40 minutes.
/
reserved visitor parking for Commission guests in the building
[
n50128 9702050399 970123 h'W Nya)
PDR ADOCK 05000309 V
H PDR
(
i t
-2 Entrance is at the rear of the building.
Please check garage.
with the security staff at the entrance to the garage when youarrive.
If you plan to use reserved parking, please notify us in advance so that we can alert the security staff.
Sincerely,
/
[
Jo C. Hoy e cretary of the Commission
Enclosure:
As Stated I
. -.... - - - ~.-.
a r
i i
l GENERAL GUIDELINES FOR VIEWGRAPHS i
F Arrange all visuals in a 3 by 4 configuration (e.g., 3 units This will conform in the y-axis and 4 units in the x-axis).
1.
television monitors.
your visuals to the 3 by 4 t
to 13 lines vertical and 40 Limit your alphanumeric script 2.
characters horizontal per lines.
for titles and no less that BOLD j
Type sizes are BOLD 30-pointUse no less than BOLD 24-point for l
3.
for body text.
20-point if lower case letters are used.
body text i
Maximum image area of 6- (vertical) by 8-inch (horizontal) on
[
4.
8.5 x 11 sheet of paper.
may be helpful to number the viewgraphs.
5.
It i
i gaREGO f
i E
o s
,a e
\\ o/
ADVANCED REACTOR TECHNICAL ISSUES February 3,1995 l
Ashok C. Thadani i
Alan Levin I
i
AP-600 PASSIVE SYSTEM I
T/H RELIABILITY l
- Passive safety systems rely on natural forces, such as gravity and stored energy to perform their functions
- Such forces are relatively small compared to i
pumped systems; their magnitude vary from one i
scenario to another
- This requires assessment of the passive system T/H performance reliability 1
i
- Quantification of passive system T/H performance reliability is very difficult l
CORE SHROUD INSPECTIONS / REPAIRS l
Category B and C Plants i
25
-3 I
O Category B Category C l b-N 20-
~
.e l
$ 15-e E
l V
l e
10-i 5
W f
\\
s 5-i
.c l
E s
Z 0-Fall 93 Spr 94 Fall 94 Spr 95 Fall 95 Spr 96 l
i Date t
t l
-- --