ML20147B847

From kanterella
Jump to navigation Jump to search
NRC Staff Response to Licensing Board Order of 871127.* ASLB Should Rule That Issues Raised by Contentions I.V & IV Irrelevant to Safe Conduct of Low Power Operations.Nrr Should Issue Low Power License Per Findings
Date released: 06/09/2020 Download: ML20147B847


Affidavit of Hf Conrad.* Discusses Whether Contention I.V Raises Issues That Must Be Resolved Prior to Issuance of Low Power License.Operation of Plant at 5% Power Would Not Change Augmentation.Certificate of Svc Encl
ML20147B928
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 01/12/1988
From: Conrad H
Office of Nuclear Reactor Regulation
To:
References
Download: ML20147B928 (12)
Affidavit of MT Masnik.* Discusses Contention IV & Whether Issues Raised Must Be Resolved Prior to Reauthorization of Low Power Operations.Debris at Intake Structure Poses No Safety Hazard.Prof Qualifications Encl
ML20147B911
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 01/12/1988
From: Masnik M
Office of Nuclear Reactor Regulation
To:
References
Download: ML20147B911 (11)
Affidavit of N Wagner.* Discusses If Issues Requiring Resolution Raised by Contention Iv.Chlorination & Distribution Sys Designed to Permit Safe Operation of Plant at Either Full or Low Power.Related Info Encl
ML20147B893
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 01/12/1988
From: Wagner N
Office of Nuclear Reactor Regulation
To:
References
Download: ML20147B893 (7)
NRC Staff Response to Licensing Board Order of 871127.* ASLB Should Rule That Issues Raised by Contentions I.V & IV Irrelevant to Safe Conduct of Low Power Operations.Nrr Should Issue Low Power License Per Findings
ML20147B842
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 01/12/1988
From: Berry G
NRC OFFICE OF THE GENERAL COUNSEL (OGC)
To:
Atomic Safety and Licensing Board Panel
References
CON-#188-5336
Download: ML20147B842 (16)