ML20147B803
| ML20147B803 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 01/29/1997 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Leslie Liu IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT |
| Shared Package | |
| ML20147B808 | List: |
| References | |
| NUDOCS 9702030235 | |
| Download: ML20147B803 (2) | |
See also: IR 05000331/1996012
Text
- . . - - . . . - -
-.
. . - - . - - -
--
.
. . - - . . . . . - - -
. . -
. . . .
. . - .
(> c@
<
January 29, 1997
Mr. Lee Liu
Chairman of the Board,
President, and Chief
Executive Officer
IES Utilities, incorporated
200 First Street SE
P.O. Box 351
Cedar Rapids, IA 52406
SUBJECT:
NRC INSPECTION REPORT NO. 50 331/96012(DRS)
Dear Mr. Liu:
01 December 16,1996, the NRC completed an inspection of the licensed operator
requalification training program at your Duane Arnold Energy Center. The enclosed report
presents the results of that inspection.
Overall, the inspectors concluded that generally the licensed reactor operator and senior
reactor operator requalification programs were being implemented in accordance with 10 CFR Part 55 requirements. However, the remediation program administered to operators
that failed the annual requalification examination was judged to be a significant weakness
while the 10 CFR 55.59(a)(2) requirement to pass a comprehensive written examination
was considered unresolved.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter
and the enclosed report will be placed in the NRC Public Document Room.
!
i)
!
i
05Ob331
D
DO
9@
G
'
p
--
-
- . . . - . - .
-
--
. - . .
..
. - , .
-
. , . .
_
_ _ . _ . .
_
_-_._. ._ _ _ _ __
.
.
.
_ . _
_ .
_
__.
_
,
.
.
1
L.Liu
-2-
January 29, 1997
]
a
We will gladly discuss any questions you have concerning this inspection.
i
Sincerely,
j
j
J
Original Signed by Melvyn Leach (for)
Geoffrey E. Grant, Director
Division of Reactor Safety
-
Docket No. 50-331
-
a
Enclosure:
NRC Inspection Report
,
No. 50-331/96012(DRS)
,
i
cc w/ encl:
G. Van Middlesworth, Plant Manager
K. E. Peveler, Manager, Licensing
arid Emergency Planning
Chairperson, Iowa Utilities Board
Distribution:
Docket File w/ encl
Rlli PRR w/ encl
Enf. Coordinator, Rlli w/ encl
j
PUBLIC IE-42 w/ encl
CAA1 (e-mail) w/ encl
l
OC/LFDCB w/enct
LPM, NRR w/enct
A. B. Beach, Rlli w/enci
DRP w/enci
DRS w/enci
W. L. Axelson, Rlli w/enct
!
.:
!
i
3
1
i
DOCUMENT NAME: G:DRS\\DUA96012.DRS
l
To receive a copy of this document, indicate in the box: "C" = Copy without
attachment / enclosure
"E" = Copy with attachment / enclosure
"N" = No copy
0FFICE
RIII
)3 RIII
!a RIII
l
RIII
lM
NAME
DMcNeil:jp w ~
JLennartz d -
MJordan f4 M k MLeach/GGrante:rx
e
DATE
01/ Z9 /97
Ol/ g /97
01/g9/97
01/21 /97
0FFICIAL RECORD COPY