MAINE YANKEE NUCLEAR P0h'ER STATION MONTilLY STATISTICAL REPORT 78-11 FOR Tile MONTil 0F NOVEMBER, 1978 i

i 7812150M~7

T Q

(s

~

OPERATING DATA REPGRT DOCKET NO.

50-309 DATE Maine Yankee COMPLETED BY 781211 TELEPil0NE (6171 366 9011 X2281 OPERATING STATUS

1. Unit Name:

Maine Yankee Notes November, 1978

2. Reporting Period:

2630

3. Licensed Thermal Power (MWt):

864

4. Nameplate Rating (Gross MWe):

825

5. Design Electrical Rating (Net MWe):

0"

6. Maximum Dependable Capacity (Gross MWe):

810 7 Maximum Dependable Capacity (Net MWe):

i

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted,1f Any (Net MWe):

864 MWe approximatelv 97"t,

10. Reasons For Restrictions. lf Any:._.!!ccause of the maximum allowable steam flow throuch the L.P. Turbinc.

This Month Yr..to.Date Cumulatise 720 8,016

11. If ours in Reporting Period
12. Number Of flours Reactor Was Critical 713.2 6,775.63 44,304.43 0

0 0

13. Reactor Reserve Shutdown llours
14. Ilours Generator on.Line 710.55 6,627.74 42',785.74
15. Unit Reserse Shutdown flours 0

0 0

16. Gross Thermal Energy Generated (MWil) 1,776,292 15,061,204 89,503,010
17. Gross Electrical Energy Generated (MWil) 600,400,,

5,006,900 29,245,070

18. Net Electrical Energy Generated (MWil) 573.485 4.760.184 27,693,455
19. Unit Service Factor 98.7 82.7 80.6
20. Unit Availability Factor 98.7 82.7 68.4, 80.6
21. Unit Capacity Factor (Using MDC Net) 98.3 76.8
22. Unit Capacity Factor (Using DER Net) 96.5 74.3 65.8 1.3 4.3 3.6
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months 87ype. Date,and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY g

INITIA L ELECTRICITY COMMERCIAL OPERATION (9/77) w T

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. ED-309 UNIT Maine Yankee 781211 DATE CONIPLETED By R.M. Siocren TELEPHONE (617) 3b6-9011 X2281 h!ONTil November, 1978 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY P0hER LEVEL (MWe Net)

(ywe.Neg) 824 I

826 g7 2

u25 18 822 826 820 3

39 4

_.ti2 6 20 828 5

822 819 21 6

822 826 22 822

\\

7 23 8

704 24 823 9

813 824 25 826 826 10 11 823 27 828 700 505 12 28 823 526 13 29 14 824 827 30 823 15 3

16 823 INSTRUCTIONS On this format,hst the average daily unit power levelin MWe Net for each day in the repornng month. Compute to the nearest whole megawatt.

(9/771 s,_,

l i

l e'

DOCKET NO.

50-309 UNIT Maine Yankee DATE 781211 COMPLETED BY

_R.M.

Sjogren TELEP110NE (617) 366-9011 X2281 REPORT MONTil November 1978 SUSBIARY OF OPERATING EXPERIENCES At the beginning of the month, the plant was operating at s97% reactor power limited by the 864 MWe maximum load permitted on the low pressure turbine blading. On November 8 and 9 a load reduction to 80% was performed to repair a steam leak on the "A" MSR manway gasket and to repair the divider plate in the "C" MSR.

On November 12 and again on November 27, load reductions to 80% were required to plug two leaking condenser tubes in the "A" waterbox and one tube in the "B" waterbox.

During routine surveillance testing of the RPS system on November 28, a problem developed in the "AC" logic matrix which caused a plant trip f rcm 97% power. All systems responded normally to the trip and the plant was back at full load by 22:20 hrs. on the following day.

Investigations are still underway to determine the actual cause of the trip.

The plant remained at essentially full load for the remainder of.the month.

v

,-..m.....

,,,_,a,._.

(

\\

DOCKET NO.

50-309 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME Maine Yankee DATE 781211 R.M.

Sjogren REPORT MONT11 November 1978 COMPLETED BY TELEPilONE (617) 366-9011 X2281

'l

.5 ?

3 A

Licensee h

L Cause & Corrective No.

Date g.

3:

(

jg5 Event

{g 9-3 Action to f

5 g =!

Report :

mO 8'

Prevent Recurrence H

e o

6 L.R.

11/8/78 F

39.33 A

1 NA HF IITEXCII-A Steam leak on the "A" MSR manway.and to 80%

thru divider plate gasket leak on the "C" 11/9/78 MSR L.R.

to 80% 11/12/78 F

19.50 A

1 NA HF

!!TEXCll-D Condenser tube leak in the "A" water-box--Tube plugged.

L.R.

11/27/78 to 80% 11/28/78 F

9.83 A

1 NA HF IITEXCll-D Condenser tube leak in the "B" water-box--Tube plugged.

4-78-4 11/28/78 11/29/78 F

9.45 A

3 NA IA IMSTRO-X Trip' caused by problem in the RPS logic matrix - Investigation is continuing.

I 2

3 4

F: Forced Reason :

Method :

Exhibit G - Instructions S: Sched uleil A-Equipment Failure (Explain) 1 -Man ual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Se am.

Event Report (1 ER) File tNUREG-D-Regulatory Restriction 4-Ot her (Explain) 0161)

E-Operator Training & License Examination 4

F-Administrative 5

G-Operational Error I Explain)

Exhibit I - Same Source t'J/77)

II.Other ( E xplain )

I