OPERATING DATA REPORT DOCKET NO.
50-271 DATE 880110 COMPLETED BY G.A. Wallin TELEPHONE (802) 257-7711 OPERATING STATUS Notes:
1.
Unit Names Vermont Yankee 2.
Reporting Periodi_
December 3.
Licensed Thermal Power (MWt):
1593 4.
Nameplate Rating (Gross MWe):
540 5.
Design Electrical Ratirig (Net MWe):514(oc) 504(cc) 6.
Maximum Dependable Capacity (Gross MWe):
535 7.
Maximum Dependable Capacity (Net MWe):
504 8.
If changes occur in capacity ratings (Items Nunter 3 through 7) since last recort, giva reasons:
N/A 9.
Power level to which restricted, if any (Net MWe):
N/A
- 10. Reasons for restrictions, if any:
N/A This mnnth Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744.00 8760.00
- 12. Number of Hours Reactor was Critical 744.00 7374.63 104845.36
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 744.00 7290.58 102269.27
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 1171381.00 11065071.00 149740711.50
- 17. Gross Electrical Energy Generated (MWH) 396092.00 3711110.00 49839944.00
- 18. Net Electrical Energy Generated (MWH) 380027.00 3536411.00 47295087.00
- 19. Unit Service Factor 100.00 83.23 76.37
- 20. Unit Availability Factor 100.00 83.23 76.37
- 21. Unit Capacity Factor (using K)C Net) 101.35 80.10 70.07
- 22. Unit' Capacity Factor (using DER Net) 99.38
- 78. 54 68.71
- 23. Unit Forced OJtage Rate 0.00 1.17 6.32
- 24. Shutdowns scheduled over next 6 months (Type, Date and Duration of Each):
N/A
- 25. If shut down at end of report period, estimated date of startup: N/A
- 26. Units in Test Status (prior to commercial operation): N/A Forecast Achieved INITIAL CM TICALITY VYDPF 0411 O INITIAL ELECTRICITY Roy. 1 CO M RCIAL OPERATION 8801150221 871231 PDR ADOCK 05000271 R
PDR g
S S \\
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-271 UNIT Vermont Yankee DATE 880110 COMPLETED BY.G.A. Wallin TELEPHONE
__(802) 257-7711 MONTH December DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (We-Net)
(MWe-Net) 1 519 17 516 2
518 18 517 3
518 19 517 l
4 518 20 513 5
409 21 517 6
461 22 517 7
517 23 517 I
I 8
517 24 517 l
9 517 25 517 l
10 517 26 517 l
l l
11 518 27 513 12 517 28 517 i
l 13 510 29 516 1
i 14 516 30 515 15 505 31 516 l
16 516 1
l INSTRUCTIONS:
l l
On this format, list the average daily unit power level in We-Net for each day in the reporting rienth.
Compute to the nearest whole megawatt.
VYDPF 0411.02 Rev. 1
DOCKET NO.
50-271 UNIT NAE Vermont Yankee UNIT SHUTDOWNS AND POWER REDUCTIONS DATE 880110 COMPLETED BY G. A. wallin REPORT MONTH December TELEPHOPE (802) 257-7711 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause and Corrective Action to (hours)
Shutting Down Event Code Code Prevent Recurrence Reactor Report +
87-21 871205 S
0.00 B,H*
4 N/A RB CONROD Control Rod Pattern Exchange and Power Surveillance Testing Reduction 1
2 Reason:
F-Forced A-Equipment Failure (Explain) 3 Method:
4 Exhibit G - Instructions S-Scheduled B-Maintenance or Test 1-Manual for Preparation of Data Entry C-Refueling 2-Manual Scram St.Tts for Licensee Event D-Regulatory Restriction 3-Automatic Scram Report (LER) File (NLREG 0161)
E-Operator Training and License Examination 4-Other (Explain)
F-Administrative 5 Exhibit I - Same Source G-Operational Error (Explain) See Above Cause and Corrective Action section
- H-Other (Explain) - Control Rod Pattern Exchange VYDPF 0411.03 Rev. 1
00CXET NO.
50-271 UNIT Vermont Yankee DATE 880110 COMPLETED BY G.A. Wallin TELEPHONE (802) 257-7711 REPORT MONTH December SU WARY OF ON RATING EXPERIEPCES Highlights Vermont Yankee operated at 98.8% of rated thermal power for the month.
Gross electrical generation was 396,092 MWHe or 98.6% of design electrical capacity.
Operatino Summary The following is a chronological description of plant operations including other pertinent items of interest for the months At the beginning of the reporting period the plant was operating at 100.0%
of rated thermal power.
871205 At 0903 hours0.0105 days <br />0.251 hours <br />0.00149 weeks <br />3.435915e-4 months <br />, reduced power to minimum recirculation flow.
871205 At 1005 hours0.0116 days <br />0.279 hours <br />0.00166 weeks <br />3.824025e-4 months <br />, initiated control rod exercising.
871205 At 1107 hours0.0128 days <br />0.308 hours <br />0.00183 weeks <br />4.212135e-4 months <br />, completed control rod exercising; initiated a rod pat-tern exchange.
(See Unit Shutdowns end Power Reductions).
871205 At 1215 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.623075e-4 months <br />, completed the rod pattern exchange.
871205 At 1340 hours0.0155 days <br />0.372 hours <br />0.00222 weeks <br />5.0987e-4 months <br />, a return to full power was initiated.
At the end of the reporting period, the plant was operating at 100.0% of rated thermal power.
i VYDPF 0411.04 Rev. 1 l
i
hERMONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR IIUNT ROAD VERNON, VERMONT 05354 January 10, 1988 VYV 88-007 U. S. Nuclear Regulatory Commission Director, Office of lbnagement Information and Program Control Washington, D. C.
10555
Dear Sir:
Submitted herewith is the Monthly Statistical Repo.t for the Vermont Yankee Nuclear Power Station for the month of December,1987.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORP.
4*---
Y Warren P. Murph Vice President and Manager of Operatio s j
i VYOPF 0411 Rev. 1
\\\\
VERMONT YANKEE NUCLEAR POWEP. STATION MONTHLY STATISTICAL REPORT 87-12 FOR THE MONTH OF DECEMBER,1987
]
VYDPF 0411 Rev. I s