ML20147B297

From kanterella
Jump to navigation Jump to search
Forwards LER 78-061/03L-0
Date released: 06/09/2020 Download: ML20147B297


/03L-0 on 780905:failure of 1-2A Diesel Generator to Respond to Voltage/Speed Control in Auto Due to Failure of Motorized Potentiometer(Failed Diodes)Causing the 125V DC Supply Fuses to Blow
ML20147B318
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/02/1978
From: Hairston W
ALABAMA POWER CO.
To:
References
Download: ML20147B318 (1)
Forwards LER 78-061/03L-0
ML20147B293
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/02/1978
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20147B293 (1)