TENNESSEE VALLEY AUTHORITY SN 157B Lookout Place FEB 291988 l
l U.S. Nuclear Regulatory Comission ATTN: Document Control Desk Washington, D.C.
20555 Gentlemen:
l l
In the Matter of
)
Docket Nos. 50-327 l
Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) UNITS 1 AND 2 - NRC INSPECTION REPORT NOS.
I 50-327, -328/86 RESPONSE TO INFERRED COMMITMENTS l
Enclosed is TVA's plan to develop and implement the Q-list at SQN as comitted to in my response to the Inspection Repc,rt. describes and illustrates the plans, and enclosure 2 contains the list of commitments-contained in enclosure 1.
TVA does not recognize any other items described herein as comitments.
If you have any questions, please telephone M. R. Harding at 615/870-6422.
Very truly yours, TENNESSEE VALLEY AUTHORITY
. G idley, Dir et r Nuclear Licensing an'd Regulatory Affairs l
' Enclosures cc (Enclosures):
Mr. K. P. Barr,' Acting Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Comission l
Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. G. G. Zech, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Comission One White Flint, North 11555 Rockville Pike 4
Rockville, Maryland 20852 Sequoyah Resident Inspector gf Sequoyah Nuclear Plant 2600 Igou Ferry Road
/
l Soddy Dainv. Tenneene. 37379
/
a""
- """""*x" MP3oAM8L828886 l
.n<
onD
ENCLOSURE l RESPONSE TO NRC INSPECTION REPORT NOS. 50-327, -328/86-11 GARY G. 2ECH'S LETTER TO S. A. WHITE
-DATED OCTOBER 9, 1986 The purpose of this submittal is to provide the status and schedule for the development of the Sequoyah Q-list.
TVA is planning to develop the Q-list on SQN in a phased approach.
Initially, we will categorize and evaluate all components in the safety-related systems using the following design output documents:
instrument tabulations and the flow, control, and schematic diagrams.
The systems selected include all of the systems contained in the Phase 1 portion of the Design Baseline and Verification Program (DBVP), plus additional systems that SQN Operations and Maintenance indicate are particularly important to them in accomplishing their work. TVA believes that the Phase 1 SQN Q-list, at this point, will catisfy all regulatory requirements. The Phase 2 work will consist of evaluation and categorization of the remaining systems at SQN for possible inclusion in the Q-list.
TVA's schedule for implementation of Phases 1 and 2 of the SQN Q-list is shown on attachment 1.
As indicated on that figure, all systems contained in Phase 1 of the list will be issued by the end of April 1989.
TVA has developed a list of nine attributes that will be displayed on the Q-list to classify and d(scribo each component. Attachment 2 displays this list of attributes.
The teara that will be formed to accomplish this task will be made of both Operations and Division of Nuclear Engineering (DNE) personnel.
TVA plans to make full use of the work, which has been accomplished to date at Watts Bar Nuclear !1 ant, as well as information gathered during other efforts at SQN
)
such as DBVP and Equipment Qualitication Program.
Plant and engineering procedures will be evaluated and, where necessary, revised to ensure that ongoing work at SQN will be factored into the list as it is developed and I
maintained in the future.
l
=am
I, INCIOSilRL 1 AI I AtllHI N I I SEQl10YAll 0-l_IST SolEIMil E 3/88 4/88 10/88 4/t!9 10/89 10/90 0 --
==0------
O-0-
==------
--0------
0---------
> 6/1/88 00btain OStaff Board 0 Train Personnel Approval OWrite Procedures PHASE 1 I
07/1/88 Begin issuing approximately 4 systems / month PHASE 2 s
s 0 Evaluate and categorize the remaining SQN systems.
I I
6
+
m-..
-_-2-.
a
,1,-
w
.._m.
.. _ _. =. _
?,
ENCLOSURE 1 ATTACHMENT 2 SEQUOYAH NUCLEAR PLANT UNIT 2 Q-LIST Component Description Safety A/P EQ 1E Seis Cat Limited Source I.D.
Classification QA Documents 1
(Unique (Nametag (Safety Active 10CFRSO.49 IEEE279 Seismic (NQAM Drawings i
Identifier)
Description)
Category) or Category Part I Passive Section 1.3) c l
I 1
i E
i 1.
s O
m
e ENCLOSURE 2 List of Commitments 1.
All systems included in Phase 1 of the SQN Q-list will be issued by the end of April 1989.
9 4