Advises of Planned Insp Effort Resulting from Plant PPR Review on 961108
ML20147A900
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 01/14/1997
From: Lanksbury R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Stanley H
COMMONWEALTH EDISON CO.
References
NUDOCS 9701280357
Download: ML20147A900 (4)


Text

..

l 3

January 14, 1997 Mr. H. G. Stanley Site Vice President Braidwood Station Commonwelith Edison Company RR #1, En 84 4

i Braceville, IL 60407

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - BRAIDWOOD

Dear Mr. Stanley:

On November 8, 1996 NRC staic completed the semiannual Plant Performance Review (PPR) of Braidwood Nuclear Generating Plant. The staff conducts these reviews for all operating nuclear power plants to develop an integrated underutan ng of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources.

The PPR for Braidwood involved the participation of all Region III technical divisions as well as responsible NRR staff, in evaluating ins)ection results and safety performance information for the period from Marc 1 to October 1996.

PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the BraMwood PPR review.

The information is provided to enable appropriate consideration of the resource impact on your staff, and to permit scheduling conflicts and personnel availability issues to be resolved in advance of inspector arrival onsite. The enclosure details our inspection alan for approximately the next 6 months.

The rationale or basis for eac1 inspection outside the " Core" inspection program is provided so that you are aware of the reason for emphasis in these program areas.

Resident inspections, as well as periodic inspections by other assigned members of the staff, may occur at any time in support of the Core inspection program.

76 O

9701280357 970114 PDR ADOCK 05000456 f5 G

PDR

{

J

4 H. G. Stanley We are interested in feedback on this program, including the need for any changes in the inspection plan, and we invite your questions or comments.

If changes are necessary. you will be informed.

If you have any questions or comments, please contact me at 630-829-9631.

Sincerely, oger D LaYsYukChief Reactor Projects Branch 3 Docket No. 50-456 Docket No. 50-457 License Wos. NPR-72: NPR-77

Enclosure:

Inspection Plan cc w/ encl:

T. J. Maiman. Senior Vice President Nuclear Operations Division D. A. Sager. Vice President.

Generation Su3 port H. W. Keiser. C11ef Nuclear Operating Officer T. Tulon. Station Manager T. Simpkin. Regulatory Assurance Supervisor I. Johnson. Acting Nuclear Regulatory Services Manager Richard Hubbard Nathan Schloss. Economist Office of the Attorney General State Liaison Officer Chairman. Illinois Commerce Commission Document Control Desk-Licensing Distribution Docket File w/ encl DRP w/ encl OC/LFDCB w/ encl RIII PRR w/ encl PUBLIC M w/ encl CAA1 w/ encl (E-mail)

SRI Byron. Braidwood. Zion w/ encl B. L. Burgess, w/ encl Project Mgr., NRR w/ encl A. B. Beach, w/ encl RAC1 (E-Mail)

W. L. Axelson, w/enci eive a copy of this document.1 ic te in the x "C" opy without attach /enci *E" = Copy with attach /enci T=

OFFICE RIII RIII RIII E

NAME Creed \\ Leach Ring \\Kozak Gardner\\Kropp Kurth\\

Lanksbury b DATE 12/ /96

,12/ /96 12/ /96 ll/M /96 7 0FFICIAL RECORD COPY

i A

H. G. Stanley We are interested in feedback on this program, including the need for any changes in the inspection plan, and we invite your questions or comments.

If changes are necessary, you will be informed.

If you have any questions or comments, please contact me at 708-829-9631.

Sincerely, Roger D. Lanksbury, Chief Reactor Projects Branch 3 Docket No. 50-456 Docket No. 50-457 License Nos. NPR-72; NPR-77

Enclosure:

Inspection Plan cc w/ encl:

T. J. Maiman, Senior Vice President Nuclear Operations Division D. A. Sager, Vice President, Generation Support H. W. Keiser, Chief Nuclear Operating Officer T. Tulon, Station Manager T. Simpkin, Regulatory Assurance Supervisor I. Johnson, Acting Nuclear Regulatory Services Manager Richard Hubbard Nathan Schloss, Economist Office of the Attorney General State Liaison Officer Chairman, Illinois Commerce Commission Document Control Desk-Licensing Distribution Docket File w/ encl DRP w/ encl OC/LFDCB w/ encl RIII PRR w/ encl PUBLIC.48800 w/ encl CAAl w/ encl (E-mail)

SRI Byron, Braidwood, Zion w/ encl B. L. Burgess, w/ encl Project Mgr., NRR w/ encl A. B. Beach, w/ encl RAC1 (E-Mail)

W. L. Axelson, w/ encl g g

...,,., sni. w

. iwi... s6 6..

c. c.,,.iin s. t..nf.

i c. c.,,.iin.it.cnf i

n.

OFFICE RIII 6

RIII h

EIII E

1 jth\\ leach Ring \\ b krdner\\K Khb\\

NAME

(

d p

\\hp Lanksbury 0 93 I2/1 /95 eDATE 12/ /91

)d/f/95 W/

/

0FFICIAL RECORD COPY

. ~..

e-f BRAIDWOOD INSPECTION PLAN INSPECTION TITLE /

NUMBER OF PLANNED TYPE OF PROGRAM AREA INSPECTORS INSPECTION INSPECTION -

DATES COMMENTS IP 40500 SAQV 2

2/24-3/14/97 Core Inspection IP 82701 EP 1

3/3-7/97 Core Inspection IP 81700 Security 1

3/10-14/97 Core Inspection IP 83750 RP 1

3/17-21/97 Core Inspection

.l IP 86750 RP 1

4/28-5/2/97 Core Inspection TI 2515/133 (Radwaste Transportation)

IP 84750 Chemistry 1

2/3-7/97 Core Inspection f

IP 71001 Requalification 2

8/11-15/97 Core Inspection Enclosure IP - Inspection Procedure TI - Temporary Instruction CI - Core Inspection - Minimum NRC Program (mandatory all plants)

RI - Regional Initiative I

f

-