ML20147A861
| ML20147A861 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 01/15/1997 |
| From: | Caldwell J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Myers L CENTERIOR ENERGY |
| Shared Package | |
| ML20147A866 | List: |
| References | |
| NUDOCS 9701280346 | |
| Download: ML20147A861 (3) | |
See also: IR 05000440/1996011
Text
.
-
.-
. - . - - - . - . - _ . -
- . . . - . . - - - - ~ - . . - ,
.
.
PUfalhG
TES I
g4
A
.
'
January 15, 1997
Mr. Lew W. Myers
>
Vice President, Nuclear
'Centerior Service Company
,
P. O. Box 97, A200
Perry, OH 44081
SUBJECT:
NRC INSPECTION REPORT NO. 50-440/96-11 AND
'
Dear Mr. Myers:
On November 1,1996, the NRC corapleted a routine safety inspection at your
Perry 1 reactor facility. The enclosed report presents the results of that.
inspection.
During the 7-week period covered by this inspection period, your conduct of
activities at the Perry facility was generally characterized by safety-
!
conscious operation, appropriate maintenance practices, and sound engineering
'
practices.
The facility was operated safely. One plant event, involving the
trip of a motor control center feeder breaker, occurred that impacted plant
o]eration, but did not cause a plant transient.
Your staff responded well to
.
t1is event. However our evaluation of the equipment malfunction that
contributed to this event has not been completed.
This item is of concern
because it had the potential to cause a loss of safety function of the control
room emergency recirculation system.
A violation of NRC requirements was identified.
In this case, your personnel
i
identified that a change to an instruction had made the instruction unusable
l
as written. One of your unlicensed operators identified the error while NRC
inspectors were observing his attem)t to follow the instruction.
Your
Jersonnel further identified that t1e erroneous section of the instruction had
,
Jeen completed several times without the error being identified. .The delay in
,
identifying the error concerns us, as does your failure to identify the error
!
during review of the instruction prior to use.
l
This violation is cited in the enclosed Notice of Violation, and the
-
circumstances surrounding the violation are described in detail in the
'
enclosed report.
Please note that you are required to respond to this letter
,
and should follow the instructions specified in the enclosed Notice when
preparing your response. The NRC will use your response, in part, to
,
determine whether further enforcement action is necessary to ensure compliance
with regulatory requirements.
,
.
.
9701280346 970115
i
ADOCX 05000440
(
G
!
t
\\
\\
l
'
-
,
-
._.
.
.-
-
.
.
_
_
i
<
' . . .
L. Myers
-2-
'
.s
,
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and the enclosures will be placed in the NRC Public Document Room
(PDR).
Sincerely,
/s/ J. L. Caldwell
James L. Caldwell, Director
Division of Reactor Projects
Docket No.
50-440
License No.
l
Enclosures:
Inspection Report 50-440/96-11
i
'
cc w/ encl:
J. P. Stetz, Senior Vice
President - Nuclear
L. W. Worley, Director, Nuclear
Services Department
J. D. Kloosterman, Manager,
Regulatory Affairs
'
W. R. Kanda. Director, Perry Nuclear
Assurance De3artment
N. L. Bonner, Jirector, Perry
Nuclear Engineering Dept.
H. Ray Caldwell, General
Superintendent Nuclear Operations
R. D. Brandt, General Manager Operations
Terry J. Lodge, Esq.
!
State Liaison Officer, State of Ohio
Robert E. Owen, Ohio
Department of Health
i
C. A. Glazer. State of Ohio,
Public Utilities Commission
Distribution:
Docket File w/ encl
SRI Perry w/ encl
PUBLIC IE-01 w/ encl
DRP w/ encl
OC/LFDCB w/ encl
RIII PRR w/enci
'
Project Manager, NRR w/ encl
CAA1 w/ encl (E-mail)
A. B. Beach, w/ enc 1
H. B. Clayton, w/ encl
W. L. Axelson, w/ encl
PLEASE SEE ATTACHED CONCURRENCES
Document:
R:\\INSPRPTS\\ POWERS \\PERR\\PER96-11.DRP
To reca.ive a copy of this document, indicate in the box "C" = Copy without attach / encl "E" = Copy with attach / encl
"N" =
l
OFFICE
Rill
Riti
Rill
NAME
JJacobson/bs b
BClayton
JCaldwell
DATE
1//[f97
1/ /97
1/ /97
0FFICIAL RECORD
- 0PY
,_
_ _ _ . - _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . . _ . _ . . . _ . . ~ .
- . . _ _ _ _ . _
,
I
id , *
I',
L. Myers
-2-
i
- .*
$
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and the enclosures will be placed in the NRC Public Document Room
(PDR).
4
]
k
Sincerely,
!
i
!
l
James L. Caldwell, Director
!
Division of Reactor Projects
i
Docket No.
50-440
License No.
Enclosures:
Inspection Report 50-440/96-11
1
cc w/ encl:
J. P. Stetz, Senior Vice
4
!
President - Nuclear
!
L. W. Worley, Director, Nuclear
I
i
Services Department
i
J. D. Kloosterman. Manager,
'
l
Regulatory Affairs
l
W. R. Kanda, Director. Perry Nuclear
j
Assurance Department
N. L. Bonner. Director, Perry
,
,
Nuclear Engineering Dept.
'
H. Ray Caldwell, General
Superintendent Nuclear Operations
R. D. Brandt, General Manager Operations
Terry J. Lodge, Esq.
State Liaison Officer, State of Ohio
Robert E. Owen, Ohio
Department of Health
C. A. Glazer, State of Ohio,
Public Utilities Commission
Document:
R:\\lNSPRPTS\\ POWERS \\PERR\\PER96-11.DRP
To receive a copy of this document, indicate in the box "C" = Copy without attach /enci *E' = Copy with attach / enc 1
"N" =
No copy
0FFICE
Rill
Rlli
R)
4,
NAME
JJacobson/bs
BClayton
)
DATE
1/ /97
1/[97
1
97
0FFICIAL RECORD
,0PY
-
-
. ..
. -
-.
.-- .