Forwards Insp Rept 50-440/96-11 on 960915-1101 & Notice of Violation
ML20147A861
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 01/15/1997
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Myers L
CENTERIOR ENERGY
Shared Package
ML20147A866 List:
References
NUDOCS 9701280346
Download: ML20147A861 (3)


See also: IR 05000440/1996011

Text

.

-

.-

. - . - - - . - . - _ . -

- . . . - . . - - - - ~ - . . - ,

.

.

PUfalhG

TES I

g4

A

.

'

January 15, 1997

Mr. Lew W. Myers

>

Vice President, Nuclear

'Centerior Service Company

,

P. O. Box 97, A200

Perry, OH 44081

SUBJECT:

NRC INSPECTION REPORT NO. 50-440/96-11 AND

'

NOTICE OF VIOLATION

Dear Mr. Myers:

On November 1,1996, the NRC corapleted a routine safety inspection at your

Perry 1 reactor facility. The enclosed report presents the results of that.

inspection.

During the 7-week period covered by this inspection period, your conduct of

activities at the Perry facility was generally characterized by safety-

!

conscious operation, appropriate maintenance practices, and sound engineering

'

practices.

The facility was operated safely. One plant event, involving the

trip of a motor control center feeder breaker, occurred that impacted plant

o]eration, but did not cause a plant transient.

Your staff responded well to

.

t1is event. However our evaluation of the equipment malfunction that

contributed to this event has not been completed.

This item is of concern

because it had the potential to cause a loss of safety function of the control

room emergency recirculation system.

A violation of NRC requirements was identified.

In this case, your personnel

i

identified that a change to an instruction had made the instruction unusable

l

as written. One of your unlicensed operators identified the error while NRC

inspectors were observing his attem)t to follow the instruction.

Your

Jersonnel further identified that t1e erroneous section of the instruction had

,

Jeen completed several times without the error being identified. .The delay in

,

identifying the error concerns us, as does your failure to identify the error

!

during review of the instruction prior to use.

l

This violation is cited in the enclosed Notice of Violation, and the

-

circumstances surrounding the violation are described in detail in the

'

enclosed report.

Please note that you are required to respond to this letter

,

and should follow the instructions specified in the enclosed Notice when

preparing your response. The NRC will use your response, in part, to

,

determine whether further enforcement action is necessary to ensure compliance

with regulatory requirements.

,

.

.

9701280346 970115

i

PDR

ADOCX 05000440

(

G

PDR

!

t

\\

\\

l

'

-

,

-

._.

.

.-

-

.

.

_

_

i

<

' . . .

L. Myers

-2-

'

.s

,

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and the enclosures will be placed in the NRC Public Document Room

(PDR).

Sincerely,

/s/ J. L. Caldwell

James L. Caldwell, Director

Division of Reactor Projects

Docket No.

50-440

License No.

NPF-58

l

Enclosures:

Notice of Violation

Inspection Report 50-440/96-11

i

'

cc w/ encl:

J. P. Stetz, Senior Vice

President - Nuclear

L. W. Worley, Director, Nuclear

Services Department

J. D. Kloosterman, Manager,

Regulatory Affairs

'

W. R. Kanda. Director, Perry Nuclear

Assurance De3artment

N. L. Bonner, Jirector, Perry

Nuclear Engineering Dept.

H. Ray Caldwell, General

Superintendent Nuclear Operations

R. D. Brandt, General Manager Operations

Terry J. Lodge, Esq.

!

State Liaison Officer, State of Ohio

Robert E. Owen, Ohio

Department of Health

i

C. A. Glazer. State of Ohio,

Public Utilities Commission

Distribution:

Docket File w/ encl

SRI Perry w/ encl

PUBLIC IE-01 w/ encl

DRP w/ encl

OC/LFDCB w/ encl

RIII PRR w/enci

'

Project Manager, NRR w/ encl

CAA1 w/ encl (E-mail)

A. B. Beach, w/ enc 1

H. B. Clayton, w/ encl

W. L. Axelson, w/ encl

PLEASE SEE ATTACHED CONCURRENCES

Document:

R:\\INSPRPTS\\ POWERS \\PERR\\PER96-11.DRP

To reca.ive a copy of this document, indicate in the box "C" = Copy without attach / encl "E" = Copy with attach / encl

"N" =

l

OFFICE

Rill

Riti

Rill

NAME

JJacobson/bs b

BClayton

JCaldwell

DATE

1//[f97

1/ /97

1/ /97

0FFICIAL RECORD

0PY

,_

_ _ _ . - _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . . _ . _ . . . _ . . ~ .

- . . _ _ _ _ . _

,

I

id , *

I',

L. Myers

-2-

i

.*

$

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and the enclosures will be placed in the NRC Public Document Room

(PDR).

4

]

k

Sincerely,

!

i

!

l

James L. Caldwell, Director

!

Division of Reactor Projects

i

Docket No.

50-440

License No.

NPF-58

Enclosures:

Notice of Violation

Inspection Report 50-440/96-11

1

cc w/ encl:

J. P. Stetz, Senior Vice

4

!

President - Nuclear

!

L. W. Worley, Director, Nuclear

I

i

Services Department

i

J. D. Kloosterman. Manager,

'

l

Regulatory Affairs

l

W. R. Kanda, Director. Perry Nuclear

j

Assurance Department

N. L. Bonner. Director, Perry

,

,

Nuclear Engineering Dept.

'

H. Ray Caldwell, General

Superintendent Nuclear Operations

R. D. Brandt, General Manager Operations

Terry J. Lodge, Esq.

State Liaison Officer, State of Ohio

Robert E. Owen, Ohio

Department of Health

C. A. Glazer, State of Ohio,

Public Utilities Commission

Document:

R:\\lNSPRPTS\\ POWERS \\PERR\\PER96-11.DRP

To receive a copy of this document, indicate in the box "C" = Copy without attach /enci *E' = Copy with attach / enc 1

"N" =

No copy

0FFICE

Rill

Rlli

R)

4,

NAME

JJacobson/bs

BClayton

)

DATE

1/ /97

1/[97

1

97

0FFICIAL RECORD

,0PY

-

-

. ..

. -

-.

.-- .