January 23,1997
Mr. S. A. Patulski
Site Vice Preside 1t
Point Beach Nuclear Plant
6610 Nuclear Road
>
Two Rivers, WI 54241
SUBJECT:
OPERATOR LICENSING EXAMINATION REPORTS NO. 50-266-96303(OL):
50-301-96303(OL) AND NOTICE OF VIOLATION
Dear Mr. Patuiski:
i
This refers to the NRC administered initiallicense examinations conducted by
Mr. J. Lennartz and others the week of October 7,1996. The examinations were
i
administered to seven employees of your company who had applied for licenses to operate
the Point Beach Nuclear Plant, Units 1 and 2. At the conclusion of the examination
process, preliminary findings were discussed with those members of your staff identified in
the enclosed report.
Two applicants failed the operating examination due to unsatisfactory performance on
Administrative Job Performance Measure tasks. Five applicants passed the examinations
and will be issued licenses. However, two of those five applicants demonstrated
performance weaknesses on the administrative tasks.
,
Additionally, an inspection 'o assess an apparent training weakness and procedure
deficiency related to the /b VDC Electrical Distribution System identified during initial
license examination administration was conducted from November 20-27, 1996. Based on
the results of this inspection, the NRC has determined that a violation of NRC requirements
occurred. This issue is cited in the enclosed Notice of Violation, and the circumstances
surrounding the violation are described in detailin the enclosed report. Please note that
you are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. Include in your response the corrective
actions regarding the 125 VDC Electrical Distibution System training weaknesses and the
performance weaknesses demonstrated on the Administrative Job Performance Measure
Tasks. The NRC will use your response,in part, to determine whether further enforcement
action is necessary to ensure compliance with regulatory requirements.
9701280289 970123
ADOCK 05000266
V
o
.
S. A. Patulski
-2-
January 23, 1997
'
.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosures will be placed in the NRC Public Document Room (PDR).
,
Sincerely,
Original Signed by John A. Grobe
John A. Grobe, Deputy Director
Division of Reactor Projects
Docket No. 50-266
Docket No. 50-301
Enclosures:
1. Examination Reports
'
No. 50-266-96303(OL);
No. 50-301-96303(OL)
2. Post Examination Comments and Review
3. Simulation Facility Report
4. Examinations and Answer Keys (SRO/RO)
cc w/encls 1, 2, 3:
R. R. Grigg, President and Chief
Operating Cfficer, WEPCO
)
A. J. Cayia, Plant Manager
l
Virgil Kanable, Chief, Boiler Section
Cheryl L. Parrino, Chairman,
!
Wisconsin Public Service Commission
,
State Liaison Officer
'
T. P. Guilfoil, Contract Exam Supervisor, SONALYSTS
cc w/encls I, 2, 3 & 4:
R. D. Seizert, Plant Training Manager
Distribution:
Docket File w/encls 1,2 & 3
DRS w/encls 1,2,3
PUBLIC IE-42 w/encls 1,2,3 & 4
A. B. Beach, Rlll w/encls 1, 2, 3
Rlli PRR w/encls 1,2,3
Enf. Coordinator, Rlll w/encls 1, 2, 3
OC/LFDCB w/encls 1,2,3
SRI, Pt. Beach w/encls 1, 2, 3
CAA1 w/enci (E-mail)
DRP w/encls 1, 2,3
A. Hansen, NRR w/encls 1, 2,3
W. L. Axelson, Rlll w/encls 1, 2, 3
M. Bies, Rlli w/ encl 1, 2, 3
S. A. Richards, HOLB/NRR w/enci 1, 2, 3
280031
SEE ATTACHED CONCURRENCE
DOCUMENT NAME: G:DRS\\ pol 96303.0L
To receive a copy of this document, indicate in the box: "C" = Copy w/o att/ encl'E" = Copy w/att/enci *N" = No copy
OFFICE
Rlli
Rlll
Rlllhf/blFg
Rlll
ARil,1,9f
/
,
NAME
JLennartz:jp
MLeach
JMc/Barger
MLeach7GGaTit JW
DATE
12/ 96
12/ /96
01/197
01/7 /97
01/z3/97
OFFIC/AL RECORD COPY
-
.
S. A. Patuiski
2
.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
Geoffrey E. Crant, Director
Division of Reactor Safety
Docket No. 50-266
Docket No. 50-301
Enclosures:
1. Examination Reports No.
50-266-96303(OL);
50-301-96303(OL)
2. Post Examination Comments and Review
3. Simulation Facility Report
4. Examinations and Answer Keys (SRO/RO)
cc w/encls 1, 2, 3:
R. R. Grigg, President and Chief
Operating Officer, WEPCO
A. J. Cayia, Plant Manager
Virgil Kanable, Chief, Boiler Section
'
Cheryl L. Parrino, Chairman,
Wisconsin Public Service Commission
State Liaison Officer
A. Hanson, Project Manager, NRR
,
T. P. Guilfoil, Contract Exam Supervisor, SONALYSTS
S. A. Richards, Branch Chief, HOLB, NRR
M. A. Bies, Rill
cc w/encls 1,2, 3 & 4:
R. D. Seizert, Plant Training Manager
,
'
Distribution:
Docket File w/encls 1,2 & 3
DRS w/encls 1, 2, 3
PUBLIC IE-42 w/encis 1, 2,3 & 4
A. B. Beach, Rlll w/encls 1, 2, 3
Rlli PRR w/encls 1, 2, 3
Enf. Coordinator, Rlil w/encls 1, 2, 3
,
i
OC/LFDCB w/encls 1, 2, 3
SRI, Pt. Beach w/encls 1, 2, 3
CAA1 w/enci (E-mail)
DRP w/encls 1, 2, 3
LPM, NRR w/encls 1, 2,3
W. L. Axelson, Ritt w/encls 1, 2, 3
,
DOCUMENT NAME: G:DRS\\ pol 96303.0L
To receive a copy of this document,indicatein the bos:
"C" = Copy without attachment / enclosure
"E" = Copy with attachment / enclosure
'
"_N' = No copy
OFFICE
Rlli
lg
Rlli
lg Rill
l
Rlli
l
,
NAME
JLennartz:jp4
MLeach gy4
JMcB
GGrant
V
12/L/96
12/ /96
12/ /96
DATE
12/;S/96
OFFICIAL RECOF,D COPY