Forwards OL Exam Repts 50-266/96-303OL & 50-301/96-303OL During Wk of 961007 & Insp on 961120-27
ML20147A753
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/23/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Patulski S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20147A759 List:
References
NUDOCS 9701280289
Download: ML20147A753 (3)


See also: IR 05000266/1996303

Text

i,

f

4

January 23,1997

Mr. S. A. Patulski  ;

Site Vice Preside 1t  !

Point Beach Nuclear Plant

6610 Nuclear Road >

Two Rivers, WI 54241

SUBJECT: OPERATOR LICENSING EXAMINATION REPORTS NO. 50-266-96303(OL):

50-301-96303(OL) AND NOTICE OF VIOLATION

Dear Mr. Patuiski: i

!

This refers to the NRC administered initiallicense examinations conducted by

Mr. J. Lennartz and others the week of October 7,1996. The examinations were i

administered to seven employees of your company who had applied for licenses to operate

the Point Beach Nuclear Plant, Units 1 and 2. At the conclusion of the examination

process, preliminary findings were discussed with those members of your staff identified in

the enclosed report.

Two applicants failed the operating examination due to unsatisfactory performance on

Administrative Job Performance Measure tasks. Five applicants passed the examinations

and will be issued licenses. However, two of those five applicants demonstrated

performance weaknesses on the administrative tasks. ,

Additionally, an inspection 'o assess an apparent training weakness and procedure

deficiency related to the /b VDC Electrical Distribution System identified during initial

license examination administration was conducted from November 20-27, 1996. Based on

the results of this inspection, the NRC has determined that a violation of NRC requirements

occurred. This issue is cited in the enclosed Notice of Violation, and the circumstances

surrounding the violation are described in detailin the enclosed report. Please note that

you are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. Include in your response the corrective

actions regarding the 125 VDC Electrical Distibution System training weaknesses and the

performance weaknesses demonstrated on the Administrative Job Performance Measure

Tasks. The NRC will use your response,in part, to determine whether further enforcement

action is necessary to ensure compliance with regulatory requirements.

9701280289 970123

PDR ADOCK 05000266

V PDR

o

.

S. A. Patulski -2- January 23, 1997

'

.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

, and its enclosures will be placed in the NRC Public Document Room (PDR).

Sincerely,

Original Signed by John A. Grobe

John A. Grobe, Deputy Director

Division of Reactor Projects

Docket No. 50-266

Docket No. 50-301

'

Enclosures: 1. Examination Reports

No. 50-266-96303(OL);

No. 50-301-96303(OL)

2. Post Examination Comments and Review

3. Simulation Facility Report

4. Examinations and Answer Keys (SRO/RO)

cc w/encls 1, 2, 3: R. R. Grigg, President and Chief

Operating Cfficer, WEPCO

)

A. J. Cayia, Plant Manager l

Virgil Kanable, Chief, Boiler Section

Cheryl L. Parrino, Chairman,

l

! Wisconsin Public Service Commission

,

'

State Liaison Officer

T. P. Guilfoil, Contract Exam Supervisor, SONALYSTS

cc w/encls I, 2, 3 & 4: R. D. Seizert, Plant Training Manager

Distribution:

Docket File w/encls 1,2 & 3 DRS w/encls 1,2,3

PUBLIC IE-42 w/encls 1,2,3 & 4 A. B. Beach, Rlll w/encls 1, 2, 3

Rlli PRR w/encls 1,2,3 Enf. Coordinator, Rlll w/encls 1, 2, 3

OC/LFDCB w/encls 1,2,3 SRI, Pt. Beach w/encls 1, 2, 3

CAA1 w/enci (E-mail) DRP w/encls 1, 2,3

A. Hansen, NRR w/encls 1, 2,3 W. L. Axelson, Rlll w/encls 1, 2, 3

M. Bies, Rlli w/ encl 1, 2, 3 S. A. Richards, HOLB/NRR w/enci 1, 2, 3

l

280031 SEE ATTACHED CONCURRENCE

DOCUMENT NAME: G:DRS\ pol 96303.0L l

To receive a copy of this document, indicate in the box: "C" = Copy w/o att/ encl'E" = Copy w/att/enci *N" = No copy

OFFICE Rlli Rlll Rlllhf/blFg Rlll ARil,1,9f ,

/

NAME JLennartz:jp MLeach JMc/Barger MLeach7GGaTit JW

DATE 12/ 96 12/ /96 01/197 01/7 /97 01/z3/97

OFFIC/AL RECORD COPY

-

.

S. A. Patuiski 2

.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room (PDR).

Sincerely,

Geoffrey E. Crant, Director

Division of Reactor Safety

Docket No. 50-266

Docket No. 50-301

Enclosures: 1. Examination Reports No.

50-266-96303(OL);

50-301-96303(OL)

2. Post Examination Comments and Review

3. Simulation Facility Report

4. Examinations and Answer Keys (SRO/RO)

cc w/encls 1, 2, 3: R. R. Grigg, President and Chief

Operating Officer, WEPCO

A. J. Cayia, Plant Manager

'

Virgil Kanable, Chief, Boiler Section

Cheryl L. Parrino, Chairman,

Wisconsin Public Service Commission

State Liaison Officer

,

A. Hanson, Project Manager, NRR

T. P. Guilfoil, Contract Exam Supervisor, SONALYSTS

S. A. Richards, Branch Chief, HOLB, NRR

M. A. Bies, Rill

,

cc w/encls 1,2, 3 & 4: R. D. Seizert, Plant Training Manager

'

Distribution:

Docket File w/encls 1,2 & 3 DRS w/encls 1, 2, 3

PUBLIC IE-42 w/encis 1, 2,3 & 4 A. B. Beach, Rlll w/encls 1, 2, 3

,

Rlli PRR w/encls 1, 2, 3 Enf. Coordinator, Rlil w/encls 1, 2, 3

i OC/LFDCB w/encls 1, 2, 3 SRI, Pt. Beach w/encls 1, 2, 3

CAA1 w/enci (E-mail) DRP w/encls 1, 2, 3

LPM, NRR w/encls 1, 2,3 W. L. Axelson, Ritt w/encls 1, 2, 3

,

DOCUMENT NAME: G:DRS\ pol 96303.0L

' To receive a copy of this document,indicatein the bos: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure

= No copy

"_N'

OFFICE Rlli , lg Rlli lg Rill l Rlli l

NAME JLennartz:jp4 MLeach gy4 JMcB GGrant

V 12/L/96

DATE 12/;S/96 12/ /96 12/ /96

OFFICIAL RECOF,D COPY