Letter Sequence Draft Approval |
---|
|
|
MONTHYEARML18176A0342018-06-19019 June 2018 Toshiba Response to the NRC Letter Dated December 20, 2017 (Docket No. 99902036) Project stage: Other ML19017A1292019-02-0707 February 2019 Request for Withholding Information from Public Disclosure Submittal of the Documents Related to Toshiba Letter Dated November 9, 2018 Project stage: Withholding Request Acceptance ML19080A2902019-04-0303 April 2019 Regulatory Audit Plan for Toshiba Licensing Topical Report for Toshiba Nonrewritable-Field Programmable Gate Array-Based Instrumentation and Control System for Safety-Related Application, Utla 0020p, Revision 2 (CAC No. ME9861; EPID L-2012- Project stage: Other ML19079A1242019-04-22022 April 2019 Request for Withholding Information from Public Disclosure of Submittal of the Documents Related to Toshiba Letter Dated February 8, 2019 Project stage: Withholding Request Acceptance ML19161A0662019-06-10010 June 2019 Toshiba Digital IC TR Round 4 Request for Additional Information Project stage: Request ML19183A1602019-09-11011 September 2019 April 2019 Electronic Regulatory Audit Report for Toshiba Licensing Topical Report for Toshiba Nonrewritable-Field Programmable Gate Array-Based Instrumentation and Control System for Safety-Related Application, Utla 0020P, Revision 2 (CAC Project stage: Other ML20029E9162020-03-0202 March 2020 Request for Withholding Information from Public Disclosure of Submittal of the Documents Related to Toshiba Letter Dated January 23, 2020 Project stage: Withholding Request Acceptance ML20143A0062020-06-0101 June 2020 Transmittal Email for Toshiba Proprietary Determination for Proprietary Comments on Draft Safety Evaluation Project stage: Draft Approval ML20143A0042020-06-0101 June 2020 Proprietary Determination for Toshiba Draft Safety Evaluation Comments Project stage: Request ML20143A0052020-06-0101 June 2020 Proprietary Determination for Toshiba Draft Safety Evaluation Comments Project stage: Draft Approval ML20195A3512020-07-0101 July 2020 Final Safety Evaluation for Toshiba Licensing Topical Report for Toshiba Nrw (NONREWRITABLE)-FPGA (Field Programmable Gate Array)-Based Instrumentation and Control System for Safety-Related Application, Utla 0020P, Revision 2 (CAC No. ME986 Project stage: Approval 2019-06-10
[Table View] |
Text
From: Holonich, Joseph To: "Powers, Jim (TAES)"
Cc: Rowley, Jonathan; Zhao, Jack; Darbali, Samir; Waters, Michael; Morey, Dennis; Venkataraman, Booma
Subject:
Proprietary Determination for Proprietary Comments on Draft Safety Evaluation Date: Monday, June 1, 2020 8:48:26 AM Attachments: Proprietary Determination for Toshiba Draft SE Comments.pdf
- Jim, Attached is the U.S. Nuclear Regulatory Commission (NRC) staff proprietary determination for the Transmittal of comments on DRAFT SAFETY EVALUATION OF TOSHIBA CORPORATION TR [Topical Report] NRW [Nonrewritable]-FPGA [Field Programmable Gate Array]-BASED INSTRUMENTATION AN DCONTROL SYSTEMS FOR SAFETY-RELATED APPLICATION. The NRC staff has determined that the information will be withheld.
As part of its topical report transformation work, the NRC staff is now documenting proprietary determinations on a standard form instead of preparing detailed letters. This email and the attached form will be placed in the Agencywide Document Access and Management System and declared public. The ADAMS Accession Nos. are provided in the form.
Please note that due to the COVID-19 quarantine, the signatures contain the term R/A. This is the National Archive accepted method for documenting signatures. It means Registered Authority.
Feel free to contact me at jjh1@nrc if you have any questions.
Joe Holonich, Senior Project Manager Office of Nuclear Reactor Regulation