ML20142A380

From kanterella
Jump to navigation Jump to search
Memo to ACRS - Transmittal of Safety Evaluation Revision 2 for EPRI Triso Topical Report
ML20142A380
Person / Time
Site: Electric Power Research Institute
Issue date: 06/10/2020
From: John Monninger
NRC/NRR/DANU
To: Scott Moore
Advisory Committee on Reactor Safeguards
Jordan Hoellman, NRR/DANU/UARP, 415-5481
Shared Package
ML20142A365 List:
References
EPRI-AR-1(NP)
Download: ML20142A380 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 10, 2020 MEMORANDUM TO: Scott W. Moore, Executive Director Advisory Committee on Reactor Safeguards FROM: John D. Monninger, Director /RA/

Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation

SUBJECT:

ELECTRIC POWER RESEARCH INSTITUTE - DRAFT SAFETY EVALUATION, REVISION 2 FOR TOPICAL REPORT, URANIUM OXYCARBIDE (UCO) TRISTRUCTURAL ISOTROPIC (TRISO)

COATED PARTICLE FUEL PERFORMANCE: TOPICAL REPORT EPRI-AR-1(NP)

By letter dated May 31, 2019, Electric Power Research Institute (EPRI) submitted topical report (TR) Uranium Oxycarbide (UCO) Tristructural Isotropic (TRISO) Coated Particle Fuel Performance: Topical Report EPRI-AR-1(NP), to the U.S. Nuclear Regulatory Commission (NRC) for review and approval. This TR consolidates the technical bases for the functional performance of UCO-based TRISO-coated particles so these particles can be used by a variety of high temperature reactor (HTR) developers in their designs. EPRIs letter is available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML19155A173. The NRC staff discussed a preliminary set of questions with EPRI during a public meeting on December 9, 2019 (ADAMS Accession No. ML20029E871), and subsequently issued requests for additional information (RAIs) on January 2, 2020 (ADAMS Accession No. ML20009E065). By letters dated February 26, 2020 and March 9, 2020, EPRI submitted responses to the RAIs (ADAMS Accession Nos. ML20058A040 and ML20071D143, respectively).

The NRC staffs draft Safety Evaluation (SE), Revision 2 for TR EPRI-AR-1(NP), can be found at ADAMS Accession No. ML20142A381. Note that in the draft SE, Confirmatory Item refers to planned revisions to the TR submitted in docketed RAI responses that have not yet been formally incorporated into a revision to the TR. The SE, Revision 2, was revised as a result of comments discussed at the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee meeting on May 6, 2020, and will support a future meeting of the ACRS Full Committee.

Docket No.: 99902021 CONTACT: Jordan Hoellman, NRR/DANU 301-415-5481

ML20142A365 Package *via e-mail NRR-106 OFFICE NRR/DANU/UARP/PM

  • NRR/DANU/UARP/BC
  • NRR/DANU/UART/BC
  • NAME JHoellman JSegala MHayes DATE 6/11/2020 6/10/2020 5/20/2020 OFFICE OGC/NLO
  • NRR/DANU/DD
  • NAME OMikula JMonninger (BSmith for)

DATE 5/26/2020 6/10/2020