e OPERATING DATA REPORT Docket No. 50-317 Date: March 7,1986 Completed by R. Porter Telephone: (301) 260-4868 OPERATING STATUS emmem**mm 1.
Unit Name:
Calvert Cliffs No. I 2.
Reporting Period:
FEBRUARY 3.
Licensed Thermal Power (MWT):
2,700 4.
Nameplate Rating (gross MWe):
918 5.
Design Electrical Rating (Net MWE):
845 6.
Maximum Dependable Capacity Gross MWe:
860 7.
Maximum Dependable Capacity (Net MWe):
825 8.
Change In Capacity Ratings:
None 9.
Power Level To Which Restricted (Net MW):
NA 10.
Reasons For Restrictions:
NA This Month Yr-To-Date Cumulative 11.
Hours In Reporting Period 672 1,416 94,789 12.
Number Of Hours Reactor Was Critical 672 1,396.6 74,262.1 13.
Reactor Reserve Shutdown Hours 0.0 0.0 3,019.4 14.
Hours Generator On-line 672 1,385.5 72,745 15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWH) 1,808,947 3,681,463 181,005,656 17.
Gross Electrical Energy Generated (MWH) 613,151 1,248,526 59,851,303 18.
Net Electrical Energy Generated (MWH) 538,463 1,196,572 57,112,873 19.
Unit Service Factor 100.0 97.8 76.7 20.
Unit Availability Factor 100.0 97.8 76.7 21.
Unit Capacity Factor (Using MDC Net) 106.1 102.4 73.5 22.
Unit Capacity Factor (Using DER Net) 103.6 100.0 71.3 23.
Unit Forced Outage Rate 0.0 2.2 8.9 24.
Shutdowns Scheduled Over the Next Six Months (type, date, and duration): None 25.
If Shutdown At End Of Report Period, Estimated Date Of Startup: N/A 8603190026 860229 PDR ADOCK 05000317
]
R PDR I
til
UNIT SilllTIMNS AND IWR REDtK'I'10NS D00(ET ND.
50-317 IJNIT NAPF. Calvert Cliffs 1 I)ATP. March 7, 1986 COMPI.im:D IW R.J. Porter REPORT Pf1N'lli February
'IT;I.l:Pfl0NE (301) 260-4868 ro Y tr N
=-
es
,3 [
g
_., C g 1.irensee jj gir Cause & Correct.ive No.
Date 5
a:
5 a :>
l a ent, al "5
Act. i on t o 4
eo n
.= ax
- n z h::
g yjg Report. #
g.g u
l'revent. Reenrrence 6_
.mg u
d5 I
i No shut downs or reportable
]
reductions'this period.
1 1
4' i
I I
1 i
i i
i I
l':
l'orceci Reason:
Met h<xt:
Exhibit. G-Inst ruct, ions S: Schecini eri A-lqui w nt l'a i I nre (Explain) 1 -41anual for Pr eparat. ion of Dat a i
Il4 taint enance in Test.
2-Plannat Scram.
Entry Sheets t'or 1.icense j
C-Re t*nel i ng 3-Ant omat. ic Scram.
Event, Report (LIR) File D-Regulat ory Rest rict ion OOt her- (Explain)
(NURFG-0101) i' E-Oger at or Training & I.icense Examinat ion l'- A(Imini st : at ive j
G-operat ional I. ror (Explain) 5 Exhibit 1 - Sanut Soni ce i
II Ot her (Expir.in) t
.i l
i
l AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-317 Calvert Cliffs Unit No.1 Date: March 7,1986 Completed By R. Porter Telephone: (301) 260-4868 FEBRUARY Day Average Daily Power Level Day Average Daily Power Level (MWe-Net)
(MWe-Net) 1 876 17 875 2
879 18 875 3
877 19 876 4
876 20 875 5
877 21 876 6
877 22 876 7
874 23 878 8
875 24 877 9
873 25 878 10 875 26 876 11 875 27 876 12 875 28 875 13 873 14 874 15 874 16 875 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
OPERATING DATA REPORT Docket No. 50-318 Date: March 7,1986 Completed by R. Porter Telephone: (301) 260-4868 OPERATING STATUS m ***** m m ** m 1.
Unit Name:
Calvert Cliffs No. 2 2.
Reporting Period:
FEBRUARY 3.
Licensed Thermal Power (MWT):
2,700 4.
Nameplate Rating (gross MWe):
911 5.
Design Electrical Rating (Net MWE):
845 6.
Maximum Dependable Capacity Gross MWe:
860 7.
Maximum Dependable Capacity (Net MWe):
825 8.
Change In Capacity Ratings:
None 9.
Power Level To Which Restricted (Net MW):
NA 10.
Reasons For Restrictions:
NA This Month Yr-To-Date Cumulative 11.
Hours in Reporting Period 672 1,416 78,144 12.
Number Of Hours Reactor Was Critical 654.9 1,398.9 64,841.9 13.
Reactor Reserve Shutdown Hours 0.0 0.0 1,260.7 14.
Hours Generator On-line 652.5 1,396.5 63,807.8 15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWH) 1,658,362 3,645,516 160,127,552 17.
Gross Electrical Energy Generated (MWH) 570,184 1,244,781 52,766,340 18.
Net Electrical Energy Generated (MWH) 546,128 1,193,814 50,344,069 19.
Unit Service Factor 97.1 98.6 81.7 20.
Unit Availability Factor 97.1 98.6 81.7 21.
Unit Capacity Factor (Using MDC Net) 98.5 102.2 78.3 22.
Unit Capacity Factor (Using DER Net) 96.2 99.8 76.2 23.
Unit Forced Outage Rate 2.9 1.4 6.1 24.
Shutdowns Scheduled Over the Next Six Months (type, date, and duration): None 25.
If Shutdown At End Of Report Period, Estimated Date Of Startup: N/A
3 IINIT SillfilX)WNS AND IUWER REDUCTIONS IX)CKET No.
50-318 i
UNIT NAl@', Calvert Cliffs 2 DATE March 7, 1986 CtM'I.I?Il:D HY R.J. Porter i
REPORT PI)N'lli February
'IEl.EI'll0NE (301) 260-4868
")
L bt0 C~
cs l
- L 0
tH O 0 -t C 0 O T C
C U l. i rt't isee E
Orm Caisse & Cor* ect g ye
~
g No.
Date g
gg 4
93g Event g
y Act. inn to E
ReixH I //
/$',s gu 1*revent Reenrretice
)
j5 y
y'ngg u
l
- 5 l
I i
86-02 8602O4 F
19.5 A
3 86-02 IB INS'IRU
'lhe main turbine tripped due
]
to a spurious high level steam 6
generator trip signal. 'lhe reactor tripped on loss of load.
i i
)
j 1
)
l I
4 l'-
Forceil Rease nt :
H t hexl:
Exhibit G-Inst ruct. ions i
S: Schetin l ec t A-14:nipment Failura (1:xplain) 14 tuinal for Preparat ion of Dat.a 15-Maint enance or Test.
241antial Scram.
Ent ry Sheet.s for I.icense C-Refueling 3-AntAwnatic Scram.
Event Report (LER) File D-Regulat ory Rest rict. ion 4-Ot her (Explain)
( NURI:G-0161 )
)
I'.-Ogw rat or 'Iraining & I.icense Examinal, ion F-Aciministrat ire G-Operat innal Error (Explain) 5 f%ibit I - same smute j
Il-Ot her (Explain) i
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-318 Calvert Cliffs Unit No. 2 Date: March 7,1986 Completed By R. Porter Telephone: (301) 260-4868 FEBRUARY Day Average Daily Power Level Day Average Daily Power Level (MWe-Net)
(MWe-Net) 1 123 17 876 2
805 18 876 3
882 19 877 4
385 20 876 5
397 21 876 6
875 22 878 7
879 23 877 8
880 24 876 9
881 25 876 10 881 26 874 11 879 27 870 12 878 28 871 13 877 14 878 15 877 16 877 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
^
l
SUMMARY
OF UNIT 1 OPERATING EXPERIENCE February 1986 2/1 At the beginning of this reporting period, the Unit was at fullload (875 MWe).
2/7 At 1100, the Unit was derated from 875 to 870 MWe.
2/27 At 1300, the Unit was rated for 875 MWe.
(
2/28 At the end of this reporting period, the Unit was at 875 MWe, reactor at 100%
power.
1 l
F
+
i 4
Rev.1 I
4
SUMMARY
OF UNIT 2 OPERATING EXPERIENCE February 1986 2/1 At the beginning of this reporting period, the Unit was operating at 10%
power (20 MWe) for filling 21 A RCP Upper Oil Reservoir. At 0850, the Unit began increasing load to full load.
2/2 At 1000, the Unit was at 100% power (870 MWe) 2/4 At 1057, the Unit was tripped when ESFAS (3 channels) tripped the reactor (subsequent troubleshooting was unable to recreate the trip).
l 2/5 At 0503, the reactor was at 5% power. By 0625, the Unit was parallelled to the grid. At 2000, the Unit was at 100% Reactor Power (875 MWe).
2/27 At 1300, the Unit was derated for 870 MWe.
f 2/28 At the end of the reporting period, the Unit was at 100% power (870 MWe).
l t
Rev.1
)
,---,-.--,..-,-_,,-..--.,.-.,n
..n,,
.., - -.., ~.,
r
.----..-,.w,_,n.,
March 6,1986 REFUELING INFORMATION REQUEST 1.
Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. I 2.
Scheduled date for next Refueling Shutdown: October 25,1986 3.
Scheduled date for restart following refueling: January 4,1987 4.
Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
September 29,1986 6.
Important licensing considerations associated with the refueling.
Reload fuel will be similar to that reload fuelinserted into the previous cycle.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1000 Spent Fuel Pools are common to Units 1 and 2 8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 1830 (b)0 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991
~
March 6,1986 REFUELING INFORMATION REQUEST
- 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
- 2. Scheduled date for next refueling shutdown: March 14,1987.
- 3. Scheduled date for restart following refueling: May 22,1987.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other licensed amendment?
Resumption of cperation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
February 13,1987
- 6. Important licensing considerations associated with refueling.
Reload fuel will be similar to that reload fuel inserted in the previous cycle.
- 7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.
(a) 217 (b) 1000 Spent Fuel Poolis common to Units I and 2.
- 8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been required or is planned, in number l
of fuel assemblies.
(a) 1830
{
(b)0
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool l
assuming the present licensed capacity and maintaining space for one full core off j
load.
April,1991 i
I 1
i
BALTIMORE GAS AND ELECTRIC CHARLES CENTER P. O. BOX 1475 BALTIMORE, MARYLAND 21203 JAMES R. LEMONS MANAGER NUCLEAR OPERATIONS DEPARTMENT March 7,1986 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20055 Attention: Document Control Desk
Subject:
February Operating Data Reports for Calvert Cliffs Units 1 and 2 (Dockets 50-317 and 50-318)
Gentlemen:
The subject reports are being sent to you as required by Technical Specification 6.9.1.6.
If there are any questions, please contact Bob Porter, (301) 260-4868.
Sincerely, f.[R. Lemons f) t ac rw 3
Nuclear Operations Department-Manager 3RL/R3P/bsb Attachments Copies:
M. Beebe (NRC)
V. P. O'Grady (BG&E)
E. K. Bewley (BG&E)
D. Reilly (INPO)
T. Foley (NRC)
P. Ross (NRC)
K. Gibbard (DOE)
- 3. A. Tiernan (BG&E)
W. 3. Lippold (BG&E)
E. Wenzinger (NRC)
T. Magette (DNR)
Technical Librarian R. R. Mills (CE)
File g>d l
g\\
.