i JOSEPH M. FARLEY NUCLFAR PL7WP (MIT 2 NARRATIVE SUMARY OF OPERATIONS February 1986 h ere were no unit shutdowns or significant power reductions during the month of February.
'Ihe f owi major safety-related maintenance was performed in the 1.
Miscellaneous corrective and preventive maintenance was performed on the diesel generators.
L e
e a60317043e e603ENI PDR ADOCK 05000364 PH R
i 1h of,
- :.:. =
r.
-. :. =
1h OPERATING DATA REPORT DOCKET NO. 50-364 DATE March 3, 198.
COMPLETED BY J.D.Woodard TELEPHONE 205-899-5156 OPERATING STATUS
- 1. Unit Name:* JOSeDh M. Farlev - Unit 2 N'888 February, 1986
- 1) Cumulative data since
- 2. % W.
7-30-81, date of commercial
. 3. I w Thennel Power (MWt):
2652 860 0Peratior;.
- 4. Nemopines W (h MWe).
- 5. Daeign Electrieel Reting (Not MWe): 829 872.2
- 6. Menununt DependeWe Capacity (Gross MWe):
829 2
- 7. Maximient Dependable Cepecity (Not MWe):
- 8. If Changes Occur in Caposity Ratings (itenes Nunnber 3 Thsough 7) Since Last Report. Gin Reasons:
N/A N/A
- 9. Power Level To Which Restricted. If Amy (Net MWe):
- 10. e-For Reserletions,if Any:
N/A O
This Month Yr.-to.Dete Cdnesistiw 672 1416 40.201
- 11. Hours la Reporthig Period
- 12. Nusaber Of Hours Reactor Was Critical 672.0 1386,2 40.192.8 0.0 0.0 138.0
- 13. Reactor Reserve Shusdown Hours
- 14. Hours Generator On-Line 672.0 1378 5 34.770.9 0.0 0,0 0.0
- 15. Unit Resern Shutdown Hours
- 16. Gross Thorinal Inergy Generated (MWH) 1.755.415 3.553.653 87.788.203
- 17. Gross Electrieel Energy Genereted (MWH) 584.936 1 I87.366 28.910.054
- 18. Net Electrieel Energy Generated (MWH) 557.696 1.130.226 27.419,466
- 19. Unit Somoe Facto, 100.0 97.4 86.5 100.0 97.4 86.5
- 20. Unit Avedobility Factor 100.I 96.1 84.2
- 21. Unit Capocay Feeter (Using MDC Net)
- 22. Unit cepecity Factor (Uning DER Net) 100.I 96.1 82.3
- 23. Unit Forced Outage Rete n.n
?.6 4.7
- 24. Shusdowns Scheduled Over Next 6 Months (Type. Dete. and Duration of Each t:
Refueling / maintenance outage, 4/4/86 approximately 5 weeks.
N/A
- 25. If Shut Down At End Of Report Period. Estinisted Date of Startup:
- 26. Units in Test Status irrior to Comniercial Operation):
Forecast Achieved INITIAL CRITICALITY 05-06-81 05-08-81 INITIAL ELECTRICITY 05-24-81 05-25-81 COMMERCIAL OPERATION 08-01-81 07-30-81 (4/77) j
7 DOCXIT NO.
50-364 UNIT 2
DATI m rch 1 1986 COMPLETED SY 3 D tJaadard F
TELEPHONE (2051899-5156 MONTl!
Februmev. 14R6
/
DAY AVERACE DAILY POWER LEVEL DAY' AYERACE DAILY POWER LEVEL plwe.Nes) plwe-Net) 832
!7 812 g,
2 Att 13 828 3
__ _ g3 2 -
826
' 4' HSA 20 R'7 3
781 21 871 4
82R 22 A?Q 7
R12 23 835 g
839 24 814 9
832 25-836 10 829
- g 817 11 R15 77 R20 837 12 2
835 13 837 3
14 R19 30 15 836 33 gg R1a INSTRUCTIONS On this formst.!!st the svenge daily unit power levet in MWe. Net for eac.5 day in the reporting month. Compute io
, the nestest whole me;swatt.
~
O
O O
Cr UNIT $80011 DOWNS AND POWER REDUCTIONS DOCKETNO. _5d-364 IMTNAME J.M.Farlev-Unit 2>.
DATE March 3.
1986 REPORT 200N114 February COMPLETED BY 3.D. Woodard TELEPl40NE (205)899-5156 b
w
.5 g
'g
- ri u--
g, ca..e a c... e 3 s ac
, Essas aj Actiu.i su E'-
D*'
- k 3
g II k A*E"' #
u U
P*"c R*#"'*"'*
2 d
THERE WERE NO UNI' SHUTI DWNS OR S1 GNIFICANT Pt MER REDUCTIONS
.DURING THE MONTH OF FEBRUARY.
I 2
3
-4 F: Fossed Reaum:
Meshud:
Eahihis G. lasasecakms S: Scheduled A-Equepmens Failwe(Emplain) l-Manual for Psepasasma of Dasa a Mainsemance of Test 2 Ma malScrass.
Emesy Seicens fw tiensee C-Refuelang 3 Assumade Sesaan.
Evens Rep.w: II.ER) File INUREG-D-Reguiasusy Resasic:km 4-Oshes (Emplami) 04688 E-Opessior Training A ticcase Emandmasius F Admainisasasive 5
G Opesassumal Lasus (Eagd4m)
Ealideia 1 - Samic Simace 19/77) 11 Oshca (Emed.in) e J
n.
_,e C
~
Alabama Power Company
- 600 North 18th Street
)-
. Post Office Box 2641 Birmmgnam, Alabama 35291' l,'.
Telephone 205 783-6090 R,'P.McDoneW Senior Vice President Fimtridge Building
/\\lOh3MOlDWCf m s~:wamor w,,
e
' March 10,1986 Docket No. 50-364 L
Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the February 1986 Monthly Operating Report for Joseph M.' Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the. Technical Specifications.
If you have any questions, please advise.
Yours very tr
~
$1 R. P. Mcdonald RPM /BCE: ash /F-2 Enclosures xc: Dir(ctor, IE (10 copies)