'O JOSEPH M. FARLEY NUCLEArs PIA R IMIT 1 NARRATIVE SLNEARY OF OPERATICNS February 1986 During the month of February there was one unit shutdown which eccurred on 2-28-86. A reactor trip occurred as a result of a dropped control ~ rod. A short existed in the containment electrical penetration for the control rod stationary and movable coil and caused the control rod to drop.
'Ihe following major safety-related maintenance was performed in the month of February.
1.
Miscellaneous corrective and preventive maintenance was performed on diesel generators.
I I
^
- %V
, pk 9
7-s
~
i O
OPERATiNo DATA REPORT 3
y DOCKET NO. 50-348 t
DATE March 3, 1986
/
' COMPLETED BY J. D. Woodard TEl.EPHONE ?ns-899-s156 s
OPWTINQ STATUS
- 1. Unit Name: J seph M. Farley - Unit 1 Notes 2 RNPeriod:
February, 1986 I) Cumulative data since 12-1-77, date of commercial 2652
'3. LicensedThennelPower(MWt):
operation 860
- 4. Nenneplete Rating (Gross MWe):
- 5. Demen Electrial Rating (Net MWe):
829 873.4
- 6. Mambauna r_,
"': Capacity (Gross MWe):
827,5
- 7. Maximises 0.,
"'- Capacity (Not MWe):
- 8. If Changes Occur in Capacity Ratings (Itenis Nussber 3 Thsough 7) Since Last Report. Give Reasons:
l N/A
- 9. Power Levelio Which Restricted.If Any (Net MWe):
N/A
- 10. Reasons For Restrictions. If Any: N/A
'Iliis Month Yr.-to.D::te Cuniulative
- 11. Hours la Reporting Period 672 1.416 72.288 664.4 1,408.4 51.041.5
- 12. Nunnbar Of Hours Reactor Was W 00 0.0 3,650.0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line -
664.4 1.408.4 49.814.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 1,741,224 3,613,933 126',490,475
- 16. Gross Thermel Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 579.440 1,203.928 40.507,308
- 18. Net Electrical Energy Generated (MWH) 550.396 1.142.470 38.140.I88
- 19. Unit Service Factor 98.9 99.5 68.9 98.'i 99.5 68.9 i
- 20. Unit Avadabdity Factor 99.0 97.5 65.9
- 21. Unit Capacwy Factor (Using MDC Nt)
'#0*O 97*3 D 3.
- D
- 22. Unit Capecity Factor (Using DER Net) 0.5 11.4 1
- 23. Unit Forced Outage Rate 1.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Durt rion of Each t:
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: March 2, 1986 1
- 26. Units In Test Status iPrior to Commercial Operation):
Forecast Achieved
)
INITIAL CRITICALITY 08-06-77 08-09-77 INITIAL ELECTRICITY 08-20-77 08-18-77 i
COMMERCIAL OPERATION.
12-01-77 12-01-77 (9/77) m
r 7
DOCKET NO.
50-348 UNIT 1'
DA17.
March 3, 1986 COMPLETED BY
.T. D. Wodard TELEPHONE (205)899-5156 St0NT11 Fa h r"'= rv. 1986 9
DAY AVERAGE DAILY PoivER LEVEL DAY' AVERACE DAILY PoivER LEVEL (MWe Net)
(31We Net) 832 832 g,
37 829
'2,
828 13 826 3
~ ' g2 f
.---... _ _ g9_.
828 4
n97 20 3
796 gg nu
'829 6
, 22 827 7
831 23 833
^
4 833 24 n11 9
829 25-832 10 827 26 831 Ig.
832 27 829 834 12
- 3 561 13 836 3
14 '
A la.
30 15 833 33 16 RTL INSTRUCUONS On this form:. list the sverste daily unit power Icvelin M%*e-Net for each day in the reporting month.Compure :o
- the nearest whole rne;swatt.
(9/77)
=o l
4
)
. --._..- _ - -. - _... -, - -.,. - _, - -. _ -, _ - _.. _ -.. -. _. - _.. -. ~, - -
.(y
-() "
- Ql DOCKET NO. 3n 44 g UNITSilUTDOWNS AND POWElt RElHICTIONS -
UNIT NAME J. M. Farley-Unit,1:
DATE ' March 3.1986 COMPT.ETED Ily
.T. D. Woodard _.
REPORT MON 118 FArmrv TEl.EPl40NE (205)5399-5156 "1
u - e Lkcasce
[v, g*L Cause & Cussective
.$'E
}
sj No.
Date
{
g S
jifi g
!!ciant #
,g p,,,,,g g,,,,,,,c,
,, g ae Evens uT Acskuilu b
du o-6
~
~
001 860228 F
7.6 A
3 86-004-00 AA PEN A reactor trip occurred as a result of a dropped control rod. A short existed in the contaiment electrical penetration for the control rod stationary and novable grippers and caused the control rod to drop.
'1he cable re-routed to spare terminals.in the penetration.
I 2
3 4
F: Fusced Reason:
Method:
Exhibit G-lassaucaiums S: Scheduled A-Eaguipuwns Failme(Emplain) 1 Manual for Pacparation of Dasa 114talancaance elTest 2 Manual Scsasa.
Ensey $hects for 1. kens.:e C-Refueling 3 Aulunutic Scsana.
Event Repint (LER) file INUREG-D Regulaiosy Restikaiun 4 Oslics (Eaplain) 016II E4)perator Tsaining & license Examinasion F-Adminisisasive 5
G Opesatumnal Essos (Euplain)
Eshabis 4 Same Sinesec es/N) ll othes (Explain)
A A
V
- a.
o Alabama Power Company -
L 600 North 12h Street
- Post Office Box 2641 '
Birmingham, Alabama 35291 Telephone 205 783-6090
.. R. P. Mcdonald i;
Senior Vice Premdent Flintridge Building AlabamaPower tre sczun ew:~ !;sW" March 10, 1986 Docket No. 50-348
- Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies _ of the February 1986 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 1, required by Section
,6.9.1.10 of the Technical Specifications.
If.you'have any questions, please advise.
Yours very ul
/
/
p%
R. P. Mcdonald RPM /BCE:amh/F-2 Enclosures xc: Director, IE (10 copies)