d D

+-

L

!?

i i

'O JOSEPH M. FARLEY NUCLEArs PIA R IMIT 1 NARRATIVE SLNEARY OF OPERATICNS February 1986 During the month of February there was one unit shutdown which eccurred on 2-28-86. A reactor trip occurred as a result of a dropped control ~ rod. A short existed in the containment electrical penetration for the control rod stationary and movable coil and caused the control rod to drop.

'Ihe following major safety-related maintenance was performed in the month of February.

1.

Miscellaneous corrective and preventive maintenance was performed on diesel generators.

I I

^

      • %V

, pk 9

7-s

~

i O

OPERATiNo DATA REPORT 3

y DOCKET NO. 50-348 t

DATE March 3, 1986

/

' COMPLETED BY J. D. Woodard TEl.EPHONE ?ns-899-s156 s

OPWTINQ STATUS

1. Unit Name: J seph M. Farley - Unit 1 Notes 2 RNPeriod:

February, 1986 I) Cumulative data since 12-1-77, date of commercial 2652

'3. LicensedThennelPower(MWt):

operation 860

4. Nenneplete Rating (Gross MWe):
5. Demen Electrial Rating (Net MWe):

829 873.4

6. Mambauna r_,

"': Capacity (Gross MWe):

827,5

7. Maximises 0.,

"'- Capacity (Not MWe):

8. If Changes Occur in Capacity Ratings (Itenis Nussber 3 Thsough 7) Since Last Report. Give Reasons:

l N/A

9. Power Levelio Which Restricted.If Any (Net MWe):

N/A

10. Reasons For Restrictions. If Any: N/A

'Iliis Month Yr.-to.D::te Cuniulative

11. Hours la Reporting Period 672 1.416 72.288 664.4 1,408.4 51.041.5
12. Nunnbar Of Hours Reactor Was W 00 0.0 3,650.0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line -

664.4 1.408.4 49.814.0

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 1,741,224 3,613,933 126',490,475
16. Gross Thermel Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 579.440 1,203.928 40.507,308
18. Net Electrical Energy Generated (MWH) 550.396 1.142.470 38.140.I88
19. Unit Service Factor 98.9 99.5 68.9 98.'i 99.5 68.9 i
20. Unit Avadabdity Factor 99.0 97.5 65.9
21. Unit Capacwy Factor (Using MDC Nt)

'#0*O 97*3 D 3.

  • D
22. Unit Capecity Factor (Using DER Net) 0.5 11.4 1
23. Unit Forced Outage Rate 1.1
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Durt rion of Each t:

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup: March 2, 1986 1
26. Units In Test Status iPrior to Commercial Operation):

Forecast Achieved

)

INITIAL CRITICALITY 08-06-77 08-09-77 INITIAL ELECTRICITY 08-20-77 08-18-77 i

COMMERCIAL OPERATION.

12-01-77 12-01-77 (9/77) m

r 7

DOCKET NO.

50-348 UNIT 1'

DA17.

March 3, 1986 COMPLETED BY

.T. D. Wodard TELEPHONE (205)899-5156 St0NT11 Fa h r"'= rv. 1986 9

DAY AVERAGE DAILY PoivER LEVEL DAY' AVERACE DAILY PoivER LEVEL (MWe Net)

(31We Net) 832 832 g,

37 829

'2,

828 13 826 3

~ ' g2 f

.---... _ _ g9_.

828 4

n97 20 3

796 gg nu

'829 6

, 22 827 7

831 23 833

^

4 833 24 n11 9

829 25-832 10 827 26 831 Ig.

832 27 829 834 12

3 561 13 836 3

14 '

A la.

30 15 833 33 16 RTL INSTRUCUONS On this form:. list the sverste daily unit power Icvelin M%*e-Net for each day in the reporting month.Compure :o

the nearest whole rne;swatt.

(9/77)

=o l

4

)

. --._..- _ - -. - _... -, - -.,. - _, - -. _ -, _ - _.. _ -.. -. _. - _.. -. ~, - -

.(y

-() "

- Ql DOCKET NO. 3n 44 g UNITSilUTDOWNS AND POWElt RElHICTIONS -

UNIT NAME J. M. Farley-Unit,1:

DATE ' March 3.1986 COMPT.ETED Ily

.T. D. Woodard _.

REPORT MON 118 FArmrv TEl.EPl40NE (205)5399-5156 "1

u - e Lkcasce

[v, g*L Cause & Cussective

.$'E

}

sj No.

Date

{

g S

jifi g

!!ciant #

,g p,,,,,g g,,,,,,,c,

,, g ae Evens uT Acskuilu b

du o-6

~

~

001 860228 F

7.6 A

3 86-004-00 AA PEN A reactor trip occurred as a result of a dropped control rod. A short existed in the contaiment electrical penetration for the control rod stationary and novable grippers and caused the control rod to drop.

'1he cable re-routed to spare terminals.in the penetration.

I 2

3 4

F: Fusced Reason:

Method:

Exhibit G-lassaucaiums S: Scheduled A-Eaguipuwns Failme(Emplain) 1 Manual for Pacparation of Dasa 114talancaance elTest 2 Manual Scsasa.

Ensey $hects for 1. kens.:e C-Refueling 3 Aulunutic Scsana.

Event Repint (LER) file INUREG-D Regulaiosy Restikaiun 4 Oslics (Eaplain) 016II E4)perator Tsaining & license Examinasion F-Adminisisasive 5

G Opesatumnal Essos (Euplain)

Eshabis 4 Same Sinesec es/N) ll othes (Explain)

A A

V

a.

o Alabama Power Company -

L 600 North 12h Street

- Post Office Box 2641 '

Birmingham, Alabama 35291 Telephone 205 783-6090

.. R. P. Mcdonald i;

Senior Vice Premdent Flintridge Building AlabamaPower tre sczun ew:~ !;sW" March 10, 1986 Docket No. 50-348

Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies _ of the February 1986 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 1, required by Section

,6.9.1.10 of the Technical Specifications.

If.you'have any questions, please advise.

Yours very ul

/

/

p%

R. P. Mcdonald RPM /BCE:amh/F-2 Enclosures xc: Director, IE (10 copies)