/ ),% UNITED STATES DISTRIBUTION
$" NUCLEAR REGULATORY COMMISSION 9.
a 8
W ASM NGTON,0. C. 20b55 Central Files PD.R
%,,*****/ MSpangler MM I 606 FMiraglia s
Mr. Bob Szalay Vice President Atomic Industrial Forum 7101 Wisconsin Avenue Bethesda, Md. 20814
Dear Bob:
Your letter of March 3, 1986 indicates that AIF is willing to support actively our efforts to develop a policy statement to apply in the event of re-activation of power plant construction projects. As a part of our effort, Dr. Spangler has completed a draft report which attempts to identify the major issues requiring NRC consideration and the status of the various projects. Much of the status information was based on reconnaissanced-level data, oral communications, and media clippings, and there is a need for validation by the utilities mentioned. It would be particularly valuable if AIF would coordinate this draft with the utilities and provide integrated industry comments, including any corrections or suggestions for improvements.
Sincerely, Origini signed 4 H. R. Oute i Harold R. Denton, Director Office of Nuclear Reactor Regulatinn
Enclosure:
Dft Major Issues in Reactivation Of Nuclear Power Plant Construction Projects cc w/ encl.
J. Taylor, EPRI onsk6 , p gg3170196 ORO 0/2O307
,/
EPBAIF '