ML20141M583

From kanterella
Jump to navigation Jump to search
Notification of 920903 Meeting W/Ge in Rockville,Md to Discuss Simplified BWR Design & SSAR Submittal.Agenda Encl
ML20141M583
Person / Time
Issue date: 08/21/1992
From: Mccree V
Office of Nuclear Reactor Regulation
To: Pierson R
Office of Nuclear Reactor Regulation
References
PROJECT-681A NUDOCS 9209020299
Download: ML20141M583 (4)


Text

_ _ _ _ _ _

.f'ra as c

,o o

,'N UNITED $TATES E

NUC EAR REGULATORY COMMISSION n

.,E WASHWGTON, 0.0.20555 k....,/

August 21, 1992 i

Project No. C81 MEMORANDUM FOR:

Robert C. Pierson, Director Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation FROM:

Victor H. McCree, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

SUBJECT:

NOTICE OF MEETING WITH GE NUCLEAR ENERGY (GE) TO DISCUSS THE SIMPLiflED BOLLING WATER REACTOR (SBWR) DESIGN AND THE STANDARD SAFETY ANALYSIS REPORT (SSAR) SUBMITTAL DAiE & TIME:

September 3, 1992 8:30 a.m. - 5:00 p.m.

LOCATION:

Holiday Inn Crowne Plaza. Conference Theater 1750 Rockville Pike Rockville, Maryland 20852 PURPOSE:

GE will present a desion overview of SBWR safety and non-safety systems. A cop) at the agenda is enclosed, hIb$ Ib kb p ~j ; u /

, ^

joO 9209020299 920021 t\\t PDR PROJ

\\

681A PDR

2 4 August 21, 1992 PARTICIPANTS *:

IE EE J. H. Wilson R. McCandless V. McCree M. Ross et al.

C. Sawyer R. Townsend R. Chalberg D. Gluntz J. Bacchler VictorWMTf?B4fhtroject Mariager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Penewal Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page

  • Meetings between the NRC technical staff and applicants or licensees are open f

for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to *0 pen Meeting Statement of NRC Staff Policy, 43 federal Reaister 28058, 6/28/78. Members of the public who wish to attend should contact the project manager, V. McCree, at (301) 504-1121.

_ DISTRIBUTION:

l Docket File PDST R/F 1Murley/fMiraglia DCrutchfield NRC PDR Wiravers LPlisco, 12G18 JNorberg, 7E23 AChaffee, EAB THiltz-FEltawila, NLN344 GBagchi, 7H15 VMcCree RPierson JNWilson RCaruso. 8E23 RBorchardt RNease CPoslusny SNewberry, 8H7 PShea_

TBoyce OPA FRosa, llE4 r

JMoore, 15B18 GGrant,'EDO EJordan, MNBB3701 CMcCracken, SDI P0' Dell, PTSB ACRS (10)

ETana, PMAS RJones, 8E2 RPerch, 8H7 PMcKee, 9D24 GZech, 10A19 JWermiel, 10D24 i

LShotkin, NLN353 FCoffman, NLN316 KKniel, NLS314-CAder,NLS324 MCunningham, NLS372 RBaer, NLS302 CSerpan, NLS217C MVagins, NLS2178

-AMurphy, NLS217A ZRosztoczy,NLSlfi9-QgT, 7H15 Shou, 7H15

-$CfPjbf:

OfC:

LA:PDST:'ADAR PM:PDST:ADAR ADAR NAME:

PShea g)

VMcCree p, JNWii[on DATE:

'08/M92_

08/21/92 08/M/92 OfflCIAL DOCUMENT COPY: MTG903.VM

I e

4 General Electric Company Project No. 681

(

cc:

Mr. Patrick W. Marriott, Manager Licensing & Consulting Services GF Nuclear Energy 175 Curtner Avenue San Jose, California 95125 Mr. Pnbert Mitchell Gene.%: Electric Company 175 Curtner Avenue San Jose, California 95114 Mr. L. Gifford, Program Manager Regulatory Programs GE Nuclear Energy 12300 Twinbrook Parkway Suite 315 Rockville, Maryland 20852 Director, Criteria & Standards Division Office of Radiation Programs U. S. Environmental Protection Agency 401 M Street, S.W.

Washington, D.C.

20060 Mr.~ Daniel F. Giessing U. S. Department of Energy NE-42 Washington, D.C, 20585 Mr. Mark McCabe U.S. Department of Justice /EAG 555 4th Street, N.W.

Room 11-809 Washington, D.C.

20001 i

l

i K.

Enclosure SBWR SSAR SUBMITTAL AND TECHNICAL INTRODUCTION Holiday Inn Crowne Plaza Conference Theatre Rockville, Maryland Thursday, September 3, 1992 8:30 a.m. - 5:00 p.m.

TOELC DURATION Welcome 10 min.

1.

-Introduction /ProgramOverview 10 min.

-2.

Design Overview - Systems Integration I hr. 30 min.

-and Performance, including PRA influence in the design process

    • BREAK **

15 min.

3.

Testing Overview - including SBWR 30 min.

specific tests and tests from the

-ABWR 41-Containment and Reactor Building I hr.

Design e

    • LUNCH **

'5..

Planti. Control and Electrical Systems I hr. 30 min.

    • BREAK **

15 min.

6..

R'eactor System Engineering.

1-hr.

7.

Safety and Auxiliary System Design I hr.

8.

' Certification Schedule 30 min.

t P

F b-

-. ~.

~._,__

.