Text
34 Chog i Per Cr.mpany pp"
' do hvemess C:nter Pgtkwrj Ford CHfm Dos 1295 as -4l' Birmeighs% Alabama 35201 Telephone 205 877 7122 ;
i C. Ki McCor Ge ;rgiaIbwer
- V,co PresM Nuclear -
Vogtie Propct tre scuMo %rFc wern August 5, 1992 MSV-01069 43036
-Docket No.
50-425-U. S. Nuclear Regulatory Commission ATTN.: Document. Control Desk Washington, D. C.
20555 Gentlemen:
V0GTLE ELECTRIC GENERATING PLANT JfLSLRVICE INSPECTION
SUMMARY
REPORT Enclosed are LVolumes 1 and 2 of the Vogtle Electric Generating Flant, Unit
'2:(VEGP-2)-Inservice Inspection (ISI) Final Report which constitute the "0wner's Report for Inservice Inspection-(Form NIS-1)" required by Subsubarticle IWA-6230 of the American Society of Mechanical Ecgineers
- (ASME) Boiler and Pressure Vessel Code,Section XI, 1983 Edition with
. Addenda through Summer 1983.
Inservice inspection activities conducted at
<VEGP-2 during the Spn ng 1992 maintenance / refueling outage are discussed therein. Also included therein-are "0wner's ' Reports for Repairs or
. Replacements (Form NIS-2)" for repairs and/or replacements documented at VEGP-2 from the end of the previous maintenance / refueling outage through the Spring 1992 ' maintenance / refueling outage.
In addition, several NIS-2 reports on repairs and/or replacements which were inadvertently omitted c
from the previous VEGP-2 inservice inspection summary report are specifically: identified in the enclosed Volume 2.
Volumes 3 through 7 of the ISI Final! Report contain information not typically provided la the "0wner's Repcrt for'Insarvice Insp ction (Form NIS 1)"; e.g., personnel
. ],
certifications, nonda ;ructive examination procedures, etc., and are not c'
included ~ herein.
Volumes 3 through 7, however, are available for review W
'upon.reque:t at the plant site.
With regard to.the NIS-2 reports on repairs and/or replacements, only the Ecompleted'NIS-2 forms are being submitted. Any attachments, e.g., code data reports, etc., that are referenced in the completed NIS-2 forms will be made available for review upon request 'at the plant site.
Contained.in the VEGP-2 "0wner's Report for Inservice Inspection (Form i
NIS-1)" is a discussion on the inspection of steam generator. tubes performed during the Spring 1992 maintenance / refueling outage. That discussion constitutes the Special Report required by VEGP Technical
> Specification 4.4.5.5.b-to' be submitted to the U. S. Nuclear Regulatory P
Commission (USNRC)'within 12 months following completion of the steam
- generator. tube inspections. Accordingly, there will not be a separate submittal made to the USNRC on the inspection of the steam generator tubes
'h I
=
9209100159 920005 k
PDR-ADOCK 05000425 m
-Y x
U.. S. Nuclear Regulatory Commission n
MSV-01069 Page Two E
performed during the subject outage. By copy of this letter, the appropriate USNRC Regional Administrator is being provided topies of the enclosed-report volumes; thus, compliance with the requirements of VEGP Technical Specification 6.8.2 for submittal of Special Reports to the appropriate Regional Administrator is met.
By Gecrgia Power Company (GPC) letter MSV-00703 dated September 23, 1991, the USNRC was notified of the use of potentially defective Magnaflux material at VEGP-2 during its first maintenance / refueling outage (Fall 1990). The subject Magraflux material was subsequently recalled as discussed in USNRC Information Notice 91-31, " Nonconforming Magnaflux Magnetic Particle (14AM)-Prepared Bath", dated May 9, 1991.
Components which were examined using potentially defective material included selected Reactor Pressure Vessel (RPV) closure head studs and nuts.
Since the l
potcetially defective material had been used unknowingly at the time, GPC i
f
. committed to re-examine the RPV closure head studs and a portion of the
- nuts during the next maintenar,ce/ refueling outage (Spring 1992). The l
specific components examined and the results thereof are itemized in the 6
enclosed Volume 1.
Five copies:of Volumes 1 and 2 of the ISI Final Report for the Spring 1992 h
maintenance / refueling outage are provided for your review.
Two copies of L
the subject report volumes are being prov$ id to the Regional Administrator for.USNRC Region II, s
LShould there be any questions in this regard, please contact this office.
Sincerely, f
C. K. McCoy CKM/JAE/jae f
Enclosures:
Volumes 1 and 2 of VEGP-2 ISI Final Report, Second Maintenance / Refueling Outage (Period 1/ Interval 1)
[
xc: Georaia Power Company J
Mr. S. H. Chesnut (w/o enc.)
Mr. M.'Sheibani (w/o enc.)
+
Mr. W. B. Shipman (w/o enc.)
{
NORMS (w/ enc.)~
p U. S. Nuclear Reoulatory Commissioll Mr. S. D. Ebneter, Regional Administrator (w/ enc.)
Mr. D. S. Hood, Licensing Project Manager, NRR (w/ enc.)
Mr. B. R. Bonser, Senior Resident Inspec 3r, Vogtle (w/ enc.)
n