ML20141M179
| ML20141M179 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 03/10/1992 |
| From: | Beck G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20141M181 | List: |
| References | |
| NUDOCS 9204020072 | |
| Download: ML20141M179 (3) | |
Text
-
10 CFR 50 Appendix E, section v I'llli.ADEl.l'Ill A El.ECTitlC CO. il'ANY N
NUCl. EAR GROUP litiADQUAKrliRS 955-65 CitESTERilROOK llLVD.
WAYNE PA 19087 5691 (215) 640 6000 utict.L Ak i NOINE l.k1MO A $l kVlCl3 (DilPOIMl NT March 10, 1992 Docket Nos. 50 277 50-278 License Nos.
DPR-44 DPR-56 U.S. Nuclear Regulatcry Commission Attnt Document Control Desk Washington, DC 20555
SUBJECT:
Peach Bottom Atomic Power Stat.lon, Units 2 and 3 Emergency Plan Implementing Procedures Dear S!rt Enclosed are revisions 74, 75, and 76 to the Emergency Responso Procedores for Pooch Bottom Atomic Power Station, Units 2 and 3.
These procedures are being submitted in accordance with 10 CFR 50.54(q), 10 CFR 50 - Appendix E, and 16 CFR 50.4.
The
~
follcwing revised procedures are enclosed.
REVISION 74 p
ERP 21 Rev.
2
" Alternate Emergency Operations Facility (Alt EOF) Activation" Cancelled - No Replacement REVISION 75 ERP-215 Rev.
O
" Planning and Scheduling
)
Coordinator (P&SC)"
Cancelled - No j;[
[,,/ [)[j[c{
Replacement c.'
'lM1
/
I 9204020072 920310 i
i PDR ADOCK 05000277
\\
V PDR bb^C o
t
- s e Peach Bottom Atomic Power Station _
March 10, 1992 i
Emergency Plan Implementing Procedures Page 2 J
REVISION 76 ERP-140 Rev.
6
" Telephone Lists for Emorgency Use" ERP-215 Rev.
O
" Planning & Scheduling Coordinat.or" (P&SC)
ERP-270 Rev.
2
" Alternate Emergency Operations Facility (ALT-EOF) Activation" ERP-316 Rev.
3
" Cumulative Population Dose Calculations for Airborne Releases -
Manual Method" ERP-317 Rev.
3
" Determination of L
Protective Action i
Recommendations" f
.ERP-320 Rev.
-2 "Use of the Containment
{
Radiation Monitor to j
Estimate Release Source i~
Term and Noble' Gas i
Monitor Readings" i
l ERP-400 Rev.
i
. 1
" Chemistry Sampling and Analysis Team Leader" l
(CSATL)
In accoraance with 10 CFR 2.790(a)(6), we request that names 0
and telephene numbers contained in these procedures be withheld
-from public disclosure since such disclosure would constitute an unwarranted. invasion of the personal privacy of the individuals
-involved.
Due to administrative problems that occurred during.the processing of these-procedures,:chey are not being submitted
.within the required 30~ day report period.
We apologize for the delay and regret any inconvenience this may have caused.
,.~,
Peach Bottom Atomic Power Station March 10, 1992 Emergency Plan Implomonting Procedures Pago 3 If you have any questions or require additional information, picano contact us.
Sincoroly,
/
/
G. J Bock, Manager Licensing Section Nucioar Engineering & Services Enclosuro cc:
T. T. Martin, Administrator, Region I, USNRC (2 copios)
J. J. Lyash, USNRC Senior. Resident Inspector, PDAPS O
a
(
I
...