ML20141M179

From kanterella
Jump to navigation Jump to search
Forwards PDR Version of Revised Emergency Response Procedures (Erp),Including Rev 6 to ERP-140,Rev 0 to ERP-25, Rev 2 to ERP-220,Rev 3 to ERP-316,Rev 3 to ERP-317,Rev 2 to ERP-320 & Rev 1 to ERP-400.W/920330 Release Memo
ML20141M179
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/10/1992
From: Beck G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20141M181 List:
References
NUDOCS 9204020072
Download: ML20141M179 (3)


Text

-

10 CFR 50 Appendix E, section v I'llli.ADEl.l'Ill A El.ECTitlC CO. il'ANY N

NUCl. EAR GROUP litiADQUAKrliRS 955-65 CitESTERilROOK llLVD.

WAYNE PA 19087 5691 (215) 640 6000 utict.L Ak i NOINE l.k1MO A $l kVlCl3 (DilPOIMl NT March 10, 1992 Docket Nos. 50 277 50-278 License Nos.

DPR-44 DPR-56 U.S. Nuclear Regulatcry Commission Attnt Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Stat.lon, Units 2 and 3 Emergency Plan Implementing Procedures Dear S!rt Enclosed are revisions 74, 75, and 76 to the Emergency Responso Procedores for Pooch Bottom Atomic Power Station, Units 2 and 3.

These procedures are being submitted in accordance with 10 CFR 50.54(q), 10 CFR 50 - Appendix E, and 16 CFR 50.4.

The

~

follcwing revised procedures are enclosed.

REVISION 74 p

ERP 21 Rev.

2

" Alternate Emergency Operations Facility (Alt EOF) Activation" Cancelled - No Replacement REVISION 75 ERP-215 Rev.

O

" Planning and Scheduling

)

Coordinator (P&SC)"

Cancelled - No j;[

[,,/ [)[j[c{

Replacement c.'

'lM1

/

I 9204020072 920310 i

i PDR ADOCK 05000277

\\

V PDR bb^C o

t

- s e Peach Bottom Atomic Power Station _

March 10, 1992 i

Emergency Plan Implementing Procedures Page 2 J

REVISION 76 ERP-140 Rev.

6

" Telephone Lists for Emorgency Use" ERP-215 Rev.

O

" Planning & Scheduling Coordinat.or" (P&SC)

ERP-270 Rev.

2

" Alternate Emergency Operations Facility (ALT-EOF) Activation" ERP-316 Rev.

3

" Cumulative Population Dose Calculations for Airborne Releases -

Manual Method" ERP-317 Rev.

3

" Determination of L

Protective Action i

Recommendations" f

.ERP-320 Rev.

-2 "Use of the Containment

{

Radiation Monitor to j

Estimate Release Source i~

Term and Noble' Gas i

Monitor Readings" i

l ERP-400 Rev.

i

. 1

" Chemistry Sampling and Analysis Team Leader" l

(CSATL)

In accoraance with 10 CFR 2.790(a)(6), we request that names 0

and telephene numbers contained in these procedures be withheld

-from public disclosure since such disclosure would constitute an unwarranted. invasion of the personal privacy of the individuals

-involved.

Due to administrative problems that occurred during.the processing of these-procedures,:chey are not being submitted

.within the required 30~ day report period.

We apologize for the delay and regret any inconvenience this may have caused.

,.~,

Peach Bottom Atomic Power Station March 10, 1992 Emergency Plan Implomonting Procedures Pago 3 If you have any questions or require additional information, picano contact us.

Sincoroly,

/

/

G. J Bock, Manager Licensing Section Nucioar Engineering & Services Enclosuro cc:

T. T. Martin, Administrator, Region I, USNRC (2 copios)

J. J. Lyash, USNRC Senior. Resident Inspector, PDAPS O

a

(

I

...