ML20141L876
| ML20141L876 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/28/1997 |
| From: | Stephen Dembek NRC (Affiliation Not Assigned) |
| To: | Carns N NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20141L878 | List: |
| References | |
| TAC-M98123, NUDOCS 9706030085 | |
| Download: ML20141L876 (4) | |
Text
I
~
Mr. Neil S. Carns Senior Vice President May.28, 1997
}
and Chief Nuclear Officer Northeast Nuclear Energy Company c/o Ms. Patricia A. Loftus Director - Regulatory Affairs P. O. Box 128 Waterford, CT 06385
SUBJECT:
MILLSTONE NUCLEAR POWER STATION, UNIT 1 - ISSUANCE OF AMENDMENT ON ALLOWABLE OUTAGE TIMES (TAC N0. M98123)
Dear Mr. Carns:
I The Commission has issued the enclosed Amendment No.101 to Facility Operating License No. DPR-21 for the Millstone Nuclear Power Station, Unit 1, in response to your application dated March 6, 1997.
The amendment revises the Technical Specifications on allowed outage times for certain protective instrumentation and also for reactor building access control. The amendment adopts, in part, guidance from NUREG-0123, " Standard Technical Specifications for General Electric Boiling Water Reactors (BWR/5),"
Revision 3, and NUREG-1433, " Standard Technical Specifications General Electric Plants BWR/4," Revision 1.
i A copy of the related Safety Evaluation is also enclosed.
Notice of Issuance will be included in the Commission's biweekly Federal Reaister notice.
Sinc rely, QL
/b Stephen Dembek, Project Manager Special Projects Office - Licensing Office of Nuclear Reactor Regulation Docket No. 50-245
Enclosures:
1.
Amendment No. lol.to DPR-21 2.
Safety Evaluation cc w/encls:
See next page
/
/'
DISTRIBUTION:
A Docket File OGC U
PUBLIC ACRS SP0-L Reading GHill(2) hhy SP0 Reading CGrimes hbJ$-
a r vers JDurr,RI g
LBerry i
DOCUMENT NAME:
G:\\DEMBEK\\M98123.AMD
- See previous concurrence To receive e copy of this document. Indicate in the boa: "C" Copy without ettechrnent!onclosure "E" Copy wnh attachment / enclosure
- N* = No copy 0FFICE SPO-L:PMl SP0-L:L W $ *HICB:BC
- SCSB:BC l
- 0GC l
SPW:lDD l
NAME SDembek@
LBerry M J JWermiel CBerlinaer_
Rgachmann Pfilked DATE 05/n/97 05/AV97 04/22/97 04/25/91
({ f 97 05/D /97 0FFICIAL RECORD COPY
~
020023 9706030085 970528
~
PDR ADOCK 05000245 P
l k
UNITED STATES g
j NUCLEAR REGULATORY COMMISSION
'S WASHINGTON, D.C. 20565-0001 8
May 28,,1997
%g * *. + j l
Mr. Neil S. Carns l
Senior Vice President and Chief Nuclear Officer Northeast haclear Energy Company c/o Ms. Patricia A. Loftus Director - Regulatory Affairs P. O. Box 128 Waterford, CT 06385
SUBJECT:
MILLSTONE NUCLEAR POWER STATION, UNIT 1 - ISSUANCE OF AMENDMENT ON ALLOWABLE OUTAGE TIMES (TAC NO. M98123) 1
Dear Mr. Carns:
The Commission has issued the enclosed Amendment No.101 to Facility Operating
{
License No. DPR-21 for the Millstone Nuclear Power Station, Unit 1, in response to your application dated Mart.h 6,1997.
The amendment revises the Technical Specifications on allowed outage times for certain protective instrumentation and also for reactor building access control. The amendment adopts, in part, guidance from NUREG-0123, " Standard Technical Specifications for General Electric Boiling Water Reactors (BWR/5),"
Revision 3, and NUREG-1433, " Standard Technical Specifications General Electric Plants BWR/4," Revision 1.
A copy of the related Safety Evaluation is also enclosed.
Notice of Issuance will be included in the Commission's biweekly Federal Reaister notice.
Sincerely,
- Y l~
e
/
k Stephen Dembek, Project Manager Special Projects Office - Licensing i
Office of Nuclear Reactor Regulation Docket No. 50-245
Enclosures:
1.
Amendment No.101 to DPR-21 2.
Safety Evaluation cc w/encls: See next page l
l t
t Northeast Nuclear Energy Company Millstone Nuclear Power Station i
Unit I cc:
Lillian M. Cuoco, Esquire Mr. Wayne D. Lanning i
Senior Nuclear Counsel Deputy Director of Inspections Northeast Utilities Service Company Special Projects Office P. O. Box 270 475 Allendale Road Hartford, CT 06141-0270 King of Prussia, PA 19406-1415 Mr. Kevin T. A. McCarthy, Director Mr. F. C. Rothen Monitoring and Radiation Division Vice President - Work Services Department of Environmental Northeast Nuclear Energy Company Protection P. O. Box 128 79 Elm Street Waterford, CT 06385 Hartford, CT 06106-5127 Ernest C. Hadley, Esquire Mr. Allan Johanson, Assistant 1040 B Main Street Director P. O. Box 549 Office of Policy and Management West Wareham, MA 02576 Policy Development and Planning Division Mr. John Buckingham i
450 Capitol Avenue - MS# 52ERN Department of Public Utility Control P. O. Box 341441 Electric Unit Hartford, CT 06134-1441 10 Liberty Square New Britain, CT 06051 Regional Administrator Region I Mr. J. K. Thaye' U.S. Nuclear Regulatory Commission Recovery Offica - Nuclear 475 Allendale Road Engineering anc Support j
King of Prussia, PA 19406 Northeast Nuclear Energy Company P. O. Box 128 First Selectmen Waterford, CT 06385 Town of Waterford Hall of Records Mr. B. D. Kenyon 200 Boston Post Road President and Chief Waterford, CT 06385 Executive Officer Northeast Nuclear Energy Company Mr. D. M. Goebel P. O. Box 128 Vice President - Nuclear Oversight Waterford, Connecticut 06385 Northeast Nuclear Energy Company P. O. Box 128 Senior Resident Inspector Waterford, CT 06385 Millstone Nuclear Power Station c/o U.S. Nuclear Regulatory Mr. J. P. McElwain Commission Recovery Officer - Millstone Unit 1 P.O. Box 513 Northeast Nuclear Energy Company Niantic, CT 06357 P. O. Box 128 Waterford, CT 06385
Northeast Nuclear Energy Company Millstone Nuclear Power Station Unit 1
~
CC:
'l The Honorable Terry Concannon Co-Chair Nuclear Energy Advisory Council Room 4035 Legislative Office Building Capitol Avenue Hartford, Connecticut 06106 I
Mr. Evan W. Woollacott j
Co-Chair
~
Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, Connecticut 06070
\\
. Citizens Regulatory Commission i
ATTN: Ms. Susan Perry Luxton i
180 Great Neck Road l
Waterford, Connecticut 06385 Deborah Katz, President 4
Citizens Awareness Network P. O. Box 83 Shelburne Falls, MA 03170 Little Harbor Consultants, Inc.
Millstone - ITP0P Project Office P. O. Box 0630 Niantic, Connecticut 06357-0630
-