ML20141L042

From kanterella
Jump to navigation Jump to search
Forwards LER 97-010-00 Re Postulated Pipe Break Pressure Relieving Pathway Boundary Door Open During Power Operation. Ltr Contains Listed Commitments
Date released: 06/03/2020 Download: ML20141L042


:on 970420,postulated Pipe Break Pressure Relieving Pathway Boundary Door Found Opened During Power Operation.Caused by Human Performance in That Door Was Not Closed After Maint Activity.Obtained Lock & Closed Door
ML20141L818
Person / Time
Site: Pilgrim
Issue date: 05/20/1997
From: Ellis D
BOSTON EDISON CO.
To:
References
Download: ML20141L818 (9)
Forwards LER 97-010-00 Re Postulated Pipe Break Pressure Relieving Pathway Boundary Door Open During Power Operation. Ltr Contains Listed Commitments
ML20141L040
Person / Time
Site: Pilgrim
Issue date: 05/20/1997
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20141L040 (1)