ML20141K943
| ML20141K943 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 05/27/1997 |
| From: | Von Suskil J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20141K945 | List: |
| References | |
| NUDOCS 9706020154 | |
| Download: ML20141K943 (1) | |
Text
-
h h
Lim: rick cenerating st: tion Sd' Y 3
~
V PECO NUCLEAR FJffar!"a" A Unit of PECO Energy Sanatoga. PA 19464-0920 T.S. 6.9.1.1 6.9.1.2 6.9.1.3 i
May 27, 1997 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Unit 2 Startup Test Report Attached is the Startup Test Report which summarizes the startup testing performed on Limerick Generating Station Unit 2 following installation of fuel of a different design during the fourth Unit 2 Refueling Outage.
This startup report is being submitted in l
accordance with the requirements of Technical Specifications Sections 6.9.1.1 through 6.9.1.3.
1 If you have any questions please contact James Gilbert at (610) l 718-3567.
)
Sincerely, Vl%
a es D. von Suskil - Director, Site Engineering i
j DMS:cah cc:
H. J. Miller, Administrator Region I, USNRC N. S.
Perry, USNRC Senior Resident Inspector, LGS
(
L):.T. )Q2 )
300059 f
PDR t