Forwards PECO Nuclear Limerick Generating Station Unit 2 Startup Test Rept Cycle 5, Which Follows Installation of Fuel of Different Design During Fourth Unit 2 Refueling Outage
ML20141K943
Person / Time
Site: Limerick 
Issue date: 05/27/1997
From: Von Suskil J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20141K945 List:
References
NUDOCS 9706020154
Download: ML20141K943 (1)


Text

-

h h

Lim: rick cenerating st: tion Sd' Y 3

~

V PECO NUCLEAR FJffar!"a" A Unit of PECO Energy Sanatoga. PA 19464-0920 T.S. 6.9.1.1 6.9.1.2 6.9.1.3 i

May 27, 1997 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Unit 2 Startup Test Report Attached is the Startup Test Report which summarizes the startup testing performed on Limerick Generating Station Unit 2 following installation of fuel of a different design during the fourth Unit 2 Refueling Outage.

This startup report is being submitted in l

accordance with the requirements of Technical Specifications Sections 6.9.1.1 through 6.9.1.3.

1 If you have any questions please contact James Gilbert at (610) l 718-3567.

)

Sincerely, Vl%

a es D. von Suskil - Director, Site Engineering i